Step 3: Remembering the Sub A/c Codes
Don't Worry! In this Step you don't need to remember all the Sub A/c Codes. Here you will get a list of all the A/c Codes of KPTCL as well as Important A/c Codes of ESCOMS!
As you are now thorough with the A/c Groups and Main A/c Codes it is super easy to locate any Sub A/c Code!
You just need to note down the important A/c Codes asked in the previous question papers and try to remember those A/c Codes along with similar type/related A/c Codes that might be asked in the coming Question Paper!
I hope this process might Helped you in remembering the A/c Codes. I will try to give list of Important A/c Codes for Exam purpose. Until then try yourself and make a list of Important A/c Codes!
Important: Try to understand!
- Why Assets & Expenditures show debit balance and Liabilities & Incomes show credit balance?
- When One A/c Code is debited correspondingly which A/c Code should be credited vice versa and Why?
It will help you in Exams as well as Day to day Workings!
Tips:
- Use "Desktop Mode" option in Chrome browser if you are not able to see the A/c Codes Description completely.
- To Search the required A/c Code easily use 'Ctr+F' in systems or 'Find in page' option in Chrome browser.
To Recall
Step 1 - Click here..
Step 2 - Click here..
Good Luck!
|
AC HEAD |
DESCRIPTION |
|
|
10.000 |
- |
Fixed
Assets |
|
10.100 |
- |
Land & Land
Rights |
|
10.101 |
- |
Land owned under full
title. |
|
10.102 |
- |
Land held under lease |
|
10.103 |
- |
Costs of land development
on lease- hold |
|
10.200 |
- |
Buildings |
|
10.202 |
- |
Buildings containing
Hydro-Electric Power Generating Plant. |
|
10.203 |
- |
Buildings containing
Diesel Electric Generating Plant |
|
10.207 |
- |
Buildings containing
transmission installations. |
|
10.208 |
- |
Buildings containing
distribution installations |
|
10.211 |
- |
Office Building |
|
10.221 |
- |
Ancillary Buildings |
|
10.222 |
- |
Residential colony for
staff |
|
10.223 |
- |
Other Buildings |
|
10.224 |
- |
Internal Wiring |
|
10.225 |
- |
Wire fencing |
|
10.300 |
- |
Water Supply &
Sewerage Arrangements |
|
10.301 |
- |
Hydraulic works forming
part of Hydroelectric system - dams, spillways, |
|
10.302 |
- |
Hydraulic works forming
part of Hydroelectric system, reinforced |
|
10.303 |
- |
Sweet water arrangement
including reservoir etc., |
|
10.304 |
- |
Sweet water
arrangement(including water storage tank etc), Plant and Pipelines for water
supply in residential colony. |
|
10.305 |
- |
Drainage and Sewerage
System- Residential colony |
|
10.400 |
- |
Civil Works |
|
10.401 |
- |
Pucca Roads |
|
10.402 |
- |
Kutcha Roads |
|
10.403 |
- |
Railway Sidings |
|
10.404 |
- |
Other Civil Works - Plant
foundation |
|
10.405 |
- |
Other Civil Works - Cable
trenches |
|
10.500 |
- |
Plant and Machinery |
|
10.508 |
- |
Auxiliaries in Diesel
Electric Generation Plant |
|
10.516 |
- |
Oil srage tanks / oil handling
plant and equipment. |
|
10.530 |
- |
Diesel Electric
Generating Power Plant |
|
10.531 |
- |
Hydel Power Generating
Plant |
|
10.532 |
- |
Plant foundation for
Hydel power generating plant |
|
10.533 |
- |
Plant foundation for
diesel electric generating plant. |
|
10.535 |
- |
Auxiliaries in Hydel
Power Plant. |
|
10.541 |
- |
Transmission plant
-Transformers having a rating of 100 KVA and above. |
|
10.542 |
- |
Other Transformers
-(Below 100 KVA) |
|
10.543 |
- |
Other transmission plant
- Transformer kiosks, Sub-station equipment and other Fixed apparatus. |
|
10.551 |
- |
Material handling
equipment Earthmovers / Bulldozers. |
|
10.552 |
- |
Material handling
equipment - Cement Mixer |
|
10.553 |
- |
Material handling
equipment – Cranes |
|
10.555 |
- |
Materials handling
equipment – Others |
|
10.560 |
- |
Low tension Alternating
current(L.T.A.C.) Panel |
|
10.561 |
- |
Switchgear including
cable connections. |
|
10.563 |
- |
Batteries including
charging equipment. |
|
10.564 |
- |
Battery set |
|
10.565 |
- |
Fabrication shop /
workshop plant and equipments. |
|
10.566 |
- |
Direct current
distribution box |
|
10.567 |
- |
Lightning arrestors-Pole
Type. |
|
10.568 |
- |
Lightning Arrestor –
Station Type |
|
10.569 |
- |
Battery Charger |
|
10.571 |
- |
Communication equipment -
Radio and high frequency carrier system |
|
10.572 |
- |
Communication equipment -
telephone lines and telephones. |
|
10.573 |
- |
Communication equipment –
Mobile Phones |
|
10.574 |
- |
Static machine tools and
equipment |
|
10.575 |
- |
Digital cameras |
|
10.576 |
- |
Air conditioning plant –
static |
|
10.577 |
- |
Air conditioning plant –
Portable |
|
10.578 |
- |
Computers and its
peripherals |
|
10.579 |
- |
Remote Terminal
Unit-R.T.U. |
|
10.580 |
- |
Refrigerators and water
coolers |
|
10.581 |
- |
Meter testing laboratory
tools and equipment |
|
10.582 |
- |
Equipment in Hospitals /
Clinics |
|
10.583 |
- |
Tools and Tackles |
|
10.584 |
- |
Weighing scales |
|
10.585 |
- |
Drawing Board instruments |
|
10.586 |
- |
Fire Extinguishers |
|
10.587 |
- |
Solar Roof Top equipment
installed on BESCOM buildings |
|
10.591 |
- |
Roof top/Other solar
plant Installations |
|
10.599 |
- |
Other Miscellaneous
Equipments. |
|
10.600 |
- |
Lines, Cable
Network etc, |
|
10.601 |
- |
Overhead lines(Towers,
Poles, Fixtures, Overhead Conductors and Devices)- Lines on fabricated steel
supports. |
|
10.602 |
- |
Overhead lines(Towers,
Poles, Fixtures, Overhead Conductors and Devices) - Lines on Reinforced
Concrete Supports. |
|
11.603 |
- |
Overhead lines(Towers,
Poles, Fixtures, Overhead Conductors and Devices) - Lines on treated wood
Supports. |
|
10.605 |
- |
Transmission lines 66KV
& above–Towers |
|
10.606 |
- |
Transmission lines 66KV
& above– Conductors |
|
10.611 |
- |
Under ground cables
including joint boxes and disconnecting boxes. |
|
10.612 |
- |
Under ground Cables -
Cable duct system |
|
10.613 |
- |
Fiber optic |
|
10.614 |
- |
Control cables |
|
10.621 |
- |
Service connections |
|
10.631 |
- |
Metering equipments. |
|
10.632 |
- |
Metering equipment –
Electronic / Electro mechanical meters |
|
10.633 |
- |
Metering equipment-
Prepaid |
|
10.641 |
- |
Street lighting in
Residential Colonies & Station premises. |
|
10.685 |
- |
Miscellaneous Equipments |
|
10.700 |
- |
Vehicles |
|
10.710 |
- |
Trucks, Tempos, Trekkers
etc. |
|
10.720 |
- |
Buses including mini
buses. |
|
10.730 |
- |
Jeeps, Vans, and Motor
cars |
|
10.740 |
- |
Other vehicles |
|
10.800 |
- |
Furniture &
Fixtures |
|
10.888 |
- |
Fixed Assets- Contra
account |
|
10.899 |
- |
Fixed Assets-Turnkey
Works Bills not Received Intermediary Account. |
|
10.900 |
- |
Office Equipment |
|
10.901 |
- |
Calculators |
|
10.902 |
- |
Typewriters |
|
10.903 |
- |
Cash Registers / Cash
chest |
|
10.904 |
- |
Duplicators / Xerox /
Copiers. |
|
10.905 |
- |
Franking Machines |
|
12.000 |
- |
Provision
for Depreciation on Fixed Assets |
|
12.100 |
- |
Depreciation
Provision - Land & Land Rights |
|
12.102 |
- |
Depreciation provision –
Land held under lease |
|
12.103 |
- |
Depreciation provision –
Costs of land development on lease- hold |
|
12.200 |
- |
Depreciation
Provision - Buildings |
|
12.202 |
- |
Depreciation provision –
Buildings containing Hydro-Electric Power Generating Plant. |
|
12.203 |
- |
Depreciation provision –
Buildings containing Diesel Electric Generating Plant |
|
12.207 |
- |
Depreciation provision –
Buildings containing transmission installations. |
|
12.208 |
- |
Depreciation provision –
Buildings containing distribution installations |
|
12.211 |
- |
Depreciation provision –
Office Building |
|
12.221 |
- |
Depreciation provision –
Ancillary Buildings |
|
12.222 |
- |
Depreciation provision –
Residential colony for staff |
|
12.223 |
- |
Depreciation provision –
Other Buildings |
|
12.224 |
- |
Depreciation provision –
Internal Wiring |
|
12.225 |
- |
Depreciation provision –
Wire fencing |
|
12.300 |
- |
Depreciation
Provision - Hydraulic Works |
|
12.301 |
- |
Depreciation provision – Hydraulic
works forming part of Hydroelectric system - dams, spillways, |
|
12.302 |
- |
Depreciation provision –
Hydraulic works forming part of Hydroelectric system, reinforced |
|
12.303 |
- |
Depreciation provision –
Sweet water arrangement including reservoir etc., |
|
12.304 |
- |
Depreciation provision –
Sweet water arrangement(including water storage tank etc), Plant and
Pipelines for water supply in residential colony. |
|
12.305 |
- |
Depreciation provision –
Drainage and Sewerage System- Residential colony |
|
12.400 |
- |
Depreciation
Provision - Other Civil Works |
|
12.401 |
- |
Depreciation provision –
Pucca Roads |
|
12.402 |
- |
Depreciation provision –
Kutcha Roads |
|
12.403 |
- |
Depreciation provision –
Railway Sidings |
|
12.404 |
- |
Depreciation provision –
Other Civil Works - Plant foundation |
|
12.405 |
- |
Depreciation provision –
Other Civil Works - Cable trenches |
|
12.500 |
- |
Depreciation
Provision - Plant and Machinery |
|
12.508 |
- |
Depreciation provision – Auxiliaries
in Diesel Electric Generation Plant |
|
12.516 |
- |
Depreciation provision –
Oil srage tanks / oil handling plant and equipment. |
|
12.530 |
- |
Depreciation provision –
Diesel Electric Generating Power Plant |
|
12.531 |
- |
Depreciation provision –
Hydel Power Generating Plant |
|
12.532 |
- |
Depreciation provision –
Plant foundation for Hydel power generating plant |
|
12.533 |
- |
Depreciation provision –
Plant foundation for diesel electric generating plant. |
|
12.535 |
- |
Depreciation provision – Auxiliaries
in Hydel Power Plant. |
|
12.541 |
- |
Depreciation provision –
Transmission plant -Transformers having a rating of 100 KVA and above. |
|
12.542 |
- |
Depreciation provision –
Other Transformers -(Below 100 KVA) |
|
12.543 |
- |
Depreciation provision –
Other transmission plant - Transformer kiosks, Sub-station equipment and
other Fixed apparatus. |
|
12.551 |
- |
Depreciation provision –
Material handling equipment Earthmovers / Bulldozers. |
|
12.552 |
- |
Depreciation provision –
Material handling equipment - Cement Mixer |
|
12.553 |
- |
Depreciation provision –
Material handling equipment – Cranes |
|
12.555 |
- |
Depreciation provision –
Materials handling equipment – Others |
|
12.560 |
- |
Depreciation provision –
Low tension Alternating current(L.T.A.C.) Panel |
|
12.561 |
- |
Depreciation provision –
Switchgear including cable connections. |
|
12.563 |
- |
Depreciation provision –
Batteries including charging equipment. |
|
12.564 |
- |
Depreciation provision –
Battery set |
|
12.565 |
- |
Depreciation provision –
Fabrication shop / workshop plant and equipments. |
|
12.566 |
- |
Depreciation provision –
Direct current distribution box |
|
12.567 |
- |
Depreciation provision –
Lightning arrestors-Pole Type. |
|
12.568 |
- |
Depreciation provision –
Lightning Arrestor – Station Type |
|
12.569 |
- |
Depreciation provision –
Battery Charger |
|
12.571 |
- |
Depreciation provision –
Communication equipment - Radio and high frequency carrier system |
|
12.572 |
- |
Depreciation provision –
Communication equipment - telephone lines and telephones. |
|
12.573 |
- |
Depreciation provision –
Communication equipment – Mobile Phones |
|
12.574 |
- |
Depreciation provision –
Static machine tools and equipment |
|
12.575 |
- |
Depreciation provision –
Digital cameras |
|
12.576 |
- |
Depreciation provision –
Air conditioning plant – static |
|
12.577 |
- |
Depreciation provision –
Air conditioning plant – Portable |
|
12.578 |
- |
Depreciation provision –
Computers and its peripherals |
|
12.579 |
- |
Depreciation provision –
Remote Terminal Unit-R.T.U. |
|
12.580 |
- |
Depreciation provision –
Refrigerators and water coolers |
|
12.581 |
- |
Depreciation provision –
Meter testing laboratory tools and equipment |
|
12.582 |
- |
Depreciation provision –
Equipment in Hospitals / Clinics |
|
12.583 |
- |
Depreciation provision –
Tools and Tackles |
|
12.584 |
- |
Depreciation provision –
Weighing scales |
|
12.585 |
- |
Depreciation provision –
Drawing Board instruments |
|
12.586 |
- |
Depreciation provision –
Fire Extinguishers |
|
12.587 |
- |
Depreciation provision –
Solar Roof Top equipment installed on BESCOM buildings |
|
12.591 |
- |
Depreciation provision –
Roof top/Other solar plant Installations |
|
12.599 |
- |
Depreciation provision –
Other Miscellaneous Equipments. |
|
12.600 |
- |
Depreciation
Provision - Lines Cable Network etc, |
|
12.601 |
- |
Depreciation provision –
Overhead lines(Towers, Poles, Fixtures, Overhead Conductors and Devices)-
Lines on fabricated steel supports. |
|
12.602 |
- |
Depreciation provision –
Overhead lines(Towers, Poles, Fixtures, Overhead Conductors and Devices) -
Lines on Reinforced Concrete Supports. |
|
12.603 |
- |
Depreciation provision –
Overhead lines(Towers, Poles, Fixtures, Overhead Conductors and Devices) -
Lines on treated wood Supports. |
|
12.605 |
- |
Depreciation provision –
Transmission lines 66KV & above–Towers |
|
12.606 |
- |
Depreciation provision –
Transmission lines 66KV & above– Conductors |
|
12.611 |
- |
Depreciation provision –
Under ground cables including joint boxes and disconnecting boxes. |
|
12.612 |
- |
Depreciation provision –
Under ground Cables - Cable duct system |
|
12.613 |
- |
Depreciation provision –
Fiber optic |
|
12.614 |
- |
Depreciation provision –
Control cables |
|
12.621 |
- |
Depreciation provision –
Service connections |
|
12.631 |
- |
Depreciation provision –
Metering equipments. |
|
12.632 |
- |
Depreciation provision –
Metering equipment – Electronic / Electro mechanical meters |
|
12.633 |
- |
Depreciation provision –
Metering equipment- Prepaid |
|
12.641 |
- |
Depreciation provision –
Street lighting in Residential Colonies & Station premises. |
|
12.685 |
- |
Depreciation provision –
Miscellaneous Equipments |
|
12.700 |
- |
Depreciation
Provision - Vehicles |
|
12.710 |
- |
Depreciation provision –
Trucks, Tempos, Trekkers etc. |
|
12.720 |
- |
Depreciation provision –
Buses including mini buses. |
|
12.730 |
- |
Depreciation provision –
Jeeps, Vans, and Motor cars |
|
12.740 |
- |
Depreciation provision –
Other vehicles |
|
12.800 |
- |
Depreciation
Provision - Furniture, Fixtures and Intangible Assets |
|
12.801 |
- |
Depreciation Provision –
Intangible Assets – Software acquired / purchased for internal use |
|
12.888 |
- |
Depreciation provision –
Fixed Assets- Contra account |
|
12.899 |
- |
Depreciation provision –
Fixed Assets-Turnkey Works Bills not Received Intermediary Account. |
|
12.900 |
- |
Depreciation
Provision - Office Equipment |
|
12.901 |
- |
Depreciation provision –
Calculators |
|
12.902 |
- |
Depreciation provision –
Typewriters |
|
12.903 |
- |
Depreciation provision –
Cash Registers / Cash chest |
|
12.904 |
- |
Depreciation provision –
Duplicators / Xerox / Copiers. |
|
12.905 |
- |
Depreciation provision –
Franking Machines |
|
14.000 |
- |
Capital
Works in Progress |
|
14.110 |
- |
CWIP - Transmission lines
-(GP) |
|
14.113 |
- |
CWIP - Transmission Lines
– PFC |
|
14.114 |
- |
CWIP - Transmission Lines
– ADB |
|
14.115 |
- |
CWIP-Transmission Lines
–Others |
|
14.116 |
- |
CWIP- Transmission Lines
- Non Plan |
|
14.118 |
- |
CWIP-Capital Expenditure incurred
on reconstruction of Asset damaged on account of Floods-Lines |
|
14.119 |
- |
CWIP-Capital Expenditure
incurred on reconstruction of Asset damaged on account of Floods-Stations |
|
14.120 |
- |
CWIP - Step Down Stations
-(GP) |
|
14.123 |
- |
CWIP - Step-down Station
– PFC |
|
14.124 |
- |
CWIP - Step-down Station
– ADB |
|
14.125 |
- |
CWIP-Step Down
Stations-Others |
|
14.126 |
- |
CWIP - Step Down Stations
- Non plan |
|
14.127 |
- |
CWIP –Step-down Stations
& Transmission Lines –APRDP Works |
|
14.130 |
- |
CWIP - Load Despatch
& Communication |
|
14.140 |
- |
CWIP - Transmission
Lines, Transformers etc. - Extension (GP) |
|
14.141 |
- |
CWIP - Transmission
Lines, Transformers etc., - Extension - Non plan |
|
14.150 |
- |
CWIP - Transmission Lines
- Transformers etc. Improvements -(GP) |
|
14.151 |
- |
CWIP - Transmission
lines, Transformers etc., Improvements Non-Plan. |
|
14.152 |
- |
CWIP Transformers
-Improvements |
|
14.153 |
- |
CWIP-Stations-Improvements |
|
14.154 |
- |
CWIP - Urban Distribution
Improvement Scheme |
|
14.155 |
- |
CWIP - Additional Street
Lights / Street Lights in cities / towns / Villages |
|
14.156 |
- |
CWIP Transmission Lines-
improvements |
|
14.160 |
- |
CWIP – Reduction of
Losses in Lines |
|
14.163 |
- |
CWIP – Installation of
Capacitors – PFC |
|
14.164 |
- |
CWIP – Installation of
Capacitors – ADB |
|
14.165 |
- |
CWIP – Installation of
Capacitors(GP) |
|
14.166 |
- |
CWIP- Capital Expenditure
incurred on reconstruction of Assets damaged on account of Floods-Others |
|
14.170 |
- |
CWIP- Replacement of
Transformers by Similar Capacity |
|
14.200 |
- |
CWIP - REC Plan Schemes |
|
14.201 |
- |
CWIP-Transmission
Lines-REC |
|
14.202 |
- |
CWIP-Stations-REC |
|
14.220 |
- |
CWIP - SPA Schemes |
|
14.240 |
- |
CWIP – System Improvement
(REC) |
|
14.300 |
- |
CWIP - Village
Electrification (G.P) |
|
14.320 |
- |
CWIP - Power Supply
to IP sets (G.P.) |
|
14.340 |
- |
CWIP - Tribal Area
Electrification (G.P.) |
|
14.350 |
- |
CWIP - Bhagya jyothi
Schemes |
|
14.360 |
- |
CWIP - Kuteera jyothi
Schemes |
|
14.370 |
- |
CWIP - Border Area
Development Programme. |
|
14.380 |
- |
CWIP - HKDP Works. |
|
14.400 |
- |
CWIP - Service
Connections |
|
14.450 |
- |
CWIP - Generating
Stations - (G.P.) |
|
14.460 |
- |
CWIP - Diesel Generating
Station cell. |
|
14.461 |
- |
CWIP - Generating
Stations - Non Plan |
|
14.502 |
- |
CWIP – Buildings |
|
14.607 |
- |
CWIP - Vehicles |
|
14.708 |
- |
CWIP – Furniture and
Fixtures |
|
14.809 |
- |
CWIP – Office equipment |
|
14.810 |
- |
CWIP – Tools and Tackles |
|
14.811 |
- |
CWIP Mobile Phones |
|
14.888 |
- |
CWIP- Contra Account |
|
14.900 |
- |
CWIP - Acquisition of
licensees |
|
14.901 |
- |
Capital Expenditure
categorized APRDP Transmission lines & Step–down stations |
|
14.910 |
- |
CWIP - Survey and
Investigation expenses on projects. |
|
14.925 |
- |
CWIP - Schemes outside
the State sector. |
|
14.994 |
- |
Cost of Line works for
which Bills received but not passed. |
|
14.995 |
- |
Cost of Station works for
which Bills received but not passed. |
|
14.996 |
- |
Cost of Civil works for
which Bills received but not passed. |
|
14.997 |
- |
CWIP- Cost of lines works
completed in the field but Bills not received |
|
14.998 |
- |
CWIP- Cost of Station
works completed in the field but Bills not received |
|
14.999 |
- |
CWIP- Cost of Civil works
completed in the field. But Bills not received |
|
15.000 |
- |
Other
Accounts for Assets at Construction Stage |
|
15.100 |
- |
Contracts in
Progress |
|
15.120 |
- |
CIP - Transmission Lines |
|
15.122 |
- |
CIP - REC Plan Scheme |
|
15.124 |
- |
CIP - SPA Scheme |
|
15.126 |
- |
CIP - Village
Electrification (GP) |
|
15.128 |
- |
CIP – Buildings CIP -
Other Civil Works |
|
15.129 |
- |
CIP- Financed through
Suppliers Line of credit |
|
15.200 |
- |
Revenue Expenses
Pending Allocation Over Capital Works |
|
15.201 |
- |
Revenue expenses pending
allocation over capital works - Power charges. |
|
15.202 |
- |
Revenue expenses pending
allocation over capital works - Repairs & Maintenance. |
|
15.203 |
- |
Revenue expenses pending
allocation over capital works - employee cost. |
|
15.204 |
- |
Revenue expenses pending
allocation over capital works - Administration and general expenses. |
|
15.205 |
- |
Revenue expenses pending
allocation over capital works - Depreciation. |
|
15.206 |
- |
Revenue expenses pending
allocation over capital works - Interest. |
|
15.220 |
- |
Head Office Supervision
Charges |
|
15.500 |
- |
Provision for
Completed Works |
|
15.600 |
- |
Construction
Facilities |
|
15.601 |
- |
Construction equipment -
earth moving equipments and bulldozers. |
|
15.602 |
- |
Construction equipment –
Cranes |
|
15.603 |
- |
Construction equipment -
Cement mixers and other civil
construction machinery |
|
15.631 |
- |
Fabrication shop /
construction workshop equipment |
|
15.651 |
- |
Provision for depreciation
on construction facilities |
|
15.652 |
- |
Provision for
depreciation - Fabrication shop / workshop equipment (Major works) |
|
15.888 |
- |
CIP- Contra Account |
|
16.000 |
- |
Assets
Not in Use |
|
16.100 |
- |
Written Down Value
of Obsolete / Scrapped Assets |
|
16.102 |
- |
WDV – Obsolete / Scrapped
assets– Buildings |
|
16.103 |
- |
WDV – obsolete / scrapped
assets - Hydraulic Works |
|
16.104 |
- |
WDV – Obsolete / Scrapped
assets- other civil works |
|
16.105 |
- |
WDV – Obsolete / Scrapped
assets- Plant & Machinery |
|
16.106 |
- |
WDV – Obsolete / Scrapped
assets- Lines, cable network etc. |
|
16.107 |
- |
WDV – obsolete / scrapped
assets– Vehicles |
|
16.108 |
- |
WDV – obsolete / scrapped
assets- Furniture & Fixtures |
|
16.109 |
- |
WDV – obsolete / scrapped
assets- Office equipment |
|
16.200 |
- |
Written Down Value
of Faulty /Dismantled Assets |
|
16.202 |
- |
WDV – Faulty / dismantled
assets – Buildings |
|
16.203 |
- |
WDV – Faulty / dismantled
assets - Hydraulic works |
|
16.204 |
- |
WDV – Faulty / dismantled
assets - Other Civil works |
|
16.205 |
- |
WDV – Faulty / dismantled
assets- Plant & Machinery |
|
16.206 |
- |
WDV – Faulty / dismantled
assets- Lines, cable network etc. |
|
16.207 |
- |
WDV – Faulty / dismantled
assets– Vehicles |
|
16.208 |
- |
WDV – Faulty / dismantled
assets- Furniture & Fixtures |
|
16.209 |
- |
WDV – Faulty / dismantled
assets- Office equipments |
|
16.888 |
- |
Asset not in use- Contra
Account |
|
17.000 |
- |
Deferred
Costs |
|
17.200 |
- |
Deferred Revenue
Expenditure |
|
17.201 |
- |
Discount on issue of
Bonds / Debentures |
|
17.211 |
- |
Premium on Redemption of
Bonds/ Debentures |
|
17.221 |
- |
Compensation for
pre-mature take over of Licensees |
|
17.300 |
- |
Expenditure on
Survey/ Feasibility Studies of Projects not Yet Sanctioned |
|
17.301 |
- |
Preliminary expenditure
on survey/ Feasibility studies of projects not yet sanctioned |
|
17.888 |
- |
Deferred Costs – Contra
Account |
|
18.000 |
- |
Intangible
Assets |
|
18.100 |
- |
Intangible Assets –
Acquired / Purchased |
|
18.101 |
- |
Software acquired /
purchased for internal use |
|
18.200 |
- |
Internally
Generated Intangible Assets |
|
18.888 |
- |
Intangible Assets –
Contra Account |
|
20.000 |
- |
Investments |
|
20.100 |
- |
Investments Against
Funds |
|
20.110 |
- |
Staff Pension Fund
Investments |
|
20.120 |
- |
Gratuity Fund Investments |
|
20.200 |
- |
Investments Other
than Fund Investments |
|
20.210 |
- |
Investments in Government
Securities |
|
20.230 |
- |
Investments in Bonds /
Debentures of other Electricity Boards. |
|
20.250 |
- |
Investments in Bonds/Debentures
of other bodies engaged in generation, transmission or distribution of power |
|
20.270 |
- |
Investment in shares in
Corporation and Public Limited Companies. |
|
20.280 |
- |
Investment in the form of
fixed deposit with Banks, Companies etc. |
|
20.300 |
- |
Investments in
subsidiaries |
|
20.400 |
- |
Investments in
partnership-joint ventures |
|
20.888 |
- |
Investments – Contra
Account |
|
22.000 |
- |
Materials
Stock and Related Accounts |
|
22.200 |
- |
Materials Purchase
Accounts |
|
22.210 |
- |
Materials Purchase |
|
22.300 |
- |
Materials Issue
Accounts |
|
22.310 |
- |
Materials Issues(Capital) |
|
22.311 |
- |
Materials Issues (Imprest) |
|
22.320 |
- |
Materials Issues -others |
|
22.340 |
- |
Materials issued to
Contractors |
|
22.360 |
- |
Materials returned by
Contractors |
|
22.370 |
- |
Accessories (Other than
main asset) returned on dismantling of asset |
|
22.400 |
- |
Materials Transfer
Accounts |
|
22.410 |
- |
Materials Transfer Inward |
|
22.420 |
- |
Materials transfer
Outward |
|
22.450 |
- |
Materials transfer within
the Division |
|
22.460 |
- |
Materials transfer Inward
(Workshop / RCC centres) |
|
22.461 |
- |
Fabricated materials
returned |
|
22.500 |
- |
Materials Stock
Adjustment Accounts |
|
22.510 |
- |
Materials Stock
Adjustment Account (Capital) |
|
22.600 |
- |
Materials Stock
Account |
|
22.610 |
- |
Materials Stock Account |
|
22.640 |
- |
Materials at Site Account
(MASA) |
|
22.641 |
- |
Material imprest Account |
|
22.660 |
- |
Materials pending
Inspection |
|
22.680 |
- |
Materials in Transit
Account. |
|
22.700 |
- |
Other Materials
Account |
|
22.710 |
- |
Workshop Account |
|
22.720 |
- |
Materials issued to
fabricators. |
|
22.730 |
- |
Materials issued on
loan parties other than contracrs |
|
22.731 |
- |
Cost of materials and
labour in respect of Temporary Power Supply works. |
|
22.740 |
- |
Capital Equipments and
Capital spares in bonded warehouse. |
|
22.750 |
- |
Materials in Bonded
warehouse. |
|
22.760 |
- |
Obsolete Materials Stock |
|
22.800 |
- |
Materials Stock
Excess/Shortage Pending investigation |
|
22.810 |
- |
Stock Excess pending
Investigation. |
|
22.820 |
- |
Stock Shortage pending
investigation. |
|
22.888 |
- |
Material Stock and
related accounts – Contra Account |
|
|
|
|
|
23.000 |
- |
Receivables
Against Supply of Power(KPTCL) |
|
23.100 |
- |
Sundry Debtors for
Transmission Charges |
|
23.101 |
- |
Sundry Debtors for
Transmission Charges – BESCOM |
|
23.102 |
- |
Sundry Debtors for
Transmission Charges – MESCOM |
|
23.103 |
- |
Sundry Debtors for
Transmission Charges – HESCOM |
|
23.104 |
- |
Sundry Debtors for
Transmission Charges – GESCOM |
|
23.107 |
- |
Sundry Debtors for
Transmission Charges – CESCO |
|
23.109 |
- |
Sundry Debtors for
Transmission Service Charges – Hukkeri Electric Co-operative Society. |
|
23.146 |
- |
Sundry Debtors for
Transmission Charges and System Operating Charges in respect of Medium Term
Open Access(MTOA) Customers. |
|
23.147 |
- |
Sundry Debtors for
Transmission Charges and System Operating Charges in respect of Short Term
Open Access(STOA) Customers. |
|
23.200 |
- |
Sundry Debtors for
Sale of Power |
|
23.201 |
- |
Sundry Debtors for sale
of Power – BESCOM |
|
23.202 |
- |
Sundry Debtors for sale
of Power – MESCOM |
|
23.203 |
- |
Sundry Debtors for sale
of Power – HESCOM |
|
23.204 |
- |
Sundry Debtors for sale
of Power – GESCOM |
|
23.205 |
- |
Sundry Debtors for sale
of Power – Hukkeri Electricity Co-Operative Society |
|
23.207 |
- |
Sundry Debtors for sale
of Power – CESCO |
|
23.400 |
- |
Provision for
Unbilled Revenue |
|
23.491 |
- |
Provision for Unbilled
Revenue – BESCOM |
|
23.492 |
- |
Provision for Unbilled
Revenue – MESCOM |
|
23.493 |
- |
Provision for Unbilled
Revenue – HESCOM |
|
23.494 |
- |
Provision for Unbilled
Revenue – GESCOM |
|
23.495 |
- |
Provision for Unbilled
Revenue – Hukkeri Electricity Co-Op Society |
|
23.497 |
- |
Provision for Unbilled
Revenue – CESCO |
|
23.600 |
- |
Sundry Debtors for
Inter - State Sale of Power |
|
23.601 |
- |
Sundry Debtors for Inter
- State sale of power - Tamilnadu Electricity Board |
|
23.602 |
- |
Sundry Debtors for Inter
- State sale of power - Kerala State Electricity Board |
|
23.603 |
- |
Sundry Debtors for Inter
- State sale of power -Maharashtra State Electricity Board |
|
23.604 |
- |
Sundry Debtors for Inter
- State sale of power –APTRANSCO |
|
23.605 |
- |
Sundry Debtors for Inter
- State sale of power – Goa |
|
23.606 |
- |
Sundry Debtors for Inter
- State sale of power – WREB |
|
23.607 |
- |
Sundry Debtors for inter
State Sale of Power-Gujarath Electricity Board |
|
23.608 |
- |
Sundry Debtors for inter
State Sale of Power-Chatisgarh State Electricity Board |
|
23.609 |
- |
Sundry Debtors for inter
State Sale of Power – Madhya Pradesh Electricity Board |
|
23.700 |
- |
Sundry Debtors -
Delayed Payment Charges |
|
23.711 |
- |
Sundry Debtors for
delayed payment charges –BESCOM |
|
23.712 |
- |
Sundry Debtors for
delayed payment charges –MESCOM |
|
23.713 |
- |
Sundry Debtors for
delayed payment charges –HESCOM |
|
23.714 |
- |
Sundry Debtors for
delayed payment charges –GESCOM |
|
23.715 |
- |
Sundry Debtors fro
delayed payment charges - Hukkeri Electricity Co-Operative Society |
|
23.716 |
- |
Sundry Debtors for
delayed payment charges –CESCO |
|
23.717 |
- |
Sundry Debtors for
delayed payment charges – Others. |
|
23.800 |
- |
Provision for
withdrawal of Revenue Demand |
|
23.801 |
- |
Provision for withdrawal
of Revenue Demand – BESCOM |
|
23.802 |
- |
Provision for withdrawal
of Revenue Demand – MESCOM |
|
23.803 |
- |
Provision for withdrawal
of Revenue Demand – HESCOM |
|
23.804 |
- |
Provision for withdrawal
of Revenue Demand – GESCOM |
|
23.805 |
- |
Provision for withdrawal
of Revenue Demand - CESCO |
|
23.806 |
- |
Provision for withdrawal
of Revenue Demand – Hukkeri Electric Co-op Society |
|
23.807 |
- |
Pooled Account of
Receivables from BESCOM |
|
23.808 |
- |
Pooled Account of
Receivables from MESCOM |
|
23.809 |
- |
Pooled Account of
Receivables from HESCOM |
|
23.810 |
- |
Pooled Account of
Receivables from GESCOM |
|
23.811 |
- |
Pooled Account of
Receivables from CESC |
|
23.888 |
- |
Receivable against supply
of Power– Contra Account |
|
23.000 |
- |
Sundry
debtors for Sale Of Power(ESCOMS) |
|
23.100 |
- |
Sundry debtors for
sale of power (ESCOMS) - LT |
|
23.101 |
- |
Sundry debtors for sale
of power - LT1M |
|
23.102 |
- |
Sundry debtors for sale
of power - LT1UM |
|
23.103 |
- |
Sundry debtors for sale
of power - LT1>40 |
|
23.111 |
- |
Sundry debtors for sale
of power - LT2A1 |
|
23.112 |
- |
Sundry debtors for sale
of power - LT2A2 |
|
23.114 |
- |
Sundry debtors for sale
of power - LT2A FL |
|
23.115 |
- |
Sundry debtors for sale
of power - LT2B1 |
|
23.116 |
- |
Sundry debtors for sale
of power - LT2B2 |
|
23.131 |
- |
Sundry debtors for sale
of power - LT3A1 |
|
23.132 |
- |
Sundry debtors for sale
of power - LT3A2 |
|
23.133 |
- |
Sundry debtors for sale
of power - LT3A OL |
|
23.141 |
- |
Sundry debtors for sale
of power - LT4A |
|
23.144 |
- |
Sundry debtors for sale
of power - LT4B |
|
23.145 |
- |
Sundry debtors for sale
of power - LT4C1 |
|
23.147 |
- |
Sundry debtors for sale
of power - LT4C2 |
|
23.151 |
- |
Sundry debtors for sale
of power - LT5A0-5 |
|
23.152 |
- |
Sundry debtors for sale
of power - LT5A6-40 |
|
23.153 |
- |
Sundry debtors for sale
of power - LT5A41-67 |
|
23.154 |
- |
Sundry debtors for sale
of power - LT5A>67 |
|
23.159 |
- |
Sundry debtors for sale
of power - LT5A>100 |
|
23.155 |
- |
Sundry debtors for sale
of power - LT5B0-5 |
|
23.156 |
- |
Sundry debtors for sale
of power - LT5B6-40 |
|
23.157 |
- |
Sundry debtors for sale
of power - LT5B41-67 |
|
23.158 |
- |
Sundry debtors for sale
of power - LT5B>67 |
|
23.160 |
- |
Sundry debtors for sale
of power - LT5B>100 |
|
23.171 |
- |
Sundry debtors for sale
of power - LT6A |
|
23.172 |
- |
Sundry debtors for sale
of power - LT6B |
|
23.184 |
- |
Sundry debtors for sale
of power - LT6C |
|
23.181 |
- |
Sundry debtors for sale
of power - LT7A |
|
23.182 |
- |
Sundry debtors for sale
of power - LT7B |
|
23.183 |
- |
Sundry debtors for sale
of power - LT7A Prepaid |
|
23.200 |
- |
Sundry debtors for
sale of power (ESCOMS) - HT |
|
23.250 |
- |
Sundry debtors for sale
of power - HT1 |
|
23.260 |
- |
Sundry debtors for sale
of power - HT2A1 |
|
23.261 |
- |
Sundry debtors for sale
of power - HT2A2 |
|
23.263 |
- |
Sundry debtors for sale
of power - HT2C1 |
|
23.264 |
- |
Sundry debtors for sale
of power - HT2C2 |
|
23.270 |
- |
Sundry debtors for sale
of power - HT2B1 |
|
23.273 |
- |
Sundry debtors for sale
of power - HT2B2 |
|
23.280 |
- |
Sundry debtors for sale
of power - HT3A1 |
|
23.281 |
- |
Sundry debtors for sale
of power - HT3A2 |
|
23.289 |
- |
Sundry debtors for sale
of power - HT3A3 |
|
23.282 |
- |
Sundry debtors for sale
of power - HT3B |
|
23.290 |
- |
Sundry debtors for sale
of power - HT4 |
|
23.293 |
- |
Sundry debtors for sale
of power - HT5A |
|
23.300 |
- |
Sundry Debtors for
Electricity Tax |
|
23.301 |
- |
Sundry Debtors for
Electricity Tax - HT Consumers |
|
23.302 |
- |
Sundry Debtors for
Electricity Tax - LT consumers |
|
24.000 |
- |
Cash and
Bank |
|
24.100 |
- |
Cash Accounts |
|
24.109 |
- |
Revenue Cash on Hand |
|
24.110 |
- |
Cash on Hand |
|
24.111 |
- |
Other Amount Contra
Account |
|
24.120 |
- |
Postage stamps on hand |
|
24.130 |
- |
Revenue Receipt Stamps on
hand |
|
24.140 |
- |
Embossed agreement forms
on hand |
|
24.200 |
- |
Cash Imprest with
Staff – Accounts |
|
24.200 |
- |
Imprest Contra
Account |
|
24.209 |
- |
Imprest of other officers
/ Sub- office / Sub-Division |
|
24.210 |
- |
Imprest Cash on Hand |
|
24.211 |
- |
Imprest Vouchers on Hand |
|
24.300 |
- |
Collecting Bank
Accounts (Non-Operative) |
|
24.301 |
- |
Collecting Bank Account
(Non- Operative) – State Bank of Mysore |
|
24.302 |
- |
Collecting Bank Account
(Non- Operative) – State Bank of India |
|
24.303 |
- |
Collecting Bank Account
(Non- Operative) – State Bank of Hyderabad |
|
24.304 |
- |
Collecting Bank Account
(Non- Operative) – Canara Bank |
|
24.305 |
- |
Collecting Bank Account
(Non- Operative) – Syndicate Bank |
|
24.306 |
- |
Collecting Bank Account
(Non-Operative) - Government |
|
24.307 |
- |
Collecting Bank Account (Non-Operative)
- Public Deposit |
|
24.308 |
- |
Collecting Bank Account
(Non- Operative) – Punjab National Bank. |
|
24.310 |
- |
Collecting Bank Account
(Non- Operative) – Bank of Baroda |
|
24.400 |
- |
Disbursement Bank
Account (Operative) |
|
24.401 |
- |
Disbursement Bank Account
(Operative) - State Bank of Mysore |
|
24.402 |
- |
Disbursement Bank Account
(Operative) - State Bank of India |
|
24.403 |
- |
Disbursement Bank Account
(Operative) - State Bank of Hyderabad |
|
24.404 |
- |
Disbursement Bank Account
(Operative) - Canara Bank |
|
24.405 |
- |
Disbursement Bank Account
(Operative) - Syndicate Bank |
|
28.410 |
- |
Interest recoverable on
loans and advances drawn by staff – Purchase of 4 wheelers |
|
28.411 |
- |
Amount Recoverable from
contractors |
|
24.500 |
- |
Remittance to Head
Office - Transit Account |
|
24.501 |
- |
Remittance to Head Office
In Transit Account - State Bank of Mysore |
|
24.502 |
- |
Remittance to Head Office
In Transit Account - State Bank of India |
|
24.503 |
- |
Remittance to Head Office
In Transit Account - State Bank of Hyderabad |
|
24.504 |
- |
Remittance to Head Office
In Transit Account - Canara Bank |
|
24.505 |
- |
Remittance to Head Office
In Transit Account - Syndicate Bank |
|
24.510 |
- |
Remittance to Head Office
In Transit Account - Bank of Baroda |
|
24.600 |
- |
Transfers from Head
Office in Transit Account |
|
24.601 |
- |
Transfers from Head
Office In Transit Account - State Bank of Mysore |
|
24.602 |
- |
Transfers from Head
Office In Transit Account - State Bank of India |
|
24.603 |
- |
Transfers from Head
Office In Transit Account - State Bank of Hyderabad |
|
24.604 |
- |
Transfers from Head
Office In Transit Account - Canara Bank |
|
24.605 |
- |
Transfers from Head
Office In Transit Account - Syndicate Bank |
|
24.610 |
- |
Transfers from Head
Office In- Transit Account - Bank of Baroda |
|
24.700 |
- |
Disbursement Bank
Account(Operative) – Punjab National Bank – I Account –Bank Account
No..................... |
|
24.705 |
- |
Disbursement Bank Account(Operative)
-Bank of Maharashtra |
|
24.710 |
- |
Disbursement Bank
Account(Operative) - Vijaya Bank – I Account– Bank Account No............ |
|
24.711 |
- |
Disbursement Bank
Account(Operative) - Vijaya Bank – II Account– Bank Account No............ |
|
24.712 |
- |
Disbursement Bank
Account(Operative) - Vijaya Bank–III Account– Bank Account No............ |
|
24.720 |
- |
Disbursement Bank
Account(Operative)- State Bank of Mysore – I Account – Bank Account
No............ |
|
24.721 |
- |
Disbursement Bank Account(Operative)-
State Bank of Mysore – II Account – Bank Account No............ |
|
24.730 |
- |
Disbursement Bank
Account(Operative)- State Bank of India – I Account – Bank Account
No............ |
|
24.740 |
- |
Disbursement Bank
Account(Operative)- State Bank of Hyderabad– I Account – Bank Account
No............ |
|
24.750 |
- |
Disbursement Bank
Account(Operative)- Canara Bank–I Account – Bank Account No............ |
|
24.760 |
- |
Disbursement Bank
Account(Operative)- Syndicate Bank –I Account – Bank Account No............ |
|
24.770 |
- |
Disbursement Bank
Account(Operative)- Apex Bank –I Account – Bank Account No............ |
|
24.780 |
- |
Disbursement Bank Account(Operative)-
Bank of Baroda – I Account – Bank Account No............ |
|
24.790 |
- |
Disbursement Bank
Account(Operative)- Central Bank of India – I Account – Bank Account
No............ |
|
24.800 |
- |
Disbursement Bank
Account(Operative)- ICICI Bank – I Account– Bank Account No............ |
|
24.810 |
- |
Disbursement Bank
Account(Operative)- Bank of India – I Account – Bank Account No............ |
|
24.820 |
- |
Disbursement Bank
Account(Operative)- Corporation Bank – I Account – Bank Account
No............ |
|
24.830 |
- |
Disbursement Bank
Account(Operative)- HDFC Bank – I Account – Bank Account No............ |
|
24.840 |
- |
Disbursement Bank
Account(Operative)- UTI Bank Ltd – I Account – Bank Account No............ |
|
24.850 |
- |
Disbursement Bank Account(Operative)-
I Account Government Treasury Account No............ |
|
24.860 |
- |
to 24.869 Disbursement
Bank Account (Operative)– Indian Bank – I Account – Bank Account No…….. |
|
24.870 |
- |
to 24.879 Disbursement
Bank Account(Operative) – Bank of Rajasthan – I Account – Bank Account No…….. |
|
24.880 |
- |
Disbursement Bank
Account(Operative) -UCO Bank |
|
24.888 |
- |
Cash and Bank– Contra
Account |
|
24.890 |
- |
Disbursement Bank
Account(Operative) - Punjab & Sind Bank |
|
25.000 |
- |
Advance
to Suppliers |
|
25.101 |
- |
Advance to Suppliers –
Interest be,aring |
|
25.501 |
- |
Advance to Suppliers –
Interest Free |
|
25.502 |
- |
Amount Recoverable from Contractors/
Suppliers towards TDS Remitted By KPTCL on Their be,half. |
|
25.888 |
- |
Advance to suppliers –
Contra Account |
|
26.000 |
- |
Advance
to Contractors |
|
26.601 |
- |
Advance to Contractors –
Interest bearing |
|
26.602 |
- |
Advance to Contractors –
Interest Free |
|
26.603 |
- |
Contractors Material
Control Account |
|
26.604 |
- |
Transformers / Meters
etc., Issued to Contractors / Suppliers for Repairs / Replacement. |
|
26.605 |
- |
Turnkey Contractors
Control Account. |
|
26.888 |
- |
Advance Account to
Contractors– Contra Account. |
|
26.899 |
- |
Advance Works Relating to
Turnkey Bills not Received Intermediary Account |
|
27.000 |
- |
Other
Loans and Advances |
|
27.100 |
- |
Loans and Advances
to Staff – Interest be,aring |
|
27.101 |
- |
Loans and advances to
staff – Interest bearing – House building/ Purchase / Repairs. |
|
27.102 |
- |
Loans and advances to
staff –Interest bearing – Vehicles(2 wheelers) |
|
27.103 |
- |
Loans and advances to
staff – Interest bearing – Marriage |
|
27.104 |
- |
Loans & Advances to
staff – Interest bearing – Vehicles(4 wheelers) |
|
27.105 |
- |
Loans and advances to
staff – Interest bearing - Solar Water heating system purchase advance. |
|
27.106 |
- |
Loans & Advances to
Staff – Interest bearing- Computer Purchase |
|
27.200 |
- |
Loans and Advances
to Staff – Interest Free |
|
27.201 |
- |
Loans and advances to
staff – Advance of pay |
|
27.202 |
- |
Loans and advances to
staff – Travel advance |
|
27.203 |
- |
Loans and advances to
staff – Festival advance |
|
27.204 |
- |
Loans and advances to
staff – Medical advance |
|
27.205 |
- |
Advances to staff against
expenses |
|
27.206 |
- |
Other loans and advances
to staff |
|
27.207 |
- |
Education advance to
staff |
|
27.208 |
- |
Loans and advances to
staff – Education loan to staff |
|
27.209 |
- |
Loans and advances to
staff – Bicycle advance. |
|
27.210 |
- |
Transformers / Meters
etc. issued for repairs to the Corporation personnel |
|
27.211 |
- |
Advance towards Revolving
Fund |
|
27.400 |
- |
Advance Income Tax
Deductions at Source |
|
27.410 |
- |
Advance Income Tax |
|
27.421 |
- |
Income Tax deducted at
source – Income from investments |
|
27.425 |
- |
Income tax deduction at
source – Other receipts. |
|
27.800 |
- |
Loans and Advances
– Others |
|
27.810 |
- |
Seed Capital to KPTCL
Kaveri Bhavan, Bangalore |
|
27.811 |
- |
Amount incurred towards
cost of Software development |
|
27.888 |
- |
Other loans and advances–
Contra Account |
|
27.900 |
- |
Provision for
Doubtful Loans and Advances(Credit Account) |
|
28.000 |
- |
Sundry
Debtors |
|
28.100 |
- |
Sundry Debtors –
Trading Account |
|
28.103 |
- |
Sundry Debtors for Sale
of Stores |
|
28.104 |
- |
Sundry Debtors for rental
from property |
|
28.105 |
- |
Sundry Debtors for other
Miscellaneous income |
|
28.106 |
- |
Sundry Debtors – for
Consultancy charges |
|
28.107 |
- |
Sundry Debtors for O
& M charges – PGCIL |
|
28.110 |
- |
Sundry Debtors –
Government Department |
|
28.120 |
- |
Sundry Debtors Wheeling
charges-Other States. |
|
28.122 |
- |
Wheeling charges
recoverable from IPPs towards Transmission network |
|
28.123 |
- |
Sundry Debtors for
revenue towards Reactive Energy drawn |
|
28.124 |
- |
Sundry Debtors for
Revenue towards excess drawal of energy by Generating Companies. |
|
28.125 |
- |
Sundry Debtors for Rental
from property –BESCOM |
|
28.126 |
- |
Sundry Debtors for Rental
from property –MESCOM |
|
28.127 |
- |
Sundry Debtors for Rental
from property –HESCOM |
|
28.128 |
- |
Sundry Debtors for Rental
from property –GESCOM |
|
28.129 |
- |
Sundry Debtors for Rental
from property – CESCO |
|
28.200 |
- |
Income Accured and
Due |
|
28.210 |
- |
Income Accrued and due on
Fund Investment |
|
28.220 |
- |
Income Accrued and Due –
other than Fund Investments |
|
28.230 |
- |
Income Accrued and Due –
Loans & Advances to Staff |
|
28.290 |
- |
Income Accrued and Due –
Others |
|
28.292 |
- |
Sundry Debtors for rebate
on REC Loan |
|
28.300 |
- |
Income Accured but
not Due |
|
28.310 |
- |
Income accrued but not
due on Fund Investments |
|
28.320 |
- |
Income accrued but not
due – other than Fund Investments |
|
28.330 |
- |
Income accrued but not
due – Loans & Advances to Staff |
|
28.390 |
- |
Income accrued but not
due – others |
|
28.400 |
- |
Amount Recoverable
from Employees / Ex-Employees |
|
28.401 |
- |
Amount Recoverable from
Employees |
|
28.402 |
- |
Amount Recoverable from
Ex- employees |
|
28.403 |
- |
Cash found short due to
theft etc., Pending Investigation |
|
28.404 |
- |
Materials drawn by
Executive Subordinates without precheck of Indents |
|
28.405 |
- |
Interest recoverable on
loans and Advance drawn by staff – House building / Purchase / Enlargement. |
|
28.406 |
- |
Interest recoverable on
loans and advances drawn by staff – Purchase of 2 wheelers |
|
28.407 |
- |
Interest recoverable on
loans and Advance drawn by staff for performance of Marriage. |
|
28.408 |
- |
Interest recoverable on
loans and advance drawn by staff – purchase of computer. |
|
28.409 |
- |
Amount recoverable from
employee – unused materials not returned / excess materials drawn |
|
28.600 |
- |
Subsidy / Grants
Receivable |
|
28.610 |
- |
Capital Subsidy / Grants
Receivable |
|
28.611 |
- |
Revenue Subsidy / Grant
Receivable |
|
28.620 |
- |
Rural Electrification
Subsidy / Grant receivable |
|
28.621 |
- |
Subsidy receivable from
GOK towards Bulk power supply to Hukkeri Electricity Co-Operative Society |
|
28.700 |
- |
Other Claims |
|
28.720 |
- |
CLAIMS FOR LOSS / DAMAGE
TO MATERIALS |
|
28.721 |
- |
Claims for Loss / Damage
to Materials – Railways |
|
28.722 |
- |
Claims for Loss / Damage
to materials – Custom Authorities |
|
28.724 |
- |
Claims for Loss / Damage
to materials – Insurance Companies |
|
28.725 |
- |
Claims for Loss / Damage
to materials – Suppliers |
|
28.729 |
- |
Claims for Loss / Damage
to materials –Others |
|
28.740 |
- |
CLAIM FOR LOSS / DAMAGE
TO CAPITAL ASSETS |
|
28.741 |
- |
Claims for Loss /
Damage capital assets – Railways |
|
28.744 |
- |
Claims for Loss / Damage
to capital assets – Insurance Companies |
|
28.745 |
- |
Claims for Loss / Damage
to capital assets – Suppliers |
|
28.749 |
- |
Claims for Loss / Damage
to capital assets – Others |
|
28.800 |
- |
Other Receivables |
|
28.801 |
- |
Pooled account of
Receivables from BESCOM(Control Account) |
|
28.802 |
- |
Pooled account of
Receivables from MESCOM(Control Account) |
|
28.803 |
- |
Pooled account of
Receivables from HESCOM(Control Account) |
|
28.804 |
- |
Pooled account of
Receivables from GESCOM(Control Account) |
|
28.810 |
- |
Expenses recoverable from
Suppliers / Contractors |
|
28.811 |
- |
Receivable – Research
unit |
|
28.812 |
- |
Receivable – Relay
testing |
|
28.813 |
- |
Receivable – Stipendiary
Scheme |
|
28.814 |
- |
Receivables from BESCOM
towards advances paid to suppliers prior to 1.6.2002 in respect of Purchase
Orders placed by the then Office of CEE, MW(South) |
|
28.815 |
- |
Receivables from MESCOM
towards advances paid to suppliers prior to 1.6.2002 in respect of Purchase
Orders placed by the then Office of CEE, MW(South) |
|
28.816 |
- |
Receivables from HESCOM
towards advances paid to suppliers prior to 1.6.2002 in respect of Purchase
Orders placed by the then Office of CEE, MW(South) |
|
28.817 |
- |
Receivables from GESCOM
towards advances paid to suppliers prior to 1.6.2002 in respect of Purchase
Orders placed by the then Office of CEE, MW(South) |
|
28.818 |
- |
Receivables from CESCO
towards advances paid to suppliers prior to 1.6.2002 in respect of Purchase
Orders placed by the then Office of CEE, MW(South) |
|
28.819 |
- |
Corporate Tax receivable
from income Tax department towards refund |
|
28.820 |
- |
Prepaid Expenses |
|
28.821 |
- |
Income Tax paid in
Advance |
|
28.822 |
- |
REC Loan paid in Advance |
|
28.823 |
- |
Inventory Loan paid in
Advance |
|
28.824 |
- |
Differential rate of
interest payable by Govt. as interest subsidy |
|
28.840 |
- |
Receivable from BESCOM
towards maintenance charges of P&G Trust. |
|
28.841 |
- |
Receivable from MESCOM
towards maintenance charges of P&G Trust. |
|
28.842 |
- |
Receivable from HESCOM
towards maintenance charges of P&G Trust. |
|
28.843 |
- |
Receivable from GESCOM
towards maintenance charges of P&G Trust. |
|
28.844 |
- |
Receivable from CESCO
towards maintenance charges of P&G Trust. |
|
28.845 |
- |
Fringe Benefit Tax paid
in advance. |
|
28.853 |
- |
Receivable from BESCOM
towards payment of principal Interest and Guarantee commission on borrowings
on behalf BESCOM |
|
28.854 |
- |
Receivable from MESCOM
towards payment of principal Interest and Guarantee commission on borrowings
on behalf MESCOM |
|
28.855 |
- |
Receivable from HESCOM
towards payment of principal Interest and Guarantee commission on borrowings
on behalf HESCOM |
|
28.856 |
- |
Receivable from GESCOM
towards payment of principal Interest and Guarantee commission on borrowings
on behalf GESCOM |
|
28.859 |
- |
Receivable from GOK
towards payment of Principal, Interest and Guarantee Commission on Loans
parked with GOK |
|
28.860 |
- |
Receivable from CESCO
towards payment of principal Interest and Guarantee commission on borrowings
on behalf CESCO. |
|
28.865 |
- |
Receivables – towards
materials transferred to VVNL |
|
28.866 |
- |
Receivables – Other
transaction |
|
28.876 |
- |
Receivable from GOK
towards actual payment of Pension and Gratuity |
|
28.882 |
- |
Materials sent to BESCOM
units by KPTCL – Receivable/Adjustable |
|
28.883 |
- |
Materials sent to MESCOM
units by KPTCL – Receivable/Adjustable |
|
28.884 |
- |
Materials sent to HESCOM
units by KPTCL – Receivable/Adjustable |
|
28.885 |
- |
Materials sent to GESCOM
units by KPTCL – Receivable/Adjustable |
|
28.888 |
- |
Sundry Debtors– Contra
Account |
|
28.890 |
- |
Personnel related amounts
receivable from BESCOM units |
|
28.891 |
- |
Personnel related amounts
receivable from MESCOM units |
|
28.894 |
- |
Other receivable from
BESCOM – Other Transactions |
|
28.895 |
- |
Other receivable from
MESCOM – Other Transactions |
|
28.896 |
- |
Other receivable from
HESCOM – Other Transactions |
|
28.897 |
- |
Other receivable from
GESCOM – Other Transactions |
|
28.898 |
- |
Receivables – Others |
|
28.899 |
- |
Provision for Doubtful
receivable (Credit Account) |
|
28.900 |
- |
Funds Transferred
to Escoms Receivable / Adjustable |
|
28.901 |
- |
Funds transferred to
BESCOM Receivable / Adjustable |
|
28.902 |
- |
Funds transferred to
MESCOM Receivable /Adjustable |
|
28.903 |
- |
Funds transferred to
HESCOM Receivable / Adjustable |
|
28.904 |
- |
Funds transferred to
GESCOM Receivable / Adjustable |
|
28.905 |
- |
Unscheduled interchange
charges receivable from PGCIL-SREB |
|
28.906 |
- |
Funds transferred to
SPPCC – Receivable /Adjustable |
|
28.907 |
- |
Receivable from Pension
& Gratuity trust |
|
28.912 |
- |
Water Charges Recoverable
from – BESCOM |
|
28.913 |
- |
Water Charges Recoverable
from – MESCOM |
|
28.914 |
- |
Water Charges Recoverable
from – HESCOM |
|
28.915 |
- |
Water Charges Recoverable
from – GESCOM |
|
28.916 |
- |
Water Charges Recoverable
from – CESCO |
|
28.917 |
- |
Funds transferred to SLDC
– Receivable /Adjustable |
|
28.918 |
- |
Cash Recoverable from
BESCOM for Materials sent to BESCOM Units by KPTCL Units. |
|
28.919 |
- |
Cash Recoverable from
MESCOM for Materials sent to MESCOM Units by KPTCL Units. |
|
28.920 |
- |
Cash Recoverable from
HESCOM for Materials sent to HESCOM Units by KPTCL Units. |
|
28.921 |
- |
Cash Recoverable from
GESCOM for Materials sent to GESCOM Units by KPTCL Units. |
|
28.922 |
- |
Personnel related amount
recoverable in cash from BESCOM units. |
|
28.923 |
- |
Personnel related amount recoverable
in cash from MESCOM units. |
|
28.924 |
- |
Personnel related amount
recoverable in cash from HESCOM units. |
|
28.925 |
- |
Personnel related amount
recoverable in cash from GESCOM units. |
|
28.926 |
- |
Amount recoverable in
cash from BESCOM units in respect of other Transactions. |
|
28.927 |
- |
Amount recoverable in
cash from MESCOM units in respect of other Transactions. |
|
28.928 |
- |
Amount recoverable in
cash from HESCOM units in respect of other Transactions. |
|
28.929 |
- |
Amount recoverable in
cash from GESCOM units in respect of other Transactions |
|
28.930 |
- |
Securities from suppliers
/ contractors(Deposits in the form of fixed deposits etc.,) |
|
28.935 |
- |
Deposit with Others |
|
28.936 |
- |
Security deposit made
with ESCOMs for obtaining Power Supply to KPTCL Installations |
|
28.937 |
- |
Meter Security deposit
made with ESCOMs for obtaining Power Supply to KPTCL Installations |
|
28.938 |
- |
Pooled Interest on APDRP
Loan Receivable from ESCOMs |
|
28.939 |
- |
Interest on APDRP Loan
Receivable from BESCOM |
|
28.940 |
- |
Interest on APDRP Loan
Receivable from MESCOM |
|
28.941 |
- |
Interest on APDRP Loan
Receivable from HESCOM |
|
28.942 |
- |
Interest on APDRP Loan
Receivable from GESCOM |
|
28.943 |
- |
Income Tax paid in
advance through TDS at KPTCL Accounting Units. |
|
28.948 |
- |
Cash Receivable from
BESCOM towards all 33 KV assets handed over and towards replacement cost of
faulty CTs/ PTs/ and Metering Equipment(above 33 KV). |
|
28.949 |
- |
Cash Receivable from
MESCOM towards all 33 KV assets handed over and towards replacement cost of
faulty CTs/ PTs/ and Metering Equipment(above 33 KV). |
|
28.950 |
- |
Cash Receivable from
HESCOM towards all 33 KV assets handed over and towards replacement cost of
faulty CTs/ PTs/ and Metering Equipment(above 33 KV). |
|
28.951 |
- |
Cash Receivable from
GESCOM towards all 33 KV assets handed over and towards replacement cost of
faulty CTs/ PTs/ and Metering Equipment(above 33 KV). |
|
28.952 |
- |
Cash Receivable from
CESCO towards all 33 KV assets handed over and towards replacement cost of
faulty CTs/ PTs/ and Metering Equipment(above 33 KV). |
|
28.953 |
- |
Share of O&M expenses
of SLDC Receivable from Generating Companies through BESCOM |
|
28.954 |
- |
Share of O&M expenses
of SLDC Receivable from Generating Companies through MESCOM |
|
28.955 |
- |
Share of O&M expenses
of SLDC Receivable from Generating Companies through HESCOM |
|
28.956 |
- |
Share of O&M expenses
of SLDC Receivable from Generating Companies through GESCOM |
|
28.957 |
- |
Share of O&M expenses
of SLDC Receivable from Generating Companies through CESCO |
|
28.958 |
- |
Receivable from BESCOM
towards maintenance charges of SPPCC |
|
28.959 |
- |
Receivable from MESCOM
towards maintenance charges of SPPCC |
|
28.960 |
- |
Receivable from HESCOM
towards maintenance charges of SPPCC |
|
28.961 |
- |
Receivable from GESCOM
towards maintenance charges of SPPCC |
|
28.962 |
- |
Receivable from CESCO
towards maintenance charges of SPPCC |
|
28.963 |
- |
Receivable from other Departments
towards Pension and Leave Contribution |
|
28.964 |
- |
Funds transferred to
CESCORP – Receivable / Adjustable |
|
28.965 |
- |
Cash Recoverable from
CESCORP for Materials sent to CESCORP Units by KPTCL Units |
|
28.966 |
- |
Personnel related amount
recoverable in cash from CESCORP Units. |
|
28.967 |
- |
Amount recoverable in
cash from CESCORP Units in respect of other transactions |
|
28.968 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from BESCOM |
|
28.969 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from MESCOM |
|
28.970 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from HESCOM |
|
28.971 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from GESCOM |
|
28.972 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from CESC |
|
28.973 |
- |
Regulatory Asset –
Receivable towards additional fixed cost of TBPCL from Hukkeri Society |
|
28.974 |
- |
Running cost of VSAT – Receivable
from Non-KPTCL VSAT users. |
|
28.975 |
- |
Receivable from pension
& Gratuity Trust towards Advance paid to trust for disbursement of
Pension & Gratuity |
|
28.976 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT Receivable from BESCOM and payable to
other ESCOMS |
|
28.977 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT Receivable from MESCOM and payable to
other ESCOMS |
|
28.978 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT Receivable from HESCOM and payable to
other ESCOMS |
|
28.979 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT Receivable from GESCOM and payable to
other ESCOMS |
|
28.980 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT Receivable from CESC and payable to
other ESCOMS |
|
28.981 |
- |
Receivable from KPCL-
GSD, Munirabad towards payment of Commutation of pension to KPTCL employees
on deputation. |
|
28.982 |
- |
Receivable from KPCL-GSD,
Munirabad towards payment of DCRG to KPTCL employees on deputation |
|
28.983 |
- |
Receivable from KPCL –
GSD, Munirabad towards payment of Family Benefit Fund to KPTCL employees on
deputation |
|
28.984 |
- |
Receivable from KPCL
–GSD, Munirabad towards payment of Leave surrender on retirement to KPTCL
employees on deputation |
|
28.985 |
- |
Receivable from KPCL –
GSD, Munirabad towards Pension, Leave & Gratuity contribution in respect
of KPTCL employees on deputation |
|
28.986 |
- |
Receivable from KPCL
–MGHE, Jog towards payment of Commutation of pension to KPTCL employees on
deputation |
|
28.987 |
- |
Receivable from KPCL –
MGHE, Jog towards payment of DCRG to KPTCL employees on deputation |
|
28.988 |
- |
Receivable from KPCL –
MGHE, Jog towards payment of Family Benefit Fund to KPTCL employees on
deputation |
|
28.989 |
- |
Receivable from KPCL –
MGHE, Jog towards payment of Leave surrender on retirement to KPTCL employees
on deputation |
|
28.990 |
- |
Receivable from KPCL –
MGHE, Jog towards Pension, Leave & Gratuity contribution in respect of
KPTCL employees on deputation |
|
28.991 |
- |
Receivable from KPCL –
GSD, Shiva & Shimsha towards payment of Commutation of pension to KPTCL
employees on deputation |
|
28.992 |
- |
Receivable from KPCL –
GSD, Shiva & Shimsha towards payment of DCRG to KPTCL employees on
deputation |
|
28.993 |
- |
Receivable from KPCL –
GSD, Shiva & Shimsha towards payment of Family Benefit Fund to KPTCL
employees on deputation to GSD, Shiva & Shimsha, VVNL |
|
28.994 |
- |
Receivable from KPCL – GSD,
Shiva & Shimsha towards payment of Leave surrender on retirement to KPTCL
employees on deputation |
|
28.995 |
- |
Receivable from KPCL –
GSD, Shiva & Shimsha towards Pension, Leave & Gratuity contribution
in respect of KPTCL employees on deputation . |
|
28.996 |
- |
Receivable from KPCL –
D.G. Plant, VVNL towards payment of Commutation of pension to KPTCL employees |
|
28.997 |
- |
Receivable from KPCL –
D.G. Plant, VVNL towards payment of DCRG to KPTCL employees on deputation |
|
28.998 |
- |
Receivable from KPCL –
D.G. Plant, VVNL towards payment of Family Benefit Fund to KPTCL employees on
deputation |
|
28.999 |
- |
Receivable from KPCL –
D.G. Plant, VVNL towards payment of Leave surrender on retirement to KPTCL
employees on deputation |
|
29.201 |
- |
Receivable from KPCL –
D.G. Plant, VVNL towards Pension, Leave & Gratuity contribution in
respect of KPTCL employees on deputation |
|
29.202 |
- |
IGP(Vigilance &
Enforcement) office Expenditure receivable from BESCOM |
|
29.203 |
- |
IGP(Vigilance &
Enforcement) office Expenditure receivable from MESCOM |
|
29.204 |
- |
IGP(Vigilance &
Enforcement) office Expenditure receivable from HESCOM |
|
29.205 |
- |
IGP(Vigilance &
Enforcement) office Expenditure receivable from GESCOM |
|
29.206 |
- |
IGP(Vigilance &
Enforcement) office Expenditure receivable from CESCO |
|
29.101 |
- |
Balance of Banked Energy
as at the year-end. |
|
31.000 |
- |
Inter
Unit Accounts – Materials |
|
31.100 |
- |
IUA – Materials –
Acceptance not Received |
|
31.200 |
- |
IUA – Materials –
AT not Received |
|
31.300 |
- |
IUA – Materials –
Clearance |
|
31.600 |
- |
IUA – Materials –
Permanently Cleared Debit Items |
|
31.700 |
- |
IUA – Materials –
Permanently Cleared Credit Items |
|
31.888 |
- |
IUA - Materials – Contra
Account |
|
32.000 |
- |
Inter
Unit Accounts – Capital Expenditure & Fixed Assets |
|
32.100 |
- |
IUA – Released
Assets / Moveable Assets and Other Equipments – Acceptance not Received |
|
32.200 |
- |
IUA – Released Assets
/ Moveable Assets and Other Equipments – AT not Received |
|
32.300 |
- |
IUA – Released
Assets / Capital Expenditure / Fixed Assets / Depreciation – Clearance |
|
32.400 |
- |
IUA – Capital
Expenditure / Fixed Assets / Depreciation – Debit AT Sent |
|
32.500 |
- |
IUA – Capital
Expenditure / Fixed Assets / Depreciation – Credit AT Sent |
|
32.600 |
- |
IUA – Capital
Expenditure & FA - Permanently Cleared Debit Items |
|
32.700 |
- |
IUA – Capital
Expenditure & FA - Permanently Cleared Credit Items |
|
32.888 |
- |
IUA – Capital Expenditure
and Fixed Assets – Contra Account |
|
33.000 |
- |
Inter
Unit Accounts – Remittances to Head office |
|
33.888 |
- |
IUA – Remittance to Head
Office – Contra Account |
|
34.000 |
- |
Inter
Unit Accounts – Funds Transfer from Head office |
|
34.888 |
- |
IUA - Funds transferred
from Head Office – Contra Account |
|
36.000 |
- |
Inter
Unit Accounts – Personal |
|
36.100 |
- |
IUA – Personnel –
Debit AT Sent |
|
36.200 |
- |
IUA – Personnel –
Credit AT Sent |
|
36.300 |
- |
IUA – Personnel –
Clearance |
|
36.600 |
- |
IUA – Personnel –
Permanently Cleared Debit Items |
|
36.700 |
- |
IUA – Personnel –
Permanently Cleared Credit Items |
|
36.888 |
- |
IUA – Personnel – Contra
Account |
|
37.000 |
- |
Inter
Unit Accounts – Other Transactions / Adjustments |
|
37.100 |
- |
IUA – Other
Transactions / Adjustments – Debit AT Sent |
|
37.200 |
- |
IUA – Other
Transactions / Adjustments – Credit AT Sent |
|
37.300 |
- |
IUA – Other
Transactions / Adjustments – Clearance |
|
37.600 |
- |
IUA – Other
Transactions – Permanently Cleared Debit Items |
|
37.700 |
- |
IUA – Other
Transactions – Permanently Cleared Credit Items |
|
37.821 |
- |
IUA – Year End Transfer
to H.O. Net Difference of Account Codes of Part C i.e., Net of Funds
Received/ Remitted & Certain Liabilities Transferred to H.O |
|
37.825 |
- |
Liability Transferred to
H.O |
|
37.826 |
- |
Part C Difference for The
Year to be, Transferred to Account Code 37.821 |
|
37.888 |
- |
IUA – Other transactions/
Adjustments – Contra Account |
|
41.000 |
- |
Liability
for Purchase of Power: Sundry Creditors for Purchase of Power |
|
41.100 |
- |
Wheeling Charges
Payable to Other Electricity Boards and Other Bodies |
|
41.101 |
- |
Sundry Creditors for
purchase of power – Tamil Nadu Electricity Board |
|
41.102 |
- |
Sundry Creditors for
purchase of power – Kerala State Electricity Board |
|
41.103 |
- |
Sundry creditors for
purchase of power – Maharashtra State Electricity Board |
|
41.104 |
- |
Sundry creditors for
purchase of power – Andhra Pradesh Transmission Company |
|
41.105 |
- |
Sundry creditors for
purchase of power – Pondichery Electricity Board |
|
41.106 |
- |
Sundry creditors for
purchase of power – Goa Electricity Board |
|
41.107 |
- |
Sundry creditors for
purchase of power –GRIDCO |
|
41.108 |
- |
Sundry creditors for
purchase of power –KPCL |
|
41.109 |
- |
Sundry creditors for
purchase of power –VVNL |
|
41.110 |
- |
Sundry creditors for
purchase of power –NTPC-RSTP |
|
41.111 |
- |
Sundry creditors for
purchase of power –MAPS |
|
41.112 |
- |
Sundry creditors for
purchase of power –NLC |
|
41.113 |
- |
Sundry creditors for
purchase of power –PGCIL |
|
41.114 |
- |
Sundry creditors for
purchase of power –KAIGA |
|
41.115 |
- |
Sundry creditors for
purchase of power –WREB |
|
41.116 |
- |
Sundry creditors for
purchase of power –NTPC -ER |
|
41.117 |
- |
Sundry creditors for
purchase of power –PTCIL |
|
41.118 |
- |
Sundry creditors for
purchase of power –ITPL |
|
41.119 |
- |
Sundry Creditors for
purchase of power – Ugar Sugars Works Ltd Co generation Plant , Ugar |
|
41.120 |
- |
Sundry Creditors for
purchase of power -. SMIORE |
|
41.121 |
- |
Sundry Creditors for
purchase of power – Energy Development Co Ltd. |
|
41.122 |
- |
Sundry Creditors for
purchase of power – Bhoruka Power Corporation Ltd |
|
41.123 |
- |
Sundry Creditors for
purchase of power – Murdeshwara Power Corpn. Ltd. |
|
41.124 |
- |
Sundry Creditors for
purchase of power – Shamanur Sugar Ltd |
|
41.125 |
- |
Sundry Creditors for purchase
of power – JTPCL |
|
41.126 |
- |
Sundry Creditors for
purchase of power – Shree Renuka Sugars Ltd |
|
41.127 |
- |
Sundry Creditors for
purchase of power – Bannari Amman Sugars |
|
41.128 |
- |
Sundry Creditors for
purchase of power – ICL Sugars |
|
41.129 |
- |
Sundry Creditors for
purchase of power – Rayalseema Alkalies |
|
41.130 |
- |
Sundry Creditors for
purchase of power – Prabhulingeshwara |
|
41.131 |
- |
Sundry Creditors for
purchase of power – Tata Company Ltd |
|
41.132 |
- |
Sundry Creditors for
purchase of power – South India Paper Mills |
|
41.133 |
- |
Sundry Creditors for
purchase of power – Tannir Bhavi Company Ltd |
|
41.134 |
- |
Sundry Creditors for
purchase of power – Amoga Power Project Ltd |
|
41.135 |
- |
Sundry Creditors for
purchase of power – Dandeli Steel & Ferro Alloys Ltd |
|
41.136 |
- |
Sundry Creditors for
purchase of power – Malavalli Power Plant Pvt Ltd. |
|
41.137 |
- |
Sundry Creditors for
purchase of power – Nuziveedu Seeds Ltd. |
|
41.138 |
- |
Sundry Creditors for
purchase of power – Atria Power Corporation Ltd. |
|
41.139 |
- |
Sundry Creditors for
purchase of power – Raythara S.S.K.N. |
|
41.140 |
- |
Sundry Creditors for
purchase of power – Viswanath Sugars Ltd. |
|
41.141 |
- |
Sundry Creditors for
purchase of power – Shri Dodda Ganga Krishna Ltd. |
|
41.142 |
- |
Sundry Creditors for
purchase of power – Shri Dodda Moodalabagilu Power Ltd. |
|
41.143 |
- |
Sundry Creditors for
purchase of power – Arun Engineering |
|
41.144 |
- |
Sundry Creditors for
purchase of power – Globe Generating Power Ltd |
|
41.145 |
- |
Sundry Creditors for purchase
of power – Atria Brundavana Power Ltd |
|
41.146 |
- |
Sundry Creditors for
purchase of power – Chamundeshwari Sugars Ltd. |
|
41.147 |
- |
Sundry Creditors for
purchase of power – Subash Kabini Power Company Ltd |
|
41.148 |
- |
Sundry Creditors for
purchase of power – Thungabhadra Steel Products |
|
41.149 |
- |
Sundry Creditors for
purchase of power – Enercon Wind Farms India Ltd |
|
41.150 |
- |
Sundry Creditors for
purchase of power – Topaz Investment Pvt Ltd |
|
41.151 |
- |
Sundry Creditors for purchase
of power – Cepco Industries Pvt Ltd |
|
41.152 |
- |
Sundry Creditors for
purchase of power – BSES |
|
41.153 |
- |
Sundry Creditors for
purchase of power – Jhamakhandi Sugar Ltd |
|
41.154 |
- |
Sundry Creditors for
purchase of power – Godavari Sugar Ltd |
|
41.155 |
- |
Sundry Creditors for
purchase of power – Gujarath Electricity Board |
|
41.156 |
- |
Sundry Creditors for
purchase of power – Chattisgarh State Electricity Board |
|
41.157 |
- |
Sundry Creditors for
purchase of power – Madhya Pradesh Electricity Board |
|
41.158 |
- |
Sundry Creditors for
purchase of power –Vijayalakshmi Hydro Power Pvt Ltd |
|
41.159 |
- |
Sundry Creditors for
purchase of power –Moodabagilu Power Pvt Ltd |
|
41.160 |
- |
Sundry Creditors for
purchase of power – Gem Sugars Ltd |
|
41.161 |
- |
Sundry Creditors for
purchase of power – Prabhat Agri Bio Tech |
|
41.162 |
- |
Sundry Creditors – Un
scheduled Inter change charges payable to PGICL- SREB |
|
41.163 |
- |
Sundry Creditors for
purchase of power – Suttatti Enterprises Ltd |
|
41.164 |
- |
Sundry Creditors for
purchase of power – VXL Systems # II |
|
41.165 |
- |
Sundry Creditors for
purchase of power – Raja Magnetics Ltd |
|
41.166 |
- |
Sundry Creditors for
purchase of power – Mayura Steels Pvt Ltd |
|
41.167 |
- |
Sundry Creditors for
purchase of power – Friends Associate Power Project |
|
41.168 |
- |
Sundry Creditors for
purchase of power – Texmo Precision Castings |
|
41.169 |
- |
Sundry Creditors for
purchase of power – RSM Autokast Ltd |
|
41.170 |
- |
Sundry Creditors for
purchase of power – Patel Shanthi Steels Pvt Ltd |
|
41.171 |
- |
Sundry Creditors for
purchase of power – BSES Ltd(1.8MW) |
|
41.172 |
- |
Sundry Creditors for
purchase of power – Shilpa Antibiotics Ltd |
|
41.173 |
- |
Sundry Creditors for
purchase of power – Indan Energy Pvt Ltd |
|
41.174 |
- |
Sundry Creditors for
purchase of power – Savita Chemicals Ltd |
|
41.175 |
- |
Sundry Creditors for
purchase of power – Elveety Industries Pvt Ltd |
|
41.176 |
- |
Sundry Creditors for
purchase of power – VXL Systems # I |
|
41.177 |
- |
Sundry Creditors for
purchase of power – Siddaganga Oil Extractions Ltd |
|
41.178 |
- |
Sundry Creditors for
purchase of power – Sharp Pumps Pvt. Ltd |
|
41.179 |
- |
Sundry Creditors for
purchase of power – Rajanikanth Foundation |
|
41.180 |
- |
Sundry Creditors for
purchase of power – Panama Business Centre |
|
41.181 |
- |
Sundry Creditors for
purchase of power – Fiza Developers & Inter Trade |
|
41.182 |
- |
Sundry Creditors for
purchase of power – Kamal Trading Company |
|
41.183 |
- |
Sundry Creditors for
purchase of power – Maruthi Power Gen(I) Pvt Ltd |
|
41.184 |
- |
Sundry Creditors for
purchase of power – Jindal Aluminium Ltd |
|
41.185 |
- |
Sundry Creditors for
purchase of power – Shilpa Medicate Ltd |
|
41.186 |
- |
Sundry Creditors for
purchase of power – Cepco Industrial Ltd(0.60 MW) |
|
41.187 |
- |
Sundry Creditors for
purchase of power – MSPL Ltd |
|
41.188 |
- |
Sundry Creditors for
purchase of power – NLC TPS Expansion I & II |
|
41.189 |
- |
Sundry Creditors for
purchase of power –NTPC Talcher Stage II |
|
41.190 |
- |
Sundry Creditors for
purchase of power – Kalson Power Tech. Ltd |
|
41.191 |
- |
Sundry Creditors for
purchase of power – Balsaheb M Ladkat. |
|
41.192 |
- |
Sundry Creditors for
purchase of power – Sanjay D Ghodawat (HUF) |
|
41.193 |
- |
Sundry Creditors for
purchase of power – Topaz Investments Ltd (1.2M.W) |
|
41.194 |
- |
Sundry Creditors for
purchase of power – Ghodwat Pan Masala |
|
41.195 |
- |
Sundry Creditors for
purchase of power – Nuziveedu Seeds Ltd(1.9MW) |
|
41.196 |
- |
Sundry Creditors for
purchase of power – Shriram Investments Ltd |
|
41.197 |
- |
Sundry Creditors for
purchase of power – Texmo Industries Ltd |
|
41.198 |
- |
Sundry Creditors for
purchase of power – Shriram City Union Finance Ltd |
|
41.199 |
- |
Sundry Creditors for
purchase of power – Shriram Transport Finance Ltd |
|
41.200 |
- |
Sundry Creditors for
purchase of power – Lovely Fragrance |
|
41.201 |
- |
Sundry Creditors for
purchase of power – JN Investments |
|
41.202 |
- |
Sundry Creditors for
purchase of power – Enercon (Karnataka) Wind Farm (21MW) |
|
41.203 |
- |
Sundry Creditors for
purchase of power – Mohite & Mohite Pvt Ltd |
|
41.204 |
- |
Sundry Creditors for
purchase of power – Panama Credit & Capital Pvt. Ltd |
|
41.205 |
- |
Sundry Creditors for
purchase of power – Shilpa Medicare Ltd |
|
41.207 |
- |
Sundry Creditors for
purchase of power – Jindal Aluminum 6.6 MW |
|
41.208 |
- |
Sundry Creditors for
purchase of power – Graphite India Ltd-1.5 MW |
|
41.209 |
- |
Sundry Creditors for
purchase of power – MSPL Ltd –Phase II-4.75 MW |
|
41.210 |
- |
Sundry Creditors for
purchase of power – Ramghad Mining-1.9 MW |
|
41.211 |
- |
Sundry Creditors for
purchase of power – Ghodwat Panmasala Products (Nandan Hosur Group)5.4 MW |
|
41.212 |
- |
Sundry Creditors for
purchase of power – International Power Corporation Ltd-2.4 MW |
|
41.213 |
- |
Sundry Creditors for
purchase of power – Encon Service Ltd-3MW |
|
41.214 |
- |
Sundry Creditors for
purchase of power – Neg Micon Pvt Ltd-3.8 MW |
|
41.215 |
- |
Sundry Creditors for
purchase of power – Pallavi Green Power –0.75 MW |
|
41.216 |
- |
Sundry Creditors for
purchase of power – Mansukmal Investments– 0.95 MW |
|
41.217 |
- |
Sundry Creditors for
purchase of power – Bhoruka Power Corporation Limited (Shapura D9)- 1 MW |
|
41.218 |
- |
Sundry Creditors for
purchase of power – Dee Dee Enterprises(Nandan Hosur) 0.6 MW |
|
41.219 |
- |
Sundry Creditors for
purchase of power – Bhagyanagar Solvent Extractions Ltd-5.4 |
|
41.220 |
- |
Sundry Creditors for
purchase of power – Supreme Power Company-0.6 MW |
|
41.221 |
- |
Sundry Creditors for
purchase of power - Royal Energy Company –0.6 MW |
|
41.222 |
- |
Sundry Creditors for
purchase of power – Prime Lables Company –0.25 MW |
|
41.223 |
- |
Sundry Creditors for
purchase of power – R.K.Power Gen Pvt Ltd – 20 MW |
|
41.224 |
- |
Sundry Creditors for
purchase of power – Maruthi Power Gen Pvt Ltd (Hemavathy Project)-1.5 MW |
|
41.225 |
- |
Sundry Creditors for
purchase of power – Nuziveedu Seeds Ltd (NSL-V)-1.9 MW |
|
41.226 |
- |
Sundry Creditors for
purchase of power–Nuziveedu Seeds Ltd (NSL- II & III) -10.5 MW |
|
41.227 |
- |
Sundry Creditors for
purchase of power- Mahe Ltd-0.25 MW |
|
41.228 |
- |
Sundry Creditors for
Purchase of Power – Davangere Sugar Co. Ltd (20 MW) |
|
41.229 |
- |
Sundry Creditors for
Purchase of Power – Goetz (I) Financial Ltd.(9.6MW) |
|
41.230 |
- |
Sundry Creditors for
Purchase of Power – Sanjay .D. Ghodawat (I & II) |
|
41.231 |
- |
Sundry Creditors for
Purchase of Power – Channabasappa & Sons (0.60 MW) |
|
41.232 |
- |
Sundry Creditors for
Purchase of Power –. Associate Autotex Ancillaries Pvt. Ltd (1.20 MW) |
|
41.233 |
- |
Sundry Creditors for
Purchase of Power – Goodluck Syndicate (0.60 MW) |
|
41.234 |
- |
Sundry Creditors for
Purchase of Power – Godawat Pan Masala –4.2 MW |
|
41.235 |
- |
Sundry Creditors for
Purchase of Power – Shreya Laxmi Properties (0.60 MW) |
|
41.236 |
- |
Sundry Creditors for
Purchase of Power – Shraddha Constructions (6.60 MW) |
|
41.237 |
- |
Sundry Creditors for
Purchase of Power – VXL Systems (0.60 MW) |
|
41.238 |
- |
Sundry Creditors for
Purchase of Power – Cepco Insustries – 1.2 MW |
|
41.239 |
- |
Sundry Creditors for
Purchase of Power – Dee Dee Enterprises (EG) (0.60MW) |
|
41.240 |
- |
Sundry Creditors for
Purchase of Power – Samson Distillers Pvt.Ltd. (2 MW) |
|
41.241 |
- |
Sundry Creditors for
Purchase of Power – Star Flexi Pack Industries. (0.60 MW) |
|
41.242 |
- |
Sundry Creditors for
Purchase of Power –.Savitha Chemicals (Encon Group) (0.75 MW) |
|
41.243 |
- |
Sundry Creditors for
purchase of power – B.S.C Textiles. (VVS) (0.6 MWs) |
|
41.244 |
- |
Sundry Creditors for
purchase of power – SCM Sugars Ltd. (26 MWs) |
|
41.245 |
- |
Sundry Creditors for
purchase of power– Sri Indra Power Energies Ltd. |
|
41.246 |
- |
Sundry Creditors for
purchase of power – Madras Cements Ltd. (VVS) – (0.6 MWs). |
|
41.247 |
- |
Sundry Creditors for
purchase of power – Suresh Productions Private Limited– (0.75 MWs). |
|
41.248 |
- |
Sundry Creditors for
purchase of power – Sanghvi Movers Ltd. (0.75 MWs) |
|
41.249 |
- |
Sundry Creditors for
purchase of power – Eswari Garments (1.5 MWs) |
|
41.250 |
- |
Sundry Creditors for
purchase of power – Eswari Knitting Works – (3MWs) |
|
41.251 |
- |
Sundry Creditors for
purchase of power- Eswari Textiles (3 MWs). |
|
41.252 |
- |
Sundry Creditors for
purchase of power – Victus Associate (1.5 MWs). |
|
41.253 |
- |
Sundry Creditors for
purchase of power – Shree Doodhganga Krishna Sahakari Karkhane Niyamit – (24
MWs) |
|
41.254 |
- |
Sundry Creditors for
purchase of power –Kariganur Iron & Steel (P) Ltd. – (0.75 MWs) |
|
41.255 |
- |
Sundry Creditors for
purchase of power – Deefree Engineering (P) Ltd.- (0.6 )MWs) |
|
41.256 |
- |
Sundry Creditors for
purchase of Power - Poweronicks Ltd (5.4 MWs) |
|
41.257 |
- |
Sundry Creditors for
purchase of Power – NCL Energy Ltd (8.25 MWs) |
|
41.258 |
- |
Sundry Creditors for
purchase of Power – SLS Power Industries Ltd (4.5 MWs) |
|
41.259 |
- |
Sundry Creditors for
purchase of Power – Venkateshwara Power Project Ltd (10 MWs) |
|
41.260 |
- |
Sundry Creditors for
purchase of Power - Sahyadri Power Co. (P) Ltd (0.4 Mws) |
|
41.261 |
- |
Sundry Creditors for
purchase of Power – Koppal Green Power (6 MWs) |
|
41.262 |
- |
Sundry Creditors for
purchase of Power - Meghana Automotives (VVS-20) (0.6 MWs) |
|
41.263 |
- |
Sundry Creditors for
purchase of Power – P. Vijaya Kumar (VVS- 22) (0.6 MWs) |
|
41.264 |
- |
Sundry Creditors for
purchase of Power – P. Mohan Lal (VVS-23) (0.6 MWs) |
|
41.265 |
- |
Sundry Creditors for
purchase of Power – Primetex Apparels (VVS- 24) (0.6 MWs) |
|
41.266 |
- |
Sundry Creditors for
purchase of Power – Laxmi Organics (VVS-25) (1.2 MWs) |
|
41.267 |
- |
Sundry Creditors for
purchase of Power – Cooper Foundry (VVS-26) (2.4 MWs) |
|
41.268 |
- |
Sundry Creditors for
purchase of Power – Madeo Soaps (VVS-27) (6.0 MWs) |
|
41.269 |
- |
Sundry Creditors for
purchase of Power – Mineral Enterprises (VVS-28) (3.0 MWs) |
|
41.270 |
- |
Sundry Creditors for
purchase of Power – World Institute of Sustain Energy (VVS-29) (3.0 MWs) |
|
41.271 |
- |
Sundry Creditors for
purchase of Power – Rajesh Constructions (Suzlon Group) (2.5 MWs) |
|
41.272 |
- |
Sundry Creditors for
purchase of Power – Ferromar Shipping (P) Ltd (1.25 MWs) |
|
41.273 |
- |
Sundry Creditors for
purchase of Power – G.M. Aggrawal (Suzlon Group) (2.5 MWs) |
|
41.274 |
- |
Sundry Creditors for
purchase of Power – Sai Spurthi Power (P) Ltd (10.2 MWs) |
|
41.275 |
- |
Sundry Creditors for
purchase of power – Unnathi Projects (VVS- 30) |
|
41.276 |
- |
Sundry Creditors for
purchase of power – Jitendra D Majethia (VVS- 31) |
|
41.277 |
- |
Sundry Creditors for
purchase of power – Brindavan Agro Industries (VVS –33) |
|
41.278 |
- |
Sundry Creditors for
purchase of power – GEM Crafts (VVS –34) |
|
41.279 |
- |
Sundry Creditors for
purchase of power – S.E. Investments Ltd.(VVS–35) |
|
41.280 |
- |
Sundry Creditors for
purchase of power – Sanjana Power (VVS- 37) |
|
41.281 |
- |
Sundry Creditors for
purchase of power – International Conveyers (VVS- 38) |
|
41.282 |
- |
Sundry Creditors for
purchase of power – Swaraj PVC Pipes Ltd (VVS –39) |
|
41.283 |
- |
Sundry Creditors for
purchase of power – I.G.L India Ltd. (VVS –40) |
|
41.284 |
- |
Sundry Creditors for
purchase of power – Amrita Bottlers (P) Ltd (VVS –42) |
|
41.285 |
- |
Sundry Creditors for
purchase of power – M.K. Agrotech (P) Ltd (VVS-43) |
|
41.286 |
- |
Sundry Creditors for
purchase of power – Abhishek Exports |
|
41.287 |
- |
Sundry Creditors for
purchase of power – Amitronics Ltd |
|
41.288 |
- |
Sundry Creditors for
purchase of power – Sanjana Gryogenics |
|
41.289 |
- |
Sundry Creditors for
purchase of power – Navalakha Translines |
|
41.290 |
- |
Sundry Creditors for
purchase of power – Mantri Developers |
|
41.291 |
- |
Sundry Creditors for
purchase of power – Jivraj Tea |
|
41.292 |
- |
Sundry Creditors for
purchase of power – K.R.E.D.L. |
|
41.293 |
- |
Sundry Creditors for
purchase of power – Enercon (Krishna) Wind Farms. |
|
41.294 |
- |
Sundry Creditors for
purchase of power – M/s. Konark Power Project Limited |
|
41.295 |
- |
Sundry Creditors for
purchase of power – M/s Naranja Sahakari Sakkare Karkhane Niyamit. |
|
41.296 |
- |
Sundry Creditors for
purchase of power – Bellary Iron Ores Private Limited |
|
41.297 |
- |
Sundry Creditors for
purchase of power – Sanmathi Power Company |
|
41.298 |
- |
Sundry Creditors for
purchase of power – P Venganashetty & Sons |
|
41.299 |
- |
Sundry Creditors for
purchase of power – Ravikiran Power Project |
|
41.301 |
- |
Sundry Creditors for
purchase of power – M/s Mysore Paper Mills Limited |
|
41.500 |
- |
Provision for Liability for
Purchase of Power |
|
41.600 |
- |
Provision for liability
for inalizati balance of Banked energy as at the year-end. |
|
41.888 |
- |
Liability for Purchase of
Power – Contra Account |
|
42.000 |
- |
Liability
for Supplies/Works |
|
42.101 |
- |
Liability for Supply of
Materials |
|
42.201 |
- |
Sundry Creditors /
Control Account |
|
42.203 |
- |
Sundry Creditors-
Materials received from VVNL |
|
42.204 |
- |
Sundry Creditors – Other
transactions |
|
42.211 |
- |
Payable to VVNL on
TL&SS Expenditure Account. |
|
42.220 |
- |
Pooled account of Payable
to BESCOM(Control Account) |
|
42.221 |
- |
Pooled account of Payable
to MESCOM(Control Account) |
|
42.222 |
- |
Pooled account of Payable
to HESCOM(Control Account) |
|
42.223 |
- |
Pooled account of Payable
to GESCOM(Control Account) |
|
42.238 |
- |
Payable to ESCOMs by
KPTCL to-wards materials procured for MW / TL&SS Divisions |
|
42.239 |
- |
Payable to ESCOM units
towards Released Materials pertaining to MW / TL&SS Divisions |
|
42.240 |
- |
Payable to ESCOM units
towards Assets pertaining to MW / TL&SS Divisions |
|
42.241 |
- |
Material received by
KPTCL Units from BESCOM Units – Payable / Adjustable. |
|
42.249 |
- |
Personnel related amount
payable to BESCOM units – Payable / Adjustable. |
|
42.253 |
- |
Other payables to BESCOM
units– Other transactions. |
|
42.254 |
- |
Other payables to MESCOM
units– Other transactions. |
|
42.255 |
- |
Other payables to HESCOM
units– Other transactions. |
|
42.256 |
- |
Other payables to GESCOM
units– Other transactions. |
|
42.257 |
- |
Other payables to CESCO
units – Other transactions. |
|
42.258 |
- |
Payable to BESCOM towards
Loan drawn by KPTCL on behalf of BESCOM |
|
42.259 |
- |
Payable to MESCOM towards
Loan drawn by KPTCL on behalf of MESCOM |
|
42.260 |
- |
Payable to HESCOM towards
Loan drawn by KPTCL on behalf of HESCOM |
|
42.261 |
- |
Payable to GESCOM towards
Loan drawn by KPTCL on behalf of GESCOM |
|
42.262 |
- |
Cash Payable to BESCOM
for Materials received from BESCOM Units by KPTCL Units. |
|
42.263 |
- |
Cash Payable to MESCOM
for Materials received from MESCOM Units by KPTCL Units. |
|
42.264 |
- |
Cash Payable to HESCOM
for Materials received from HESCOM Units by KPTCL Units. |
|
42.265 |
- |
Cash Payable to GESCOM
for Materials received from GESCOM Units by KPTCL Units. |
|
42.266 |
- |
Personnel related amount
Payable in cash to BESCOM units. |
|
42.267 |
- |
Personnel related amount
Payable in cash to MESCOM units. |
|
42.268 |
- |
Personnel related amount
Payable in cash to HESCOM units. |
|
42.269 |
- |
Personnel related amount
Payable in cash to GESCOM units |
|
42.270 |
- |
Amount payable in cash to
BESCOM units in respect of other Transactions. |
|
42.271 |
- |
Amount payable in cash to
MESCOM units in respect of other Transactions. |
|
42.272 |
- |
Amount payable in cash to
HESCOM units in respect of other Transactions. |
|
42.273 |
- |
Amount payable in cash to
GESCOM units in respect of other Transactions. |
|
42.274 |
- |
Payable to CESCO towards
loan drawn by KPTCL on behalf of CESCO |
|
42.276 |
- |
Distribution Network
charges collected from IPPs payable to HESCOM |
|
42.277 |
- |
Distribution Network
charges collected from IPPs payable to GESCOM |
|
42.278 |
- |
Distribution Network
charges collected from IPPs payable to BESCOM |
|
42.279 |
- |
Distribution Network
charges collected from IPPs payable to MESCOM |
|
42.280 |
- |
Distribution Network
charges collected from IPPs payable to CESCO |
|
42.281 |
- |
Cash payable to CESCORP
for materials received from CESCORP Units by KPTCL Units. |
|
42.282 |
- |
Personnel related amount
payable in cash to CESCORP Units. |
|
42.283 |
- |
Amount payable in cash to
CESCORP Units in respect of other transactions |
|
42.284 |
- |
Pooled Account of
Payables to BESCOM |
|
42.285 |
- |
Pooled Account of
Payables to MESCOM |
|
42.286 |
- |
Pooled Account of
Payables to HESCOM |
|
42.287 |
- |
Pooled Account of
Payables to GESCOM |
|
42.288 |
- |
Pooled Account of
Payables to CESC |
|
42.301 |
- |
Provision for liability
for supply of materials |
|
42.401 |
- |
Contractors’ Control
Account |
|
42.501 |
- |
Provision for Liability
to Contractors |
|
42.601 |
- |
Ad-hoc provision for work
completed in the field but Bills not received |
|
42.701 |
- |
Sundry Creditors /
Control Account- Turnkey Projects. |
|
42.888 |
- |
Liability for supplies/
Works– Contra Account |
|
44.000 |
- |
Staff
Related Liabilities and Provisions |
|
44.100 |
- |
Staff Related
Liability & Provisions |
|
44.110 |
- |
Provision for Gratuity |
|
44.120 |
- |
Provision for Pension |
|
44.121 |
- |
Pension Trust – Provision
made towards pensionery benefits in respect of existing employees as on
31-3-2000 |
|
44.122 |
- |
Pension Trust – Provision
for payment to Trust towards pension and gratuity in respect of existing
employees |
|
44.130 |
- |
Provision for Earned
Leave Encashment Fund |
|
44.140 |
- |
Provision for Family
Benefit Fund |
|
44.141 |
- |
Provision for Family
Benefit Fund due in respect of employees as on 31.3.2000 |
|
44.142 |
- |
Provision for Family
Benefit Fund with effect from 1-4-2000 and onwards. |
|
44.143 |
- |
Provision for Family
Benefit Fund with effect from 01-10-2007 and onwards |
|
44.150 |
- |
Provision for KPTCL
Contribution to Contributory Pension Scheme with effect from 1-4-2006 |
|
44.200 |
- |
Unpaid Salaries,
Bonus etc |
|
44.210 |
- |
Unpaid Salaries |
|
44.220 |
- |
Unpaid Bonus |
|
44.274 |
- |
Pension & Leave
contribution collected from Employees for counting their past service in
other departments and payable to P&G Trust. |
|
44.275 |
- |
Pension & Leave
contribution remitted by Other Departments in respect of Employees of KPTCL
on deputation and payable to P&G Trust. |
|
44.300 |
- |
Salaries / Bonus
etc, Payable |
|
44.310 |
- |
Salary payable |
|
44.311 |
- |
Salary Payable to
Contract A.Es/J.Es. |
|
44.320 |
- |
Bonus payable |
|
44.330 |
- |
Ex-Gratia payable |
|
44.888 |
- |
Stock related Liabilities
provisions– Contra Account and |
|
46.000 |
- |
Other
Liabilities and Provisions |
|
46.101 |
- |
Security Deposits in cash
from Suppliers / Contractors |
|
46.102 |
- |
Security deposit other
than in cash from suppliers / contractors(Contra) |
|
46.103 |
- |
KPTCL Pensioners / Family
Pensioners Family Benefit / Security Fund |
|
46.104 |
- |
Retention Money – Bill
amount retained as per Terms of Purchase order / Turnkey contract. |
|
46.105 |
- |
Security Deposits
received from Open Access Customers. |
|
46.106 |
- |
Meter Security Deposits
received from Open Access Customers. |
|
46.107 |
- |
Funds received from
Resources Section, KPTCL to SPPCC |
|
46.108 |
- |
Funds Received from
Resource Section, KPTCL to SLDC |
|
46.109 |
- |
Penalty recovered,
pending decision for refund |
|
46.142 |
- |
Provision for FBF. |
|
46.300 |
- |
Electricity Tax and
other Levis payable to Government |
|
46.400 |
- |
Liability for
Expenses |
|
46.410 |
- |
Sundry Creditors for
Expenses |
|
46.411 |
- |
Sundry Creditors for
Travelling Allowance to Contract A.E /J.E |
|
46.420 |
- |
Lease rent and all other
dues payable to M/s IL & FS |
|
46.427 |
- |
Lease rent and all other
dues payable to M/S HDFC |
|
46.430 |
- |
Provision for Liability
for Expenses. |
|
46.433 |
- |
Bills Payable
Account(RPGTL / ICICI) |
|
46.435 |
- |
Bills payable towards 20%
Share of revenue expenditure to TBHES- TB Dam |
|
46.440 |
- |
Inspection Charges
payable to Government. |
|
46.441 |
- |
Guarantee Commission
payable to Government |
|
46.450 |
- |
Royalty payable to
Government |
|
46.460 |
- |
Excise duty payable to
Government |
|
46.470 |
- |
Duty and Taxes payable to
Government. |
|
46.600 |
- |
Remittances
Received from Escoms |
|
46.601 |
- |
Remittances received from
Bangalore Electricity Supply Company - Payable / Adjustable. |
|
46.602 |
- |
Remittances received from
Mangalore Electricity Supply Company – Payable / Adjustable |
|
46.603 |
- |
Remittances received from
Hubli Electricity Supply Company - Payable / Adjustable. |
|
46.604 |
- |
Remittances received from
Gulbarga Electricity Supply Company - Payable / Adjustable. |
|
46.605 |
- |
Remittances received from
Chamundeswari Electricity Supply Corporation - Payable / Adjustable. |
|
46.700 |
- |
Accrued / Unclaimed
Amounts Relating to Borrowings |
|
46.710 |
- |
Interest accrued but not
due on borrowings |
|
46.720 |
- |
Unclaimed Interest on
Borrowings |
|
46.730 |
- |
Unclaimed repayments on
Bonds/ Debentures. |
|
46.800 |
- |
Provision for Income Tax |
|
46.888 |
- |
Other liabilities and
Provisions– Contra Account |
|
46.900 |
- |
Sundry Liabilities
for Provisions:- Cheques, etc, in Transit |
|
46.901 |
- |
Tax deducted at source
from supply of goods & services or both - Central goods and service
tax(CGST) |
|
46.902 |
- |
Tax deducted at source
from supply of goods & services or both - State goods and service
tax(SGST) |
|
46.903 |
- |
Tax deducted at source
from supply of goods & services or both - Union territory goods and
service tax(UTGST) |
|
46.904 |
- |
Tax deducted at source
from supply of goods & services or both - Inter State goods and service
tax(IGST) |
|
46.910 |
- |
Stale Cheques |
|
46.911 |
- |
Un-issued Cheques |
|
46.914 |
- |
Supervision charges
allocated |
|
46.920 |
- |
Security Deposit from
Employees |
|
46.921 |
- |
Service Tax Collected and
payable to Central Excise Dept |
|
46.922 |
- |
Advance received for sale
of Stores scrap etc., |
|
46.923 |
- |
Income Tax deducted at
source on payment of interest on borrowings. |
|
46.924 |
- |
Income tax deducted at
source on payment to Contractors. |
|
46.925 |
- |
Income Tax deducted at
source on other payments. |
|
46.926 |
- |
Tax recovered on sale of
Stores, Scrap etc., |
|
46.927 |
- |
Sales Tax / VAT deducted
at source and payable to Department. |
|
46.928 |
- |
Amount recovered from
salary of Corporation employees and payable to other departments / other
institutions. |
|
46.929 |
- |
Scheduling and system
operation charges and Transaction charges collected from Open Access
Customers |
|
46.930 |
- |
Amount recovered from
Salary of
Contract Junior Engineers &
Gang men towards Employee’s portion of EPF
contribution. |
|
46.931 |
- |
KPTCL portion of PF
contribution, ELIS etc in respect of Contract JEEs’ & Gangmen payable to
E.P.F. authorities. |
|
46.932 |
- |
Advance collected from
BESCOM towards share of O&M expenses of SLDC recoverable from Generating
companies through BESCOM |
|
46.933 |
- |
Advance collected from
MESCOM towards share of O&M expenses of SLDC recoverable from Generating
companies through MESCOM |
|
46.934 |
- |
Advance collected from
HESCOM towards share of O&M expenses of SLDC recoverable from Generating
companies through HESCOM |
|
46.935 |
- |
Government Subsidy
Refundable |
|
46.936 |
- |
Advance collected from
CESCO towards share of O&M expenses of SLDC recoverable from Generating
companies through CESCO |
|
46.937 |
- |
Unscheduled Interchange
charges collected from Short term open access customers and payable /
adjustable to ESCOMS |
|
46.938 |
- |
Unscheduled Interchange
charges collected from ESCOMS and payable to Short term open access customers |
|
46.939 |
- |
Advance collected from
GESCOM towards share of O & M Expenses of SLDC recoverable from
Generating Companies through GESCOM (Description of the account code 46.935
as in Cys:6 dated 24.4.2006 remains unaltered.) |
|
46.940 |
- |
Amount payable to other
departments towards Pension and Leave contribution in respect of employees of
other departments working in KPTCL on deputation. |
|
46.941 |
- |
Income Tax Collected at
source(TCS) |
|
46.942 |
- |
CESS Payable to Karnataka
State Building & Other Construction Workers Welfare Board |
|
46.943 |
- |
Deferred Income |
|
46.948 |
- |
Outstanding assets not in
service to be written off. |
|
46.949 |
- |
Provision for losses
pending investigation for write off of loss of stores. |
|
46.951 |
- |
Sales Tax /VAT payable |
|
46.952 |
- |
Amount recovered from
salary of employees towards Employee’s Contribution to Contributory Pension
Scheme with effect from - 1-4-2006 |
|
46.953 |
- |
Contributory Pension
Scheme Contribution Payable to P&G Trust. |
|
46.954 |
- |
Amount Recovered from
Employees and payable to Employees Welfare Trust towards Employees
contribution |
|
46.956 |
- |
Central goods and service
tax(CGST) |
|
46.958 |
- |
State goods and service
tax(SGST) |
|
46.959 |
- |
Union territory goods and
service tax(UTGST) |
|
46.960 |
- |
Inter State goods and
service tax(IGST) |
|
46.961 |
- |
Provision for loss on
obsolescence of Capital Assets. |
|
46.962 |
- |
Provision for Loss on
Obsolescence of Capital Spares. |
|
46.963 |
- |
Provision for Loss on Obsolescence
of Stores in Stock. |
|
46.964 |
- |
Provision for loss or
write off of shortages found on physical verification of stock. |
|
46.966 |
- |
Miscellaneous Deposits |
|
46.967 |
- |
Janatha Personal Accident
Fund |
|
46.971 |
- |
Excess Credit afforded by
Banks pending reconciliation-SBM |
|
46.972 |
- |
Excess Credit afforded by
Banks pending reconciliation – SBI |
|
46.973 |
- |
Excess Credit afforded by
Banks pending reconciliation – SBH |
|
46.974 |
- |
Excess Credit afforded by
Banks pending reconciliation – Canara Bank |
|
46.975 |
- |
Excess Credit afforded by
Banks pending reconciliation – Syndicate Bank. |
|
46.976 |
- |
Excess credit afforded by
Banks pending reconciliation-BOB |
|
46.977 |
- |
Excess credit afforded by
Banks pending reconciliation-ICICI Bank. |
|
46.978 |
- |
Employees Contribution to
Chief Minister Draught / calamity relief Fund |
|
46.979 |
- |
RE Subsidy released by
Department of Energy, Government of Karnataka to ESCOMs through KPTCL and
accounted as payable to ESCOMs in KPTCL Accounts. |
|
46.980 |
- |
Electricity dues of ULBs/
KUWSDB, released by Department of Energy, Government of Karnataka to ESCOMs
through KPTCL and accounted as payable to ESCOMs in KPTCL Accounts. |
|
46.981 |
- |
Electricity dues of Gram
Panchayats released by Department of Energy, Government of Karnataka to
ESCOMs through KPTCL and accounted as payable to ESCOMs in KPTCL Accounts. |
|
46.982 |
- |
Other Releases by
Department of Energy, Government of Karnataka to ESCOMs through KPTCL and
accounted as payable to ESCOMs in KPTCL Accounts |
|
46.983 |
- |
Additional Fixed cost of
TBPCL recoverable from ESCOMS to be adjusted against Subsidy receivable from
GOK. |
|
46.984 |
- |
Difference between Transmission
charges approved by KERC (19.42 paise per unit) & Transmission charges
already billed by KPTCL (26.23 paise per unit). Payable to BESCOM pending
refixation of tariff by KERC in view of ATE orders |
|
46.985 |
- |
Difference between
Transmission charges approved by KERC (19.42 paise per unit) &
Transmission charges already billed by KPTCL (26.23 paise per unit). Payable
to MESCOM pending refixation of tariff by KERC in view of ATE orders |
|
46.986 |
- |
Difference between
Transmission charges approved by KERC (19.42 paise per unit) &
Transmission charges already billed by KPTCL (26.23 paise per unit). Payable
to HESCOM pending refixation of tariff by KERC in view of ATE orders |
|
46.987 |
- |
Difference between
Transmission charges approved by KERC (19.42 paise per unit) &
Transmission charges already billed by KPTCL (26.23 paise per unit). Payable
to GESCOM pending refixation of tariff by KERC in view of ATE orders |
|
46.988 |
- |
Difference between
Transmission charges approved by KERC (19.42 paise per unit) &
Transmission charges already billed by KPTCL (26.23 paise per unit). Payable
to CESC pending refixation of tariff by KERC in view of ATE orders |
|
46.989 |
- |
Difference between
Transmission charges approved by KERC (19.42 paise per unit) &
Transmission charges already billed by KPTCL (26.23 paise per unit). Payable
to HUKKERI SOCIETY pending refixation of tariff by KERC in view of ATE orders |
|
46.990 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT payable to BESCOM |
|
46.991 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT payable to MESCOM |
|
46.992 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT payable to HESCOM |
|
46.993 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT payable to GESCOM |
|
46.994 |
- |
Unscheduled Interchange
charges pertaining to Intra-State ABT payable to CESC |
|
47.000 |
- |
Deposits
for Works |
|
47.100 |
- |
Deposits for
Electrification of Villages. |
|
47.200 |
- |
Deposit for Electrification of Industrial
Estates. |
|
47.300 |
- |
Deposits for Service
Connections. |
|
47.301 |
- |
Advance power charges. |
|
47.302 |
- |
Additional advance power
charges. |
|
47.303 |
- |
New service connection
deposits. |
|
47.305 |
- |
Deposit Contribution
Works – Govt. Departments, Local / Private Bodies and Corporations. |
|
47.306 |
- |
Deposit Works |
|
47.307 |
- |
Ganga Kalyana Scheme -
Deposits received |
|
47.308 |
- |
Ganga Kalyana Scheme –
Deposits received Karnataka Backward Classes Development Corporation |
|
47.309 |
- |
Ganga Kalyana Scheme –
Deposits received from Karnataka Minorities Development Corporation |
|
47.311 |
- |
Deposit contribution
works -Service connection - HT / LT consumers. |
|
47.312 |
- |
Deposit contribution
works – Schemes outside the State Sector |
|
47.315 |
- |
Deposits received from
BESCOM for Execution of 33KV lines and station works |
|
47.316 |
- |
Deposits received from
MESCOM for Execution of 33KV lines and station works |
|
47.317 |
- |
Deposits received from
HESCOM for Execution of 33KV lines and station works |
|
47.318 |
- |
Deposits received from
GESCOM for Execution of 33KV lines and station works |
|
47.319 |
- |
Deposits received from
CESCO for Execution of 33KV lines and station works |
|
47.320 |
- |
Deposits received from
IPPs for providing MVAR Capacitors at Sub-stations of KPTCL |
|
47.321 |
- |
Deposits received from
Open Access Customers for strengthening the system. |
|
47.601 |
- |
Deposits received against
burnt meter. |
|
47.602 |
- |
Power Development
Deposits |
|
47.603 |
- |
Security Deposits for
metering equipment. |
|
47.604 |
- |
MSD collected from AEH
installations serviced from 1.1.1997 |
|
47.605 |
- |
MSD collected from AEH
installations serviced prior 1.1.1997 |
|
47.606 |
- |
MSD differential amount collected
from AEH installations |
|
47.607 |
- |
Revenue Suspense |
|
47.608 |
- |
Voluntary Loan
Contributions from I.P. consumers. |
|
47.609 |
- |
Revenue Collection
pending classification over Sundry Debtors. |
|
47.888 |
- |
Deposit Contribution
Works– Contra Account |
|
48.000 |
- |
Security Deposits from
Consumers |
|
48.100 |
- |
Security Deposits From
Consumers (In cash) |
|
48.101 |
- |
Initial Security Deposit
from consumers (in cash) |
|
48.102 |
- |
Additional Security
Deposit collected from consumers (in cash) upto 31.03.1997 |
|
48.103 |
- |
Additional Security
Deposit collected from consumers (in
cash) from 01.04.1997 |
|
48.200 |
- |
Security Deposit from
consumers(other than in cash)(contra) |
|
48.300 |
- |
Interest Payable on
Consumers Deposits. |
|
48.310 |
- |
Interest payable on advance
and additional advance power charges. |
|
48.320 |
- |
Interest payable on New
Service Connection Deposit. |
|
48.330 |
- |
Interest payable on
voluntary loan contributions. |
|
48.340 |
- |
Interest payable on
consumers Security Deposits. |
|
48.350 |
- |
Interest payable on
consumers Meter Security Deposit. |
|
50.000 |
- |
Borrowings
for Working Capital |
|
50.100 |
- |
Cash Credit from
Banks |
|
50.110 |
- |
State Bank of Mysore |
|
50.120 |
- |
Syndicate Bank |
|
50.130 |
- |
Canara Bank |
|
50.140 |
- |
State Bank of India |
|
50.150 |
- |
State Bank of Hyderabad |
|
50.200 |
- |
Bank Over Draft |
|
50.210 |
- |
State Bank of Mysore |
|
50.220 |
- |
Syndicate Bank |
|
50.230 |
- |
Canara Bank |
|
50.240 |
- |
State Bank of India |
|
50.250 |
- |
State Bank of Hyderabad |
|
50.300 |
- |
Short Term
Borrowings |
|
50.301 |
- |
Short term borrowings –
IDBI |
|
50.888 |
- |
Borrowing for Working
Capital– Contra Account |
|
51.000 |
- |
Payments
Due on Capital Liabilities |
|
51.100 |
- |
Repayments Due |
|
51.101 |
- |
Public Bonds |
|
51.102 |
- |
Repayment due – Private
Bonds |
|
51.103 |
- |
R.E. Debentures |
|
51.104 |
- |
R.E. Debentures –
Matching Contribution |
|
51.110 |
- |
Loan from L.I.C |
|
51.112 |
- |
Loans from Agricultural
Refinance Corporation |
|
51.113 |
- |
Loan from Agricultural
Finance Corporation |
|
51.114 |
- |
Loans from Rural
Electrification Corporation |
|
51.115 |
- |
Loans from NABARD |
|
51.116 |
- |
Loans from Commercial
Banks for Electrification Schemes |
|
51.119 |
- |
Loans from State Govt. |
|
51.121 |
- |
Amount received from
State Govt. for repayments guaranteed |
|
51.122 |
- |
Amount received from
State Govt. for interest guaranteed. |
|
51.123 |
- |
Loans from REC for SPA
Schemes. |
|
51.124 |
- |
Loans from HUDCO |
|
51.125 |
- |
Loans from HDFC |
|
51.126 |
- |
Loans from IDBI |
|
51.127 |
- |
Inventory Loan from Rural
Electrification Corporation |
|
51.128 |
- |
Loans from Power Finance
Corporation. |
|
51.129 |
- |
Repayments due on loan
from KIADB |
|
51.133 |
- |
Repayment due on
inalization REC loans |
|
51.135 |
- |
Repayments due on loans
from M/s ICICI Ltd., - Capital works. |
|
51.136 |
- |
Repayments due on loans
released by GOI through GOK for APDP works |
|
51.137 |
- |
Repayments due on loans
released by GOI through GOK for Pradhan Manthri Gramodaya Yojana works. |
|
51.138 |
- |
Repayments due on loans
drawn from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL
for BESCOM |
|
51.139 |
- |
Repayments due on loans
drawn from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL
for MESCOM |
|
51.140 |
- |
Repayments due on loans
drawn from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL
for HESCOM |
|
51.141 |
- |
Repayments due on loans
drawn from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL
for GESCOM |
|
51.142 |
- |
Repayments due on loans
drawn from REC in respect of ongoing SPA Scheme works by KPTCL for BESCOM |
|
51.143 |
- |
Repayments due on loans
drawn from REC in respect of ongoing SPA Scheme works by KPTCL for MESCOM |
|
51.144 |
- |
Repayments due on loans
drawn from REC in respect of ongoing SPA Scheme works by KPTCL for HESCOM |
|
51.145 |
- |
Repayments due on loans
drawn from REC in respect of ongoing SPA Scheme works by KPTCL for GESCOM |
|
51.146 |
- |
Repayments due on loans
drawn from Power Finance Corporation Ltd in respect of ongoing schemes by
KPTCL for BESCOM |
|
51.147 |
- |
Repayments due on loans
drawn from Power Finance Corporation Ltd in respect of ongoing schemes by
KPTCL for MESCOM |
|
51.148 |
- |
Repayments due on loans
drawn from Power Finance Corporation Ltd in respect of ongoing schemes by
KPTCL for HESCOM |
|
51.149 |
- |
Repayments due on loans
drawn from Power Finance Corporation Ltd in respect of ongoing schemes by
KPTCL for GESCOM |
|
51.150 |
- |
Repayments due on loans
drawn from GOK in respect of ongoing APRDP works by KPTCL for BESCOM |
|
51.151 |
- |
Repayments due on loans
drawn from GOK in respect of ongoing APRDP works by KPTCL for MESCOM |
|
51.152 |
- |
Repayments due on loans
drawn from GOK in respect of ongoing APRDP works by KPTCL for HESCOM |
|
51.153 |
- |
Repayments due on loans
drawn from GOK in respect of ongoing APRDP works by KPTCL for GESCOM |
|
51.154 |
- |
Repayments due on Short
term Loans obtained from Commercial Banks / Financial Institutions |
|
51.155 |
- |
Repayments due on Loans
obtained from UCO Bank |
|
51.156 |
- |
Repayments due on Loans
drawn by KPTCL from UCO Bank on behalf of BESCOM |
|
51.157 |
- |
Repayments due on Loans
drawn by KPTCL from UCO Bank on behalf of MESCOM |
|
51.158 |
- |
Repayments due on Loans
drawn by KPTCL from UCO Bank on behalf of HESCOM |
|
51.159 |
- |
Repayments due on Loans
drawn by KPTCL from UCO Bank on behalf of GESCOM |
|
51.160 |
- |
Repayments due on Loans
obtained from Vijaya Bank |
|
51.161 |
- |
Repayments due on Loans
drawn from South Indian Bank |
|
51.162 |
- |
Repayments due on Loans
drawn from Punjab National Bank |
|
51.163 |
- |
Repayments due on loans
drawn from Oriental Bank of Commerce. |
|
51.164 |
- |
Repayments due on loans
drawn from Corporation Bank |
|
51.165 |
- |
Repayments due on loans
drawn from Bank of Maharashtra |
|
51.166 |
- |
Repayments due on loans
drawn from Bank of India |
|
51.167 |
- |
Repayments due on loans
drawn from Bank of Baroda |
|
51.168 |
- |
Repayments due on Loans
obtained from Indian Bank. |
|
51.169 |
- |
Repayments due on Loans
obtained from Bank of Rajasthan. |
|
51.170 |
- |
Repayments due on loans
obtained from Punjab and Sind Bank |
|
51.171 |
- |
Repayments due on loans
obtained from Canara Bank. |
|
51.200 |
- |
Interest Accrued
and Due |
|
51.201 |
- |
Interest Accrued and due
Public Bonds |
|
51.202 |
- |
Interest Accrued and Due
– Private Bonds |
|
51.203 |
- |
Interest Accrued and due
on R.E. Debentures |
|
51.204 |
- |
Interest Accrued and due
on R.E. Debentures – Matching contribution |
|
51.210 |
- |
Interest Accrued and due
on Loans drawn L.I.C. |
|
51.212 |
- |
Interest Accrued and due
on Loans drawn Agricultural Refinance Corporation |
|
51.213 |
- |
Interest Accrued and due
on Loans from Agricultural Finance Corporation |
|
51.214 |
- |
Interest Accrued and due
on Loans from Rural Electrification Corporation |
|
51.215 |
- |
Interest Accrued and due
on Loans from NABARD |
|
51.216 |
- |
Interest Accrued and due
on Loans from Commercial Banks for Electrification schemes |
|
51.219 |
- |
Interest Accrued and due
on State Government Loans |
|
51.221 |
- |
Amount received from
State Government for repayments guaranteed |
|
51.222 |
- |
Amount received from
State Government for interest guaranteed |
|
51.223 |
- |
Interest Accrued and due
on Loans from REC for SPA schemes |
|
51.224 |
- |
Interest Accrued and due
on Loans from HUDCO |
|
51.225 |
- |
Interest Accrued and due
on Loans from HDFC |
|
51.226 |
- |
Interest Accrued and due
on Loans from IDBI |
|
51.227 |
- |
Interest Accrued and due
on Inventory loan from REC |
|
51.228 |
- |
Interest Accrued and due
on Loans from Power Finance Corporation |
|
51.229 |
- |
Interest Accrued and due
on Interest accrued and due on loans from KIADB |
|
51.231 |
- |
Interest Accrued and due
on loan from REC, OECF Project |
|
51.232 |
- |
Interest Accrued and due
on loans from SIDBI. |
|
51.233 |
- |
Interest Accrued and due
on inalization REC loans |
|
51.235 |
- |
Interest Accrued and due
on loans from M/s ICICI Ltd., - Capital Works. |
|
51.236 |
- |
Interest Accrued and due
on loans released by GOI through GOK for APDP works |
|
51.237 |
- |
Interest Accrued and due
on loans released by GOI through GOK for Pradhan Manthri Gramodaya Yojana
works. |
|
51.238 |
- |
Interest Accrued and due
on loans drawn from Commercial Banks in respect of ongoing SPA Scheme works
by KPTCL for BESCOM |
|
51.239 |
- |
Interest Accrued and due
on loans drawn from Commercial Banks in respect of ongoing SPA Scheme works
by KPTCL for MESCOM |
|
51.240 |
- |
Interest Accrued and due
on loans drawn from Commercial Banks in respect of ongoing SPA Scheme works
by KPTCL for HESCOM |
|
51.241 |
- |
Interest Accrued and due
on loans drawn from Commercial Banks in respect of ongoing SPA Scheme works
by KPTCL for GESCOM |
|
51.242 |
- |
Interest Accrued and due
on loans drawn from REC in respect of ongoing SPA Scheme works by KPTCL for
BESCOM |
|
51.243 |
- |
Interest Accrued and due
on loans drawn from REC in respect of ongoing SPA Scheme works by KPTCL for
MESCOM |
|
51.244 |
- |
Interest Accrued and due
on loans drawn from REC in respect of ongoing SPA Scheme works by KPTCL for
HESCOM |
|
51.245 |
- |
Interest Accrued and due
on loans drawn from REC in respect of ongoing SPA Scheme works by KPTCL for
GESCOM |
|
51.246 |
- |
Interest Accrued and due
on loans drawn from Power Finance Corporation Ltd in respect of ongoing
schemes by KPTCL for BESCOM |
|
51.247 |
- |
Interest Accrued and due
on loans drawn from Power Finance Corporation Ltd in respect of ongoing
schemes by KPTCL for MESCOM |
|
51.248 |
- |
Interest Accrued and due
on loans drawn from Power Finance Corporation Ltd in respect of ongoing
schemes by KPTCL for HESCOM |
|
51.249 |
- |
Interest Accrued and due
on loans drawn from Power Finance Corporation Ltd in respect of ongoing
schemes by KPTCL for GESCOM |
|
51.250 |
- |
Interest Accrued and due
on loans drawn from GOK in respect of ongoing APRDP works by KPTCL for BESCOM |
|
51.251 |
- |
Interest Accrued and due
on loans drawn from GOK in respect of ongoing APRDP works by KPTCL for MESCOM |
|
51.252 |
- |
Interest Accrued and due
on loans drawn from GOK in respect of ongoing APRDP works by KPTCL for HESCOM |
|
51.253 |
- |
Interest Accrued and due
on loans drawn from GOK in respect of ongoing APRDP works by KPTCL for GESCOM |
|
51.254 |
- |
Interest Accrued and due
on Short term Loans obtained from Commercial Banks / Financial Institutions |
|
51.255 |
- |
Interest Accrued and due
on Loans obtained from UCO Bank |
|
51.256 |
- |
Interest Accrued and due
on Loans drawn by KPTCL from UCO Bank on behalf of BESCOM |
|
51.257 |
- |
Interest Accrued and due
on Loans drawn by KPTCL from UCO Bank on behalf of MESCOM |
|
51.258 |
- |
Interest Accrued and due
on Loans drawn by KPTCL from UCO Bank on behalf of HESCOM |
|
51.259 |
- |
Interest Accrued and due
on Loans drawn by KPTCL from UCO Bank on behalf of GESCOM |
|
51.260 |
- |
Interest Accrued and due
on Loans obtained from Vijaya Bank |
|
51.261 |
- |
Interest accured and due
on Loans drawn from South Indian Bank |
|
51.262 |
- |
Interest Accrued and due
on Loans drawn from Punjab National Bank |
|
51.263 |
- |
Interest accrued and due
on loans drawn from Oriental Bank of Commerce. |
|
51.264 |
- |
Interest accrued and due
on loans drawn from Corporation Bank |
|
51.265 |
- |
Interest accrued and due
on loans drawn from Bank of Maharashtra |
|
51.266 |
- |
Interest accrued and due
on loans drawn from Bank of India |
|
51.267 |
- |
Interest accrued and due
on loans drawn from Bank of Baroda |
|
51.268 |
- |
Interest Accrued and due
on Loans obtained from Indian Bank. |
|
51.269 |
- |
Interest Accrued and due
on Loans obtained from Bank of Rajasthan. |
|
51.270 |
- |
Interest Accrued and due
on loans obtained from Punjab and Sind Bank. |
|
51.271 |
- |
Interest Accrued and due
on loans obtained from Canara Bank |
|
51.888 |
- |
Payments due on Capital Liabilities–
Contra Account |
|
52.000 |
- |
Capital
Liabilities(Other than State Govt, Loans) |
|
52.100 |
- |
Bonds |
|
52.110 |
- |
Public Bonds |
|
52.111 |
- |
Private Bonds |
|
52.200 |
- |
Debentures |
|
52.210 |
- |
R.E. Debentures |
|
52.250 |
- |
R.E. Debentures –
matching contribution |
|
52.300 |
- |
Shares |
|
52.301 |
- |
Promoters Share Capital
investment-KPTCL |
|
52.302 |
- |
Deposit towards Share
Capital by GOK |
|
52.303 |
- |
Net-Worth |
|
52.304 |
- |
Proposed adjustments to
Net- worth – Resource Section |
|
52.305 |
- |
Proposed adjustments to
Net- worth – Resource Section |
|
52.306 |
- |
Proposed adjustments to
Net- worth – LDC. |
|
52.307 |
- |
Proposed adjustments to
Net- worth – Head Office |
|
52.308 |
- |
Proposed adjustments to
Net- worth – Others. |
|
52.309 |
- |
Proposed adjustments to
Net- worth – Administration Section. |
|
52.500 |
- |
Loans from Life
Insurance Corporation of india |
|
52.888 |
- |
Payments due on Capital
Liabilities Capital Liabilities Other than State Government Loans) – Contra
Account |
|
53.000 |
- |
Capital
Liabilities(Other than State Govt, Loans) |
|
53.100 |
- |
Loans from
Agricultural Refinance Corporation |
|
53.200 |
- |
Loans from
Agricultural Finance Corporation |
|
53.300 |
- |
Loans from Rural
Electrification Corporation |
|
53.301 |
- |
Loans from REC – OECF –
Japan |
|
53.302 |
- |
Loans from
REC-rationalised REC loans |
|
53.304 |
- |
Loans from M/s ICICI
Ltd., - Capital Works |
|
53.306 |
- |
Loans released by GOI
through GOK for APDP Works |
|
53.307 |
- |
Loans released by GOI
through GOK for Pradhan Manthri Gramodaya Yojana works. |
|
53.308 |
- |
Loans drawn from
Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for BESCOM |
|
53.309 |
- |
Loans drawn from
Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for MESCOM |
|
53.310 |
- |
Loans drawn from
Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for HESCOM |
|
53.311 |
- |
Loans drawn from
Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for GESCOM |
|
53.312 |
- |
Loans drawn from REC in
respect of ongoing SPA Scheme works by KPTCL for BESCOM |
|
53.313 |
- |
Loans drawn from REC in
respect of ongoing SPA Scheme works by KPTCL for MESCOM |
|
53.314 |
- |
Loans drawn from REC in
respect of ongoing SPA Scheme works by KPTCL for HESCOM |
|
53.315 |
- |
Loans drawn from REC in
respect of ongoing SPA Scheme works by KPTCL for GESCOM |
|
53.316 |
- |
Loans drawn from Power
Finance Corporation Ltd., in respect of ongoing schemes by KPTCL for BESCOM |
|
53.317 |
- |
Loans drawn from Power
Finance Corporation Ltd in respect of ongoing schemes by KPTCL for MESCOM |
|
53.318 |
- |
Loans drawn from Power
Finance Corporation Ltd in respect of ongoing schemes by KPTCL for HESCOM |
|
53.319 |
- |
Loans drawn from Power
Finance Corporation Ltd in respect of ongoing schemes by KPTCL for GESCOM |
|
53.320 |
- |
Loans drawn from GOK in
respect of ongoing APRDP works by KPTCL for BESCOM |
|
53.321 |
- |
Loans drawn from GOK in
respect of ongoing APRDP works by KPTCL for MESCOM |
|
53.322 |
- |
Loans drawn from GOK in
respect of ongoing APRDP works by KPTCL for HESCOM |
|
53.323 |
- |
Loans drawn from GOK in
respect of ongoing APRDP works by KPTCL for GESCOM |
|
53.324 |
- |
Short term Loans obtained
from Commercial Banks / Financial Institutions |
|
53.325 |
- |
Loans obtained from UCO
Bank |
|
53.326 |
- |
Loans drawn by KPTCL from
UCO Bank on behalf of BESCOM |
|
53.327 |
- |
Loans drawn by KPTCL from
UCO Bank on behalf of MESCOM |
|
53.328 |
- |
Loans drawn by KPTCL from
UCO Bank on behalf of HESCOM |
|
53.329 |
- |
Loans drawn by KPTCL from
UCO Bank on behalf of GESCOM |
|
53.330 |
- |
Loans obtained from
Vijaya Bank |
|
53.331 |
- |
APDRP Loan Disbursable to
ESCOM Account – GOK Loan |
|
53.332 |
- |
APDRP Loan Disbursable to
ESCOM Account – REC Loan |
|
53.333 |
- |
Pooled APDRP Loan
Receivable from ESCOMS – GOK Loan |
|
53.334 |
- |
Pooled APDRP Loan
Receivable from ESCOMS – REC Loan |
|
53.335 |
- |
APDRP – GOK Loan Account |
|
53.336 |
- |
APDRP – REC Loan Account |
|
53.337 |
- |
APDRP – GOK Loan
Receivable from BESCOM |
|
53.338 |
- |
APDRP – GOK Loan
Receivable from MESCOM |
|
53.339 |
- |
APDRP – GOK Loan
Receivable from HESCOM |
|
53.340 |
- |
APDRP – GOK Loan
Receivable from GESCOM |
|
53.341 |
- |
APDRP – REC Loan
Receivable from BESCOM |
|
53.342 |
- |
APDRP – REC Loan
Receivable from MESCOM |
|
53.343 |
- |
APDRP – REC Loan
Receivable from HESCOM |
|
53.344 |
- |
APDRP – REC Loan
Receivable from GESCOM |
|
53.345 |
- |
Loans from South Indian
Bank |
|
53.346 |
- |
Loans drawn from Punjab
National Bank |
|
53.347 |
- |
Loans drawn from Oriental
Bank of Commerce. |
|
53.348 |
- |
Loans drawn from REC in
respect of ongoing SPA schemes by KPTCL for CESCO |
|
53.349 |
- |
Loans drawn from PFC in
respect of ongoing schemes by KPTCL for CESCO |
|
53.350 |
- |
Loans drawn by KPTCL from
UCO Bank on behalf of CESCO |
|
53.351 |
- |
APDRP – GOK Loan
receivable from CESCO |
|
53.352 |
- |
APDRP – REC Loan
receivable from CESCO |
|
53.353 |
- |
Loan drawn from
Corporation Bank |
|
53.354 |
- |
Loan drawn from Bank of
Maharashtra |
|
53.355 |
- |
Loans drawn from Bank of
India |
|
53.356 |
- |
Loans drawn from Bank of
Baroda |
|
53.357 |
- |
Loans drawn from Indian
Bank. |
|
53.358 |
- |
Loans drawn from Bank of
Rajasthan. |
|
53.359 |
- |
Loans drawn from Punjab
and Sind bank |
|
53.360 |
- |
Loans drawn from Canara
Bank |
|
53.400 |
- |
Loans from NABARD |
|
53.500 |
- |
Loans from Commercial
Banks for S.P.A. schemes |
|
53.600 |
- |
Inventory loan from REC |
|
53.700 |
- |
Loan from REC for SPA
Scheme |
|
53.800 |
- |
Loan from HUDCO |
|
53.888 |
- |
Payments due on Capital
Liabilities Capital Liabilities(Other than State Government Loans) – Contra Account |
|
53.900 |
- |
Loan from HDFC |
|
53.950 |
- |
Loan from IDBI |
|
53.951 |
- |
Loans from SIDBI |
|
53.960 |
- |
Loan from Power Finance
Corporation Ltd., |
|
53.970 |
- |
Loan from KIADB |
|
53.998 |
- |
Loans of KPTCL parked
with GOK |
|
53.999 |
- |
Pooled Loan Account |
|
54.000 |
- |
Funds
from State Government |
|
54.200 |
- |
State Govt Loans |
|
54.300 |
- |
Amount Received
from State Govt, for Repayments Guaranteed |
|
54.400 |
- |
Amount Received
from State Govt for Interest Guaranteed |
|
54.888 |
- |
Funds from State
Government – Contra Account |
|
55.000 |
- |
Contributions,
Grants and Subsidies towards Cost of Capital Assets |
|
55.100 |
- |
Consumers’ Contribution
towards Cost of Capital Assets. |
|
55.101 |
- |
Augmentation charges
collected from consumers |
|
55.112 |
- |
Capital receipts
collected from independent IPPs towards reactive power compensation works |
|
55.200 |
- |
Subsidies towards Cost of
Capital Assets. |
|
55.300 |
- |
Grants towards cost of
Capital Assets. |
|
55.301 |
- |
Special Grant towards
Capital Works under Accelerated power Development Programme(APRDP) |
|
55.302 |
- |
Special Grant towards
Capital works under APRDP |
|
55.303 |
- |
Special Grant received
from GOI towards Pradhan Manthri Gramodaya Yojana works. |
|
55.304 |
- |
APDRP Grant Disbursable
Account – BESCOM |
|
55.305 |
- |
APDRP Grant Disbursable
Account – MESCOM |
|
55.306 |
- |
APDRP Grant Disbursable
Account – HESCOM |
|
55.307 |
- |
APDRP Grant Disbursable
Account – GESCOM |
|
55.308 |
- |
APDRP grant disbursable
account CESCO |
|
55.309 |
- |
Special Grant received
from GOK towards Floods Relief Works |
|
55.500 |
- |
Special Grant towards
Capital works |
|
55.888 |
- |
Contribution, Grants and
Subsidies - Contra Account |
|
56.000 |
- |
Reserves |
|
56.100 |
- |
General Reserve |
|
56.200 |
- |
Capital Reserve |
|
56.201 |
- |
Capital Reserve – Capital
Receipts |
|
56.202 |
- |
Capital Reserve –
Encashment of Bank Guarantee |
|
56.300 |
- |
Sinking Fund for
repayment of borrowings |
|
56.400 |
- |
Investment
Allowance Reserve |
|
56.410 |
- |
Investment Allowance
Reserve |
|
56.450 |
- |
Investment Allowance Reserve
inaliza. |
|
56.600 |
- |
Other Reserves |
|
56.610 |
- |
Reserve for Material Cost
Variance. |
|
56.620 |
- |
Taxation Reserve |
|
56.640 |
- |
Reserve for power
purchase related contingent liability |
|
56.888 |
- |
Reserves- Contra Account |
|
57.000 |
- |
Reserve
Funds |
|
57.130 |
- |
Gratuity Fund |
|
57.140 |
- |
Staff Pension Fund |
|
57.150 |
- |
Staff Welfare Fund(Family
benefit Fund) |
|
57.200 |
- |
Development Fund |
|
57.888 |
- |
Reserve Funds- Contra
Account |
|
58.000 |
- |
Surplus |
|
58.100 |
- |
Revenue Account |
|
58.200 |
- |
Net Revenue &
Appropriation Account |
|
58.210 |
- |
Net Revenue & Appropriation Account |
|
58.220 |
- |
APPROPRIATIONS OF
SURPLUS/ CONTRIBUTION TO RESERVES / RESERVE FUNDS |
|
58.221 |
- |
Contribution to Sinking
fund for repayment of borrowings |
|
58.222 |
- |
Contribution to General
Reserve |
|
58.223 |
- |
Contribution to
investment allowance reserve |
|
58.300 |
- |
Net of Income and
Expenditure for The Year |
|
58.400 |
- |
Part – B difference to be
transferred to Net Revenue and Appropriation Account |
|
58.888 |
- |
Surplus- Contra Account |
|
61.000 |
- |
Revenue
From Sale Of Bulk Power(KPTCL) |
|
61.200 |
- |
Revenue from Sale
of Bulk Power– Escoms |
|
61.201 |
- |
Revenue from sale of bulk
power – BESCOM |
|
61.202 |
- |
Revenue from sale of bulk
power – MESCOM |
|
61.203 |
- |
Revenue from sale of bulk
power – HESCOM |
|
61.204 |
- |
Revenue from sale of bulk
power – GESCOM |
|
61.205 |
- |
Revenue from Sale of Bulk
power– Hukkeri Electricity Co-operative Society |
|
61.206 |
- |
Revenue from Sale of
power to Hukkeri Electric Co-operative Society Ltd – GOK’s contribution |
|
61.207 |
- |
Revenue from Sale of Bulk
power– CESCO |
|
61.211 |
- |
Transmission Charges-
BESCOM |
|
61.212 |
- |
Transmission Charges-
MESCOM. |
|
61.213 |
- |
Transmission Charges-
HESCOM. |
|
61.214 |
- |
Transmission Charges-
GESCOM |
|
61.215 |
- |
Transmission Charges-
Hukkeri Co-Operative Society. |
|
61.217 |
- |
Transmission Charges-
CESCO |
|
61.218 |
- |
Transmission charges and
System Operating Charges on STOA customers |
|
61.219 |
- |
Transmission Service
Charges – Hukkeri Electric Co-operative Society. |
|
61.220 |
- |
Transmission Charges and
System Operating charges on MTOA customers. |
|
61.300 |
- |
Revenue from Sale
of Power – Inter State Consumers |
|
61.301 |
- |
Revenue from Sale of
Power – TNEB |
|
61.302 |
- |
Revenue from Sale of
Power – KSEB |
|
61.303 |
- |
Revenue from Sale of
Power – MSEB. |
|
61.304 |
- |
Revenue from Sale of
Power – APTRANSCO |
|
61.305 |
- |
Revenue from Sale of
Power – Goa. |
|
61.306 |
- |
Revenue from sale of
power-WREB |
|
61.307 |
- |
Revenue from Sale of
power – Gujarath Electricity Board |
|
61.308 |
- |
Revenue from Sale of
power – Chatisgarh State Electricity Board |
|
61.309 |
- |
Revenue from Sale of
power – Madhya Pradesh Electricity Board |
|
61.800 |
- |
Wheeling Charges
Recoveries |
|
61.801 |
- |
Wheeling Charges
preferred on IPPs utilizing transmission / Distribution Network for wheeling
of power |
|
61.802 |
- |
Wheeling charges – Open
Access Customers. |
|
61.888 |
- |
Revenue from Sale of Bulk
Power- Contra Account |
|
61.900 |
- |
Miscellaneous
Charges |
|
61.906 |
- |
Other receipts |
|
61.911 |
- |
Delayed payment charges
from BESCOM |
|
61.912 |
- |
Delayed payment charges
from MESCOM |
|
61.913 |
- |
Delayed payment charges
from HESCOM |
|
61.914 |
- |
Delayed payment charges
from GESCOM |
|
61.915 |
- |
Delayed payment charges
recovered from Hukkeri Electricity co-operative Society |
|
61.916 |
- |
Delayed payment of
Network Charges from IPPs. |
|
61.917 |
- |
Delayed payment charges
from CESCO |
|
61.918 |
- |
Miscellaneous charges
collected from Open Access Customers |
|
61.919 |
- |
UI charges – Open Access
Customers |
|
61.000 |
- |
Revenue
From Sale Of Power(ESCOMS) |
|
61.100 |
- |
Revenue From Sale
Of Power(ESCOMS) - LT |
|
61.101 |
- |
Revenue from sale of
Power - LT1M |
|
61.102 |
- |
Revenue from sale of
Power - LT1UM |
|
61.103 |
- |
Revenue from sale of
Power - LT1>40 |
|
61.111 |
- |
Revenue from sale of
Power - LT2A1 |
|
61.112 |
- |
Revenue from sale of
Power - LT2A2 |
|
61.114 |
- |
Revenue from sale of
Power - LT2A FL |
|
61.115 |
- |
Revenue from sale of
Power - LT2B1 |
|
61.116 |
- |
Revenue from sale of
Power - LT2B2 |
|
61.131 |
- |
Revenue from sale of
Power - LT3A1 |
|
61.132 |
- |
Revenue from sale of
Power - LT3A2 |
|
61.133 |
- |
Revenue from sale of
Power - LT3A OL |
|
61.141 |
- |
Revenue from sale of
Power - LT4A |
|
61.144 |
- |
Revenue from sale of
Power - LT4B |
|
61.145 |
- |
Revenue from sale of
Power - LT4C1 |
|
61.147 |
- |
Revenue from sale of
Power - LT4C2 |
|
61.151 |
- |
Revenue from sale of
Power - LT5A0-5 |
|
61.152 |
- |
Revenue from sale of
Power - LT5A6-40 |
|
61.153 |
- |
Revenue from sale of
Power - LT5A41-67 |
|
61.154 |
- |
Revenue from sale of
Power - LT5A>67 |
|
61.159 |
- |
Revenue from sale of
Power - LT5A>100 |
|
61.155 |
- |
Revenue from sale of
Power - LT5B0-5 |
|
61.156 |
- |
Revenue from sale of
Power - LT5B6-40 |
|
61.157 |
- |
Revenue from sale of
Power - LT5B41-67 |
|
61.158 |
- |
Revenue from sale of
Power - LT5B>67 |
|
61.160 |
- |
Revenue from sale of
Power - LT5B>100 |
|
61.171 |
- |
Revenue from sale of
Power - LT6A |
|
61.172 |
- |
Revenue from sale of
Power - LT6B |
|
61.184 |
- |
Revenue from sale of
Power - LT6C |
|
61.181 |
- |
Revenue from sale of
Power - LT7A |
|
61.182 |
- |
Revenue from sale of
Power - LT7B |
|
61.183 |
- |
Revenue from sale of
Power - LT7A Prepaid |
|
61.200 |
- |
Revenue From Sale
Of Power(ESCOMS) - HT |
|
61.250 |
- |
Revenue from sale of Power
- HT1 |
|
61.260 |
- |
Revenue from sale of
Power - HT2A1 |
|
61.261 |
- |
Revenue from sale of
Power - HT2A2 |
|
61.263 |
- |
Revenue from sale of
Power - HT2C1 |
|
61.264 |
- |
Revenue from sale of
Power - HT2C2 |
|
61.270 |
- |
Revenue from sale of
Power - HT2B1 |
|
61.273 |
- |
Revenue from sale of
Power - HT2B2 |
|
61.280 |
- |
Revenue from sale of
Power - HT3A1 |
|
61.281 |
- |
Revenue from sale of
Power - HT3A2 |
|
61.289 |
- |
Revenue from sale of
Power - HT3A3 |
|
61.282 |
- |
Revenue from sale of
Power - HT3B |
|
61.290 |
- |
Revenue from sale of
Power - HT4 |
|
61.293 |
- |
Revenue from sale of
Power - HT5A |
|
62.000 |
- |
Other
Income |
|
62.200 |
- |
Income from Loans,
Advances, Investments etc |
|
62.210 |
- |
Interest on Loans and
Advance drawn by staff – House Building / Purchase / Enlargement |
|
62.211 |
- |
Interest on loans and
advances drawn by staff – Purchase of 2 wheelers |
|
62.212 |
- |
Interest on Loans and
Advance drawn by staff for performance of Marriage |
|
62.213 |
- |
Interest on Loans and
Advance drawn by staff- Purchase of Computer |
|
62.214 |
- |
Interest on loans and
advances drawn by staff - Purchase of 4 wheelers |
|
62.220 |
- |
INCOME FROM INVESTMENTS |
|
62.221 |
- |
Interest on securities. |
|
62.222 |
- |
Interest on Bank Fixed
Deposits |
|
62.223 |
- |
Interest on Bonds /
Debentures of other Electricity Boards |
|
62.224 |
- |
Interest on other
Investments. |
|
62.240 |
- |
Interest on loan and
advances to Licencees |
|
62.260 |
- |
Interest on Advances to Suppliers/
Contractors |
|
62.270 |
- |
Interest from Banks. |
|
62.280 |
- |
Interest on loans Societies |
|
62.300 |
- |
Income from Trading |
|
62.321 |
- |
Profit on sale of
Electrical plant manufactured by the Corporation |
|
62.322 |
- |
Profit on sale, hire
purchase or hire of apparatus / wiring(profit after deducting cost from the
sale proceeds) |
|
62.323 |
- |
Hire charges from
Contractors |
|
62.330 |
- |
Profit on sale of
stores(Profit after deducting cost from the sale proceeds) |
|
62.340 |
- |
Sale of scrap(sale
proceeds since no cost is assigned to scrap) |
|
62.360 |
- |
Other Miscellaneous
receipts from Trading |
|
62.361 |
- |
Reactive Energy charges
demanded on IPPs |
|
62.362 |
- |
Revenue from IPPs for
excess drawal of Energy from KPTCL’s Grid. |
|
62.363 |
- |
Open Access processing
Fee. |
|
62.364 |
- |
Reactive Power charges
demanded on Open Access Customers |
|
62.365 |
- |
Meter Rental charges
demanded on Open Access Customers |
|
62.400 |
- |
Gain on Sale of
Fixed Assets |
|
62.600 |
- |
Income / Fees/
Collections Against Staff Welfare Activities |
|
62.620 |
- |
Fees from Library Members |
|
62.630 |
- |
Recoveries for Transport
Facilities |
|
62.888 |
- |
Other Income - Contra
Account |
|
62.900 |
- |
Miscellaneous
Receipts |
|
62.901 |
- |
Rental from Staff
Quarters |
|
62.902 |
- |
Rental from others |
|
62.903 |
- |
Leave Contribution |
|
62.904 |
- |
Excess found on physical
verification of Cash |
|
62.905 |
- |
Excess found on physical
verification of Materials Stock. |
|
62.906 |
- |
Excess found on physical
verification of Fixed Assets. |
|
62.907 |
- |
Supervision Charges. |
|
62.908 |
- |
Other Receipts. |
|
62.909 |
- |
Supervision Charges
collected on Self Execution Works |
|
62.910 |
- |
Recovery for Transport
and vehicle expenses(other than recoveries from staff) |
|
62.912 |
- |
Sundry credit balance
written back |
|
62.917 |
- |
Miscellaneous Recoveries. |
|
62.918 |
- |
Incentives received |
|
62.919 |
- |
Processing Fee collected
towards inalization of evacuation proposals N.C.E projects |
|
62.920 |
- |
Processing Fee collected
towards inalization of evacuation proposals – C.E Projects |
|
62.921 |
- |
Processing and execution
charges collected from ESCOMs – New 33Kv lines and Stations |
|
62.922 |
- |
Consultancy Charges |
|
62.923 |
- |
Excess provision made in
earlier years no longer required |
|
62.925 |
- |
Rental from BESCOM |
|
62.926 |
- |
Rental from MESCOM |
|
62.927 |
- |
Rental from HESCOM |
|
62.928 |
- |
Rental from GESCOM |
|
62.929 |
- |
Rental from CESCO |
|
62.999 |
- |
Excess provision made
towards power purchase expenditure in previous years crystalised and
withdrawn during the year |
|
63.000 |
- |
Subsidies
and Grants |
|
63.100 |
- |
Revenue Subsidies
and Grants |
|
63.110 |
- |
R.E. Subsidies |
|
63.120 |
- |
Grant for Research and
Development Expenses |
|
63.121 |
- |
Grant for Research and
Development Expenses-RSOP |
|
63.130 |
- |
Grant-in aid for Survey
and Investigation |
|
63.141 |
- |
Assistance for special
component plan |
|
63.200 |
- |
Subsidies Against
Loss on Account of Flood, Fire, Cyclone etc, |
|
63.888 |
- |
Subsidies and Grants-
Contra Account |
|
65.000 |
- |
Prior
Period Income |
|
65.200 |
- |
Receipts from Consumers
Relating to Prior periods |
|
65.400 |
- |
Interest Income for
Prior Periods |
|
65.500 |
- |
Excess Provision
for Income Tax in Prior Periods |
|
65.600 |
- |
Excess Provision
for Depreciation in Prior Periods |
|
65.700 |
- |
Excess Provision
for Interest and Finance Charges in Prior Periods |
|
65.800 |
- |
Other Excess
Provision in Prior Periods |
|
65.888 |
- |
Prior period Income-
Contra Account |
|
65.900 |
- |
Other Income
Relating to Prior Periods |
|
70.000 |
- |
Power
Purchase Account |
|
70.101 |
- |
Power purchased from
Tamil Nadu Electricity Board. |
|
70.102 |
- |
Power purchased from
Kerala State Electricity Board |
|
70.103 |
- |
Power purchased from
Maharashtra State Electricity Board |
|
70.104 |
- |
Power purchased from
Andhra Pradesh Transmission Company |
|
70.105 |
- |
Power purchased from
Pondichery Electricity Board |
|
70.106 |
- |
Power purchased from Goa
Electricity Board |
|
70.107 |
- |
Power purchased from
GRIDCO |
|
70.108 |
- |
Power purchased from KPCL |
|
70.109 |
- |
Power purchased from VVNL |
|
70.110 |
- |
Power purchased from
NTPC- RSTP |
|
70.111 |
- |
Power purchased from MAPS |
|
70.112 |
- |
Power purchased from NLC |
|
70.113 |
- |
Power purchased from
PGCIL |
|
70.114 |
- |
Power purchased from
KAIGA |
|
70.115 |
- |
Power purchased from WREB |
|
70.116 |
- |
Power purchased from NTPC
– ER |
|
70.117 |
- |
Power purchased from
PTCIL |
|
70.118 |
- |
Power purchased from ITPL |
|
70.119 |
- |
Power purchased from Ugar
Sugars Works Ltd Co generation Plant , Ugar |
|
70.120 |
- |
Power purchased from
SMIORE |
|
70.121 |
- |
Power purchased from
Energy Development Co Ltd. |
|
70.122 |
- |
Power purchased from
Bhoruka Power Corporation Ltd |
|
70.123 |
- |
Power purchased from
Murudeshwar Power Corporation Ltd |
|
70.124 |
- |
Power purchased from
Shamanur Sugar Ltd. |
|
70.125 |
- |
Power purchased from –
JTPCL |
|
70.126 |
- |
Power purchased from
Shree Renuka Sugars Ltd |
|
70.127 |
- |
Power purchased from
Bannari Amman Sugars |
|
70.128 |
- |
Power purchased from ICL
Sugars |
|
70.129 |
- |
Power purchased from
Rayalaseema Alkalies |
|
70.130 |
- |
Power purchased from
Prabhulingeshwar |
|
70.131 |
- |
Power purchased from Tata
Company Ltd., |
|
70.132 |
- |
Power purchased from
South India Paper Mills Ltd., |
|
70.133 |
- |
Power purchased from
Tannir Bhavi Company Ltd., |
|
70.134 |
- |
Power purchased from
Amoga Power Project Ltd., |
|
70.135 |
- |
Power purchased from
Dandeli Steel & Ferro Alloys Ltd., |
|
70.136 |
- |
Power purchased from
Malavalli Power Plant Pvt. Ltd. |
|
70.137 |
- |
Power purchased from
Nuziveedu Seeds Ltd. |
|
70.138 |
- |
Power purchased from
Atria Power Corporation Ltd., |
|
70.139 |
- |
Power purchased from
Raythara S.S.K.N. |
|
70.140 |
- |
Power purchased from
Vishwanath Sugars Ltd., |
|
70.141 |
- |
Power purchased from Sri
Dodda Ganga Krishna Ltd. |
|
70.142 |
- |
Power purchased from
Dodda Moodalabaagilu Power Ltd., |
|
70.143 |
- |
Power purchased from Arun
Engineering |
|
70.144 |
- |
Power purchased from
Globe Generating Power Ltd., |
|
70.145 |
- |
Power purchased from
Atria Brundavan Power Ltd. |
|
70.146 |
- |
Power purchased from
Chamundeshwari Sugars Ltd. |
|
70.147 |
- |
Power purchased from
Subash Kabini Power Company Ltd. |
|
70.148 |
- |
Power purchased from
Thungabhadra Steel Products |
|
70.149 |
- |
Power purchased from
Enercon Wind Farms India Ltd., |
|
70.150 |
- |
Power purchased from
Topaz Investment Pvt. Ltd. |
|
70.151 |
- |
Power purchased from
Cepco Industries Pvt. Ltd., |
|
70.152 |
- |
Power purchased from BSES |
|
70.153 |
- |
Power purchased from
Jamkhandi Sugar Ltd., |
|
70.154 |
- |
Power purchased from
Godavari Sugar Ltd., |
|
70.155 |
- |
Power purchased from –
Gujarath Electricity Board |
|
70.156 |
- |
Power purchased from – Chattisgarh
State Electricity Board |
|
70.157 |
- |
Power purchased from –
Madhya Pradesh Electricity Board |
|
70.158 |
- |
Power purchased from –
Vijayalakshmi Hydro power Pvt Ltd |
|
70.159 |
- |
Power purchased from
Modabagilu Power (Pvt) Ltd |
|
70.160 |
- |
Power purchased from Gem
Sugars Ltd |
|
70.161 |
- |
Power purchased from
Prabhat Agri Bio Tech |
|
70.162 |
- |
Unscheduled interchange
(UI) Charges to PGCIL-SREB |
|
70.163 |
- |
Power purchased from
Suttatti Enterprises Ltd. |
|
70.164 |
- |
Power purchased from VXL
Systems # II |
|
70.165 |
- |
Power purchased from Raja
Magnetics Ltd. |
|
70.166 |
- |
Power purchased from
Mayura Steels Pvt. Ltd. |
|
70.167 |
- |
Power purchased from
Friends Associate Power Project |
|
70.168 |
- |
Power purchased from
Texmo Precision Castings |
|
70.169 |
- |
Power purchased from RSM
Autokast Ltd. |
|
70.170 |
- |
Power purchased from
Patel Shanti Steels Pvt. Ltd |
|
70.171 |
- |
Power purchased from BSES
Ltd (1.8MW) |
|
70.172 |
- |
Power purchased from
Shilpa Antibiotics Ltd. |
|
70.173 |
- |
Power purchased from –
Indan Energy Pvt. Ltd |
|
70.174 |
- |
Power purchased from
Savita Chemicals Ltd. |
|
70.175 |
- |
Power purchased from
Elveety Industries Pvt. Ltd. |
|
70.176 |
- |
Power purchased from VXL
Systems #I |
|
70.177 |
- |
Power purchased from
Siddaganga Oil Extractions Ltd. |
|
70.178 |
- |
Power purchased from
Sharp Pumps Pvt. Ltd |
|
70.179 |
- |
Power purchased from
Rajanikanth Foundation |
|
70.180 |
- |
Power purchased from
Panama Business Centre |
|
70.181 |
- |
Power purchased from Fiza
Developers & Inter Trade. |
|
70.182 |
- |
Power purchased from
Kamal Trading Co. |
|
70.183 |
- |
Power purchased from
Maruthi Power Gen (I) Pvt. Ltd. |
|
70.184 |
- |
Power purchased from
Jindal Aluminium Ltd. |
|
70.185 |
- |
Power purchased from
Shilpa Medicate Ltd. |
|
70.186 |
- |
Power purchased from
Cepco Industries Ltd (0.60 MW) |
|
70.187 |
- |
Power purchased from MSPL
Ltd |
|
70.188 |
- |
Power purchased from NLC
TPS Expansion I & II |
|
70.189 |
- |
Power purchased from NTPC
Talcher Stage II |
|
70.190 |
- |
Power purchased from
Kalson Power Tech. Ltd |
|
70.191 |
- |
Power purchased from
Balsaheb M. Ladkat |
|
70.192 |
- |
Power purchased from
Sanjay D. Ghodawat (HUF) |
|
70.193 |
- |
Power purchased from
Topaz Investment Ltd. (1.2 MW) |
|
70.194 |
- |
Power purchased from
Ghodwat Pan Masala |
|
70.195 |
- |
Power purchased from
Nuziveedu Seeds Ltd. (1.9 MW) |
|
70.196 |
- |
Power purchased from
Shriram Investment Ltd. |
|
70.197 |
- |
Power purchased from
Texmo Industries. |
|
70.198 |
- |
Power purchased from
Shriram City Union Finance Ltd. |
|
70.199 |
- |
Power purchased from
Shriram Transport Finance Ltd. |
|
70.200 |
- |
Power purchased from.
Lovely Fragrance. |
|
70.201 |
- |
Power purchased from JN
Investments. |
|
70.202 |
- |
Power purchased from
Enercon (Karnataka) Wind Farm (21MW). |
|
70.203 |
- |
Power purchased from
Mohite & Mohite Pvt. Ltd. |
|
70.204 |
- |
Power purchased from
Panama Credit & Capital Pvt. Ltd. |
|
70.205 |
- |
Power purchased from
Shilpa Medicare Ltd. |
|
70.206 |
- |
L.C. Charges / Other Bank
Commission paid for purchase of power. |
|
70.207 |
- |
Power purchased from
Jindal Aluminum- 6.6 MW |
|
70.208 |
- |
Power purchased from
Graphite India Limited-1.5 MW |
|
70.209 |
- |
Power purchased from MSPL
Ltd.– Phase II – 4.75 MW |
|
70.210 |
- |
Power purchased from
Ramghad Mining – 1.9 MW |
|
70.211 |
- |
Power purchased from
Ghodawat Panmasala Products (Nandan Hosur Group) – 5.4 MW |
|
70.212 |
- |
Power purchased from
International Power Corporation Ltd. – 2.4 MW |
|
70.213 |
- |
Power purchased from
Encon Service Ltd. – 3 MW |
|
70.214 |
- |
Power purchased from NEG
Micon Pvt. Ltd. – 3.8 MW |
|
70.215 |
- |
Power purchased from
Pallavi Green Power – 0.75 MW |
|
70.216 |
- |
Power purchased from
Mansukhmal Investments – 0.95 MW |
|
70.217 |
- |
Power purchased from
Bhoruka Power Corporation Limited (Shapura D9)-1 MW |
|
70.218 |
- |
Power purchased from Dee
Dee Enterprises (Nandan Hosur) – 0.6 MW |
|
70.219 |
- |
Power purchased from
Bhagyanagar Solvent Extractions Ltd-5.4 MW |
|
70.220 |
- |
Power purchased from
Supreme Power Company-0.6 MW |
|
70.221 |
- |
Power purchased from
Royal Energy Company-0.6 MW |
|
70.222 |
- |
Power purchased from
Prime Lables Company-0.25 MW |
|
70.223 |
- |
Power purchased from
R.K.Power Gen Pvt Ltd-20 MW |
|
70.224 |
- |
Power purchased from
Maruthi Power Gen Pvt Ltd (Hemavathy Project)-1.5 MW |
|
70.225 |
- |
Power purchased from
Nuziveedu Seeds Ltd (NSL-V)-1.9 MW |
|
70.226 |
- |
Power purchased from
Nuziveedu Seeds Ltd (NSL-II & III ) -10.5 MW |
|
70.227 |
- |
Power purchased from Mahe
Ltd- 0.25 MW |
|
70.228 |
- |
Power Purchased from
Davangere Sugar Co. Ltd (20 MW) |
|
70.229 |
- |
Power Purchased from
Goetz (I) Financial Ltd.(9.6MW) |
|
70.230 |
- |
Power Purchased from
Sanjay .D. Ghodawat (I & II) |
|
70.231 |
- |
Power Purchased from
Channabasappa & Sons (0.60 MW) |
|
70.232 |
- |
Power Purchased from
Associate Autotex Ancillaries Pvt. Ltd (1.20 MW) |
|
70.233 |
- |
Power Purchased from
Goodluck Syndicate (0.60 MW) |
|
70.234 |
- |
Power Purchased from
Godawat Pan Masala – 4.2 MW |
|
70.235 |
- |
Power Purchased from
Shreya Laxmi Properties (0.60 MW) |
|
70.236 |
- |
Power Purchased from
Shraddha Constructions (6.60 MW) |
|
70.237 |
- |
Power Purchased from VXL
Systems (0.60 MW) |
|
70.238 |
- |
Power Purchased from
Cepco Insustries – 1.2 MW |
|
70.239 |
- |
Power Purchased from Dee
Dee Enterprises (EG) (0.60MW) |
|
70.240 |
- |
Power Purchased from
Samson Distillers Pvt. Ltd.(2 MW) |
|
70.241 |
- |
Power Purchased from Star
Flexi Pack Industries.(0.60 MW) |
|
70.242 |
- |
Power Purchased from
Savitha Chemicals (Encon Group) (0.75 MW) |
|
70.243 |
- |
Power purchased from
–B.S.C Textiles (VVS) (0.6 MWs) |
|
70.244 |
- |
Power purchased from –SCM
Sugars Ltd.(26 MWs) |
|
70.245 |
- |
Power purchased from –Sri
Indra Power Energies Ltd. |
|
70.246 |
- |
Power purchased from
–Madras Cements Ltd. (VVS) – (0.6 MWs). |
|
70.247 |
- |
Power purchased from
–Suresh Productions Private Limited– (0.75 MWs). |
|
70.248 |
- |
Power purchased from –
Sanghvi Movers Ltd. (0.75 MWs) |
|
70.249 |
- |
Power purchased from
–Eswari Garments (1.5 MWs) |
|
70.250 |
- |
Power purchased from
–Eswari Knitting Works – (3MWs) |
|
70.251 |
- |
Power purchased from –
Eswari Textiles (3 MWs). |
|
70.252 |
- |
Power purchased from –
Victus Associate (1.5 MWs). |
|
70.253 |
- |
Power purchased from –
Shree Doodhganga Krishna Sahakari Karkhane Niyamit – (24 MWs) |
|
70.254 |
- |
Power purchased from
–Kariganur Iron & Steel (P) Ltd. – (0.75 Mws) |
|
70.255 |
- |
Power purchased from –
Deefree Engineering (P) Ltd.- (0.6 MWs) |
|
70.256 |
- |
Power purchased from
Poweronicks Ltd (5.4 MWs) |
|
70.257 |
- |
Power purchased from NCL
Energy Ltd (8.25 MWs) |
|
70.258 |
- |
Power purchased from SLS
Power Industries Ltd (4.5 MWs) |
|
70.259 |
- |
Power purchased from
Venkateshwara Power Project Ltd (10 MWs) |
|
70.260 |
- |
Power purchased from
Sahyadri Power Co. (P) Ltd (0.4 Mws) |
|
70.261 |
- |
Power purchased from
Koppal Green Power (6 MWs) |
|
70.262 |
- |
Power purchased from
Meghana Automotives (VVS-20) (0.6 MWs) |
|
70.263 |
- |
Power purchased from P.
Vijaya Kumar (VVS-22) (0.6 MWs) |
|
70.264 |
- |
Power purchased from P.
Mohan Lal (VVS-23) (0.6 MWs) |
|
70.265 |
- |
Power purchased from
Primetex Apparels (VVS-24) (0.6 MWs) |
|
70.266 |
- |
Power purchased from
Laxmi Organics (VVS-25) (1.2 MWs) |
|
70.267 |
- |
Power purchased from
Cooper Foundry (VVS-26) (2.4 MWs) |
|
70.268 |
- |
Power purchased from
Madeo Soaps (VVS-27) (6.0 MWs) |
|
70.269 |
- |
Power purchased from
Mineral Enterprises (VVS-28) (3.0 MWs) |
|
70.270 |
- |
Power purchased from
World Institute of Sustain Energy (VVS- 29) (3.0 MWs) |
|
70.271 |
- |
Power purchased from
Rajesh Constructions (Suzlon Group) (2.5 MWs) |
|
70.272 |
- |
Power purchased from
Ferromar Shipping (P) Ltd (1.25 MWs) |
|
70.273 |
- |
Power purchased from G.M.
Aggrawal (Suzlon Group) (2.5 MWs) |
|
70.274 |
- |
Power purchased from Sai
Spurthi Power (P) Ltd (10.2 MWs) |
|
70.275 |
- |
Power purchased from
Unnathi Projects (VVS-30) |
|
70.276 |
- |
Power purchased from
Jitendra D Majethia (VVS- 31) |
|
70.277 |
- |
Power purchased from
Brindavan Agro Industries (VVS – 33) |
|
70.278 |
- |
Power purchased from GEM
Crafts (VVS –34) |
|
70.279 |
- |
Power purchased from
S.E.Investments Ltd. (VVS–35) |
|
70.280 |
- |
Power purchased from
Sanjana Power (VVS- 37) |
|
70.281 |
- |
Power purchased from
International Conveyers (VVS- 38) |
|
70.282 |
- |
Power purchased from
Swaraj PVC Pipes Ltd (VVS –39) |
|
70.283 |
- |
Power purchased from
I.G.L India Ltd. (VVS –40) |
|
70.284 |
- |
Power purchased from
Amrita Bottlers (P) Ltd (VVS –42) |
|
70.285 |
- |
Power purchased from M.K.
Agrotech (P) Ltd (VVS-43) |
|
70.286 |
- |
Power purchased from
Abhishek Exports |
|
70.287 |
- |
Power purchased from
Amitronics Ltd |
|
70.288 |
- |
Power purchased from
Sanjana Gryogenics |
|
70.289 |
- |
Power purchased from
Navalakha Translines |
|
70.290 |
- |
Power purchased from
Mantri Developers |
|
70.291 |
- |
Power purchased from
Jivraj Tea |
|
70.292 |
- |
Power purchased from
K.R.E.D.L. |
|
70.293 |
- |
Power purchased from
Enercon (Krishna) Wind Farms. |
|
70.294 |
- |
Power purchased from M/s.
Konark Power Project Limited |
|
70.295 |
- |
Power purchased from M/s
Naranja Sahakari Sakkare Karkhane Niyamit. |
|
70.296 |
- |
Power purchased from
Bellary Iron Ores Private Limited |
|
70.297 |
- |
Power purchased from
Sanmathi Power Company |
|
70.298 |
- |
Power purchased from P
Venganashetty & Sons |
|
70.299 |
- |
Power purchased from
Ravikiran Power Project |
|
70.301 |
- |
Power purchased from M/s
Mysore Paper Mills Limited |
|
70.400 |
- |
Wheeling Charges payable |
|
70.700 |
- |
Cost of Banked Energy |
|
70.800 |
- |
Unscheduled interchange
Changes (due to KPTCL) from PGCIL-SREB |
|
70.888 |
- |
Power Purchase Account-
Contra Account |
|
70.900 |
- |
Power Cost charged to
Capital Works |
|
71.000 |
- |
Cost of
Generation of Power |
|
71.153 |
- |
20% Share of Generating
Cost – TBHE Board |
|
71.888 |
- |
Cost of Generation of
Power- Contra Account |
|
74.000 |
- |
Repairs
and Maintenance |
|
74.100 |
- |
Repairs and
Maintenance to Plant and Machinery |
|
74.101 |
- |
R & M to Plant &
Machinery – R.T. |
|
74.103 |
- |
R & M to Plant &
Machinery - R & D |
|
74.104 |
- |
R & M to Plant &
Machinery – Telecommunication. |
|
74.105 |
- |
R&M- Disaster
Management |
|
74.110 |
- |
R & M to Plant &
Machinery – Others. |
|
74.116 |
- |
R & M Expenses to
Power Transformers |
|
74.118 |
- |
Remuneration to Private
Contractors engaged for shift and minor maintenance duties of Stations/MUSS. |
|
74.200 |
- |
Repairs &
Maintenance to Buildings |
|
74.210 |
- |
R & M to Residential
Quarters |
|
74.220 |
- |
R & M to Other
Buildings |
|
74.221 |
- |
R & M to Guest
Houses. |
|
74.300 |
- |
Repairs & Maintenance
to Civil Works |
|
74.302 |
- |
Formation and maintenance
of Horticulture Works |
|
74.400 |
- |
Repairs & Maintenance to
Hydraulic Works. |
|
74.401 |
- |
R & M Hydraulic Works – Generation |
|
74.500 |
- |
Repairs &
Maintenance to Lines Cable Network, etc, |
|
74.510 |
- |
R & M to Lines Cable
network etc., |
|
74.511 |
- |
Temporary Power Supply
Cost absorbed |
|
74.512 |
- |
Charges for Restoration
of System in Emergencies by temporary alternate arrangements. |
|
74.518 |
- |
Maintenance Charges paid
to PGCIL in respect of Transmission Lines. |
|
74.600 |
- |
Repairs &
Maintenance to Vehicles |
|
74.601 |
- |
R & M to vehicles |
|
74.700 |
- |
Repairs &
Maintenance to Furniture & Fixtures |
|
74.701 |
- |
R & M to Furniture
and Fixtures |
|
74.800 |
- |
Repairs &
Maintenance to Office Equipment |
|
74.801 |
- |
R & M of Office
Equipment |
|
74.802 |
- |
Repairs to Computers
& Printers |
|
74.803 |
- |
AMC charges for EMS/
SCADA portion under ULDC Scheme |
|
74.888 |
- |
Repairs and maintenance-
Contra Account |
|
74.900 |
- |
Repairs &
Maintenance Charged to Capital Works(Credit A/c) |
|
74.910 |
- |
Repair & Maintenance
expenses allocable to ESCOMs(Credit account) |
|
75.000 |
- |
Employee
Cost |
|
75.100 |
- |
Salaries |
|
75.110 |
- |
Salaries – Regular
Employees – Relay Testing |
|
75.114 |
- |
Salaries – Regular
Employees – Stores |
|
75.115 |
- |
Salaries – Regular
Employees – Others |
|
75.117 |
- |
Salaries – Regular
Employees – Employees covered under Contributory Pension Scheme. |
|
75.150 |
- |
Salaries – Casual Labour
– Relay Testing |
|
75.154 |
- |
Salaries – Casual Labour
– Stores |
|
75.155 |
- |
Salaries – Casual Labour
–Others |
|
75.156 |
- |
Salaries – Contract A.E
/J.E |
|
75.170 |
- |
Salaries- Trainees /
Apprentices |
|
75.171 |
- |
Salaries – Corporation
Trainees |
|
75.172 |
- |
Salaries – Government
Trainees |
|
75.180 |
- |
Dearness Pay – Regular
Employees – Relay Testing |
|
75.182 |
- |
Dearness Pay – Regular
Employees – Research |
|
75.183 |
- |
Dearness Pay – Regular
Employees – Workshop & RCC Centre. |
|
75.184 |
- |
Dearness Pay – Regular
Employees – Stores. |
|
75.185 |
- |
Dearness Pay – Regular
Employees – Others. |
|
75.187 |
- |
Dearness Pay - Regular
Employees – Employees covered under Contributory Pension Scheme |
|
75.188 |
- |
Interim Relief – Pay
Scale revision 2010-Employees recruited prior to 01.04.2006 |
|
75.189 |
- |
Interim Relief – Pay
Scale Revision 2010-Employees recruited on or after 01-04-2006. |
|
75.200 |
- |
Overtime – Regular
Employees |
|
75.210 |
- |
Overtime – Regular
Employees – Relay Testing |
|
75.214 |
- |
Overtime – Regular
Employees – Stores |
|
75.215 |
- |
Overtime – Regular Employees
– Others |
|
75.217 |
- |
Overtime – Regular
Employees – Employees covered under Contributory Pension Scheme |
|
75.230 |
- |
Overtime – Casual Labour
– Relay Testing |
|
75.234 |
- |
Overtime – Casual Labour
– Stores |
|
75.235 |
- |
Overtime – Casual Labour
– Others |
|
75.300 |
- |
Dearness Allowance
– Regular Employees |
|
75.310 |
- |
Dearness Allowance –
Regular Employees – Relay Testing |
|
75.314 |
- |
Dearness Allowance –
Regular Employees(Stores) |
|
75.315 |
- |
Dearness Allowance –
Regular Employees |
|
75.317 |
- |
Dearness Allowance-
Regular Employees – Employees covered under Contributory Pension Scheme |
|
75.340 |
- |
Dearness Allowance –
Casual Labour – Relay Testing |
|
75.344 |
- |
Dearness Allowance –
Casual Labour – Stores |
|
75.345 |
- |
Dearness Allowance –
Casual Labour – Others |
|
75.400 |
- |
Other Allowance |
|
75.410 |
- |
Other Allowances –
Regular Employees – Relay Testing |
|
75.411 |
- |
Other Allowances –
Regular Employees-Employees covered under Contributory Pension Scheme(w.e.f.
April-2010) |
|
75.414 |
- |
Other Allowances –
Regular Employees – Stores |
|
75.415 |
- |
Other Allowances –
Regular Employees – Others |
|
75.416 |
- |
HRA – Regular Employees
–Relay Testing |
|
75.419 |
- |
HRA – Regular Employees
–Stores |
|
75.420 |
- |
HRA – Regular Employees
–Others |
|
75.421 |
- |
CCA – Regular Employees
–Relay Testing |
|
75.424 |
- |
CCA – Regular Employees
–Stores |
|
75.425 |
- |
CCA – Regular Employees
–Others |
|
75.426 |
- |
HRA - Regular Employees –
Employees covered under Contributory Pension Scheme |
|
75.427 |
- |
CCA - Regular Employees –
Employees covered under Contributory Pension Scheme |
|
75.440 |
- |
Other Allowances – Casual
Labour– Relay Testing |
|
75.444 |
- |
Other Allowances – Casual
Labour– Stores |
|
75.445 |
- |
Other Allowances – Casual
Labour– Others |
|
75.446 |
- |
Other Allowances –
Contract A.E/J.E |
|
75.500 |
- |
Bonus and Exgratia |
|
75.510 |
- |
Bonus – Regular |
|
75.520 |
- |
Bonus – Casual |
|
75.530 |
- |
Ex-Gratia |
|
75.600 |
- |
Other Staff Costs |
|
75.611 |
- |
Medical expenses
reimbursement |
|
75.612 |
- |
Leave Travel Assistance |
|
75.616 |
- |
Earned Leave Encashment –
Employees covered under Contributory Pension Scheme. |
|
75.617 |
- |
Earned Leave Encashment |
|
75.618 |
- |
Earned Leave encashment –
Retired / Deceased employees |
|
75.619 |
- |
Retrenchment Compensation |
|
75.629 |
- |
Payment under Workmen’s
Compensation Act |
|
75.630 |
- |
Payment to Helpers /
Employees of Storm & Monsoon gangs |
|
75.700 |
- |
Staff Welfare
Expenses |
|
75.710 |
- |
Honorarium paid to
Medical Consultants |
|
75.711 |
- |
Expenses incurred on
Medical Check-up Camps |
|
75.720 |
- |
Canteen Expenses |
|
75.740 |
- |
Uniform & Livery
Expenses |
|
75.750 |
- |
Recreation Expenses |
|
75.761 |
- |
Fees for Staff training
Courses held by outsiders |
|
75.762 |
- |
Training expenses for
Trainees |
|
75.763 |
- |
Corporation’s
Contribution to Labour Welfare Fund |
|
75.764 |
- |
Janatha Personal Accident
Insurance Scheme |
|
75.765 |
- |
Contribution towards
Deposit linked Insurance Scheme |
|
75.766 |
- |
Administrative charges
for Deposit linked Insurance scheme |
|
75.767 |
- |
Corporation’s portion of
EPF contribution in respect of Contract JEs & Gang men. |
|
75.769 |
- |
Subsidised / Free Supply
of Power |
|
75.770 |
- |
Other Welfare Expenses |
|
75.771 |
- |
Interest subsidy to
employees on HBA / HPA / HEA obtained directly from Financial Institutions |
|
75.772 |
- |
Outstanding Interest
waived on loans and Advances drawn by employees who die while in service |
|
75.800 |
- |
Terminal be,nefits |
|
75.810 |
- |
Terminal Benefits (PF)
Corporation’s Contribution |
|
75.820 |
- |
Terminal Benefits (FPS)
Corporation’s Contribution |
|
75.830 |
- |
Terminal
Benefits(Pension) Corporation’s Contribution |
|
75.831 |
- |
Terminal Benefits – KPTCL
Contribution to Contributory Pension Scheme with effect from 1-4-2006 |
|
75.832 |
- |
Lump sum Compensation
paid to the legal heirs on death of the employee/Officers while in service in
respect of employees/officers appointed on or after 01-04-2006 under NDCP
Scheme. |
|
75.833 |
- |
Lumpsum Compensation paid
to the legal heirs on death of the |
|
75.835 |
- |
Terminal Benefits (Pension
Charges) |
|
75.840 |
- |
Terminal
Benefits(Gratuity) |
|
75.850 |
- |
Provident Fund Inspection
and Audit Charges |
|
75.860 |
- |
Family Benefit Fund
Contribution |
|
75.870 |
- |
Contribution to KPTCL
Life Cover Scheme 1987 |
|
75.880 |
- |
Compensation under KPTCL
life Cover Scheme, 1987 |
|
75.888 |
- |
Employee cost - Contra
Account |
|
75.890 |
- |
Pension & Leave
contribution of employees on deputation. |
|
75.900 |
- |
Employees Cost
Charged to Capital Works |
|
75.910 |
- |
Employees Cost allocable
to ESCOMs(Credit Account) |
|
76.000 |
- |
Adminstration
& General Expenses |
|
76.100 |
- |
Property Related
Expenses |
|
76.101 |
- |
Rent(including lease
rentals) |
|
76.102 |
- |
Rates & Taxes |
|
76.103 |
- |
Expenses incurred towards
Security arrangements at Receiving Stations, etc., |
|
76.104 |
- |
Insurance on Fixed Assets |
|
76.105 |
- |
Insurance on Stocks |
|
76.106 |
- |
Insurance on Assets under
construction |
|
76.107 |
- |
Service line charges paid
to ESCOMs for obtaining power Supply to KPTCL installations |
|
76.110 |
- |
Communication |
|
76.111 |
- |
Pagers, Cellular phones,
E-mail & Other communication charges |
|
76.112 |
- |
Telephone, Trunk call,
Telegrams and Telex Charges |
|
76.113 |
- |
Postage |
|
76.114 |
- |
Mobile phone charges |
|
76.116 |
- |
Air Net, Internet &
Broadband Charges. |
|
76.120 |
- |
Professional
Charges |
|
76.121 |
- |
Legal Charges |
|
76.122 |
- |
Audit Fees |
|
76.123 |
- |
Consultancy charges |
|
76.124 |
- |
Technical Fees |
|
76.125 |
- |
Other Professional
Charges |
|
76.127 |
- |
Remuneration to Private
Contractors engaged for shift and minor maintenance duties of Stations /
MUSS. |
|
76.128 |
- |
Charges paid to Contract
Agencies for house keeping of Guest Houses, Colonies and Offices of KPTCL |
|
76.129 |
- |
Remuneration paid to
Contract Agencies / Services obtained |
|
76.130 |
- |
Conveyance &
Travelling |
|
76.131 |
- |
Conveyance expenses |
|
76.132 |
- |
Travelling expenses |
|
76.133 |
- |
Travelling allowance to
employees |
|
76.134 |
- |
Travelling Allowance to
Contract A.E /J.E |
|
76.136 |
- |
Vehicle running expenses
other than store vehicles |
|
76.137 |
- |
Vehicle hiring expenses |
|
76.138 |
- |
Vehicle License,
Registration fee Taxes and Insurance |
|
76.150 |
- |
Other Expenses |
|
76.151 |
- |
Fees & Subscriptions |
|
76.152 |
- |
Books, Periodicals and
Dairies |
|
76.153 |
- |
Printing & Stationery |
|
76.155 |
- |
Advertisement Expenses |
|
76.156 |
- |
Computer Stationery and
Memory storage mediums |
|
76.157 |
- |
Contributions |
|
76.158 |
- |
Electricity Charges – Tax
on Auxiliary Consumption of KPTCL’s Stations |
|
76.159 |
- |
Statutory Payments as per
Company Act, 1956. |
|
76.160 |
- |
Other Expenses |
|
76.160 |
- |
Water Charges |
|
76.161 |
- |
KPTCL share of
maintenance charges of P&G Trust |
|
76.162 |
- |
Entertainment |
|
76.164 |
- |
Secret Service Grant |
|
76.165 |
- |
Pension and Leave
contributions made in respect of employees of other Departments who are
working in KPTCL on deputation. |
|
76.166 |
- |
Karnataka State Building
& Other Construction Workers Welfare Board CESS |
|
76.190 |
- |
Miscellaneous
Expenses |
|
76.191 |
- |
Compliment Expenses |
|
76.200 |
- |
Materials Related
Expenses |
|
76.201 |
- |
Material Testing Charges. |
|
76.210 |
- |
Freight on Capital
equipments |
|
76.220 |
- |
Other Freight |
|
76.230 |
- |
Transit Insurance |
|
76.240 |
- |
Vehicle Running
Expenses(Stores) |
|
76.250 |
- |
Octroi charges / Entry
Tax |
|
76.260 |
- |
Advertisement of Tenders,
Notices and Other purchase related advertisement |
|
76.270 |
- |
Incidental Store Expenses |
|
76.281 |
- |
Fabrication Charges |
|
76.282 |
- |
Fabrication Charges
absorbed in cost of fabrication / credit |
|
76.888 |
- |
Administration &
General Expenses - Contra Account |
|
76.900 |
- |
Administrative &
General Expenses charged to Capital Works(Credit account) |
|
76.910 |
- |
Administration and
General Expenses allocable to ESCOMs(Credit account) |
|
77.000 |
- |
Depreciation
and Other Costs Relating to Fixed Assets |
|
77.100 |
- |
Depreciation to
Fixed Assets |
|
77.110 |
- |
Amortisation of Lease
Hold Assets |
|
77.120 |
- |
Depreciation on Buildings |
|
77.130 |
- |
Depreciation on Hydraulic
Works |
|
77.140 |
- |
Depreciation on Civil
Works |
|
77.150 |
- |
Depreciation on Plant and
Machinery |
|
77.151 |
- |
Depreciation on Released
Good Asset – Plant & Machinery |
|
77.160 |
- |
Depreciation on Lines,
Cable network etc. |
|
77.161 |
- |
Depreciation on Released
Good Asset – Lines, Cable network etc. |
|
77.170 |
- |
Depreciation on Vehicles |
|
77.171 |
- |
Depreciation on Released
Good Asset – Vehicles. |
|
77.180 |
- |
Depreciation on
furniture, fixtures |
|
77.181 |
- |
Depreciation on Released
Good Asset – Furniture & Fixtures |
|
77.190 |
- |
Depreciation on Office
equipments |
|
77.191 |
- |
Depreciation on Released
Good Asset – Office Equipments |
|
77.200 |
- |
Depreciation to
Fixed Assets |
|
77.210 |
- |
Depreciation on capital
expenditure resulting in an asset not belonging the board |
|
77.220 |
- |
Depreciation on Spare
units / service units |
|
77.230 |
- |
Depreciation on capital
spares at Generating Stations |
|
77.250 |
- |
Depreciation on Assets
taken over from Licensees pending final valuation |
|
77.500 |
- |
Assets
Decommissioning Costs |
|
77.510 |
- |
Site Restoration Costs |
|
77.520 |
- |
Building / Civil Works
Decommissioning Costs |
|
77.540 |
- |
Transmission Lines / Sub
– Station – Decommissioning costs |
|
77.550 |
- |
Other Decommissioning
cost |
|
77.600 |
- |
Small & Low
Value Items Written off |
|
77.610 |
- |
Small & Low value
items Written off |
|
77.611 |
- |
Computer Software |
|
77.700 |
- |
Losses Relating to
Fixed Assets |
|
77.710 |
- |
Written down value of
Assets Scrapped |
|
77.711 |
- |
Loss on Scrapping of
Transformers |
|
77.720 |
- |
Write off of deficit of
Fixed Assets observed upon physical verification |
|
77.730 |
- |
Loss on sale of Fixed
Assets – Plant & Machinery |
|
77.731 |
- |
Loss on sale of Fixed
Assets – Lines, cable net-works, etc., |
|
77.732 |
- |
Loss on sale of Fixed
Assets – Vehicles |
|
77.733 |
- |
Loss on sale of Fixed
Assets – Furniture & Fixtures |
|
77.734 |
- |
Loss on sale of Fixed
Assets – Office equipments |
|
77.800 |
- |
Depreciation on
Intangible Assets |
|
77.801 |
- |
Depreciation on
Intangible assets – Software acquired / Purchased for internal use |
|
77.888 |
- |
Depreciation & Other
cost relating to Fixed Assets- Contra Account |
|
77.899 |
- |
Depreciation on Fixed
Assets Turnkey Works- bills not Received Intermediary Account |
|
77.900 |
- |
Depreciation &
Related Costs Charged to Capital Works(Credit) |
|
78.000 |
- |
Interest
& Other Finance Charges |
|
78.100 |
- |
Interest on State
Government Loans |
|
78.101 |
- |
Interest on delayed
payment of Compensation |
|
78.200 |
- |
Interest on Bonds |
|
78.201 |
- |
Interest on Public Bonds |
|
78.202 |
- |
Interest on Private Bonds |
|
78.300 |
- |
Interest on
Debentures |
|
78.400 |
- |
Interest on Foreign
Currency & Credits |
|
78.500 |
- |
Interest on Other
Loans / Deferred Credits |
|
78.510 |
- |
Interest on loan from
L.I.C |
|
78.511 |
- |
Interest on loans from
SIDBI |
|
78.540 |
- |
Interest on loan from
R.E.C |
|
78.541 |
- |
Interest on apitalized
REC loans |
|
78.543 |
- |
Interest on loans from
ICICI Ltd.,-Capital works |
|
78.544 |
- |
Interest on loans
released by GOI through GOK for APDP works |
|
78.545 |
- |
Interest on inventory
loan from R.E.C |
|
78.546 |
- |
Interest on loans
released by GOI through GOK for Pradhan Manthri Gramodaya Yojana works. |
|
78.547 |
- |
Interest on loan drawn
from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for
BESCOM |
|
78.548 |
- |
Interest on loan drawn
from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for
MESCOM |
|
78.549 |
- |
Interest on loan drawn
from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for
HESCOM |
|
78.550 |
- |
Interest on loan drawn
from Commercial Banks in respect of ongoing SPA Scheme works by KPTCL for
GESCOM |
|
78.551 |
- |
Interest on loan drawn
from REC in respect of ongoing SPA Scheme works by KPTCL for BESCOM |
|
78.552 |
- |
Interest on loan drawn
from REC in respect of ongoing SPA Scheme works by KPTCL for MESCOM |
|
78.553 |
- |
Interest on loan drawn
from REC in respect of ongoing SPA Scheme works by KPTCL for HESCOM |
|
78.554 |
- |
Interest on loan drawn
from REC in respect of ongoing SPA Scheme works by KPTCL for GESCOM |
|
78.555 |
- |
Interest on loan drawn
from Power Finance Corporation Ltd in respect of ongoing schemes by KPTCL for
BESCOM |
|
78.556 |
- |
Interest on loan drawn
from Power Finance Corporation Ltd in respect of ongoing schemes by KPTCL for
MESCOM |
|
78.557 |
- |
Interest on loan drawn
from Power Finance Corporation Ltd in respect of ongoing schemes by KPTCL for
HESCOM |
|
78.558 |
- |
Interest on loan drawn
from Power Finance Corporation Ltd in respect of ongoing schemes by KPTCL for
GESCOM |
|
78.559 |
- |
Interest on loan drawn
from GOK in respect of ongoing APRDP works by KPTCL for BESCOM |
|
78.560 |
- |
Interest on loan drawn
from GOK in respect of ongoing APRDP works by KPTCL for MESCOM |
|
78.561 |
- |
Interest on loan drawn
from GOK in respect of ongoing APRDP works by KPTCL for HESCOM |
|
78.562 |
- |
Interest on loan drawn
from GOK in respect of ongoing APRDP works by KPTCL for GESCOM |
|
78.563 |
- |
Interest on Short term
Loans obtained from Commercial Banks/ Financial Institutions |
|
78.564 |
- |
Interest on Loans
obtained from UCO Bank |
|
78.565 |
- |
Interest on Loans drawn
by KPTCL from UCO Bank on behalf of BESCOM |
|
78.566 |
- |
Interest on Loans drawn
by KPTCL from UCO Bank on behalf of MESCOM |
|
78.567 |
- |
Interest on Loans drawn
by KPTCL from UCO Bank on behalf of HESCOM |
|
78.568 |
- |
Interest on Loans drawn
by KPTCL from UCO Bank on behalf of GESCOM |
|
78.569 |
- |
Interest on Loans
obtained from Vijaya Bank |
|
78.570 |
- |
Interest on loans from
R.E.C for S.P.A Schemes |
|
78.571 |
- |
Interest on APDRP Loan |
|
78.572 |
- |
Interest on PMGY Loan |
|
78.573 |
- |
Interest on loans drawn
from South Indian Bank |
|
78.574 |
- |
Interest on loans drawn
from Punjab National Bank |
|
78.575 |
- |
Interest on loans drawn
from Oriental Bank of Commerce. |
|
78.576 |
- |
Interest on loans drawn
from Corporation Bank |
|
78.577 |
- |
Interest on loans drawn
from Bank of Maharashtra |
|
78.578 |
- |
Interest on loan from
Bank of India |
|
78.579 |
- |
Interest on loan from
Bank of Baroda |
|
78.581 |
- |
Interest on loan from
HUDCO |
|
78.582 |
- |
Interest on loan from
HDFC |
|
78.583 |
- |
Interest on loan from
IDBI |
|
78.584 |
- |
Interest on loan from
Power Finance Corporation |
|
78.587 |
- |
Interest on loan from REC
for OECF Project |
|
78.588 |
- |
Interest on advance
payments made by lease financing companies to manufacturers / suppliers /
sellers |
|
78.589 |
- |
Interest on advance
payments made by IL & FS |
|
78.590 |
- |
Penal Interest on Capital
Liabilities |
|
78.591 |
- |
Interest on loans drawn
from Indian Bank. |
|
78.592 |
- |
Interest on loans drawn
from Bank of Rajasthan. |
|
78.593 |
- |
Interest on Loans drawn
from Punjab and Sind Bank |
|
78.594 |
- |
Interest on Loans drawn
from Canara Bank |
|
78.700 |
- |
Interest on
Borrowings for Working Capital |
|
78.800 |
- |
Other Interest
& Finance Charges |
|
78.810 |
- |
Lease Rent to IL & FS |
|
78.814 |
- |
Lease rent to HDFC |
|
78.841 |
- |
Interest to Suppliers
/Contractors – Capital |
|
78.850 |
- |
Interest on Fixed
Deposits |
|
78.853 |
- |
Interest on Security
Deposits from staff |
|
78.854 |
- |
Interest on Pensioners /
Family Pensioners benefit / Security Fund |
|
78.860 |
- |
COST OF RAISING FINANCE |
|
78.861 |
- |
Stamp Duty |
|
78.862 |
- |
Legal Charges |
|
78.863 |
- |
Advertisements |
|
78.864 |
- |
Service Fee |
|
78.865 |
- |
Credit Fee |
|
78.866 |
- |
Commitment Charges |
|
78.867 |
- |
Other Charges for raising
finance |
|
78.868 |
- |
Guarantee Commission to
Government |
|
78.870 |
- |
DISCOUNTS / REDEMPTION
PREMIUM ON BONDS / DEBENTURES |
|
78.871 |
- |
Discount on Bonds /
Debentures |
|
78.873 |
- |
Redemption on Bonds /
Debentures |
|
78.880 |
- |
OTHER CHARGES |
|
78.881 |
- |
Bank Charges for
remittances between Corporations Offices |
|
78.882 |
- |
Tax on withdrawal of cash
from Current Accounts of KPTCL in Banks. |
|
78.883 |
- |
Other Bank Charges |
|
78.884 |
- |
Guarantee Charges |
|
78.885 |
- |
Commission paid to Banks
for furnishing Bank Guarantee |
|
78.888 |
- |
Interest and other
finance charges- Contra Account |
|
78.890 |
- |
Interest on sums paid by
the State Government under guarantees |
|
78.891 |
- |
Interest on belated
payments in respect of Power purchase from K.P.C |
|
78.892 |
- |
Interest on belated
payments in respect of Power purchase from NTPC |
|
78.893 |
- |
Interest on belated
payments in respect of Power purchase from MAPS |
|
78.894 |
- |
Interest on belated
payments in respect of Power purchase from NLC |
|
78.895 |
- |
Interest on belated
payments in respect of Power purchase from PGCIL |
|
78.896 |
- |
Interest on belated
payments in respect of power purchase from Western Region Electricity Board |
|
78.897 |
- |
Interest on belated
payments in respect of power purchase from Eastern Region electricity Board |
|
78.898 |
- |
Interest on belated
payments in respect of power purchase from Nuclear power corporation of India
ltd KAIGA, Karwar. |
|
78.900 |
- |
Capitalisation of
Interest on Funds used during Construction |
|
78.910 |
- |
Bank Charges commission,
Guarantee Charges and other Charges charged to Capital Works (Credit) |
|
79.000 |
- |
Other
Debits to Revenue Account |
|
79.100 |
- |
Materials Cost
Variance |
|
79.110 |
- |
Materials Cost Variance |
|
79.200 |
- |
Research and
Development Expenses |
|
79.210 |
- |
Research and Development
Expenses |
|
79.211 |
- |
Research and Development
Expenses-RSOP |
|
79.400 |
- |
Bad and Doubtful
Debts Written off/ Provided for |
|
79.410 |
- |
Bad Debts Written off -
Dues from consumers |
|
79.420 |
- |
Bad Debts Written off –
Advances to Suppliers / Contractors |
|
79.430 |
- |
Bad Debts Written off –
Others |
|
79.460 |
- |
Bad & Doubtful Debts provided for - Dues from consumers |
|
79.470 |
- |
Bad & Doubtful Debts
provided for - Advances to Suppliers / Contractors |
|
79.480 |
- |
Bad & Doubtful Debts
provided for - Others |
|
79.500 |
- |
Miscellaneous
Losses & Write offs |
|
79.510 |
- |
Shortages on physical
verification of Stocks. |
|
79.511 |
- |
Loss of materials by
pilferage, etc., |
|
79.520 |
- |
Loss on cash written off |
|
79.530 |
- |
Compensation for
injuries, death and damages – Staff |
|
79.531 |
- |
Compensation for
injuries, death and damages –outsiders. |
|
79.532 |
- |
Infructuous capital
expenditure written-off |
|
79.560 |
- |
Loss on obsolescence of
fixed assets. |
|
79.561 |
- |
Provision for loss on
obsolescence of stores, etc., in stock |
|
79.570 |
- |
Loss on Exchange Rate
Variation |
|
79.571 |
- |
Sundry Debit balance
Written off |
|
79.572 |
- |
Loss on sale of scrap |
|
79.573 |
- |
Loss on sale of stores |
|
79.700 |
- |
Sundry Expenses |
|
79.710 |
- |
Intangible Assets written
off |
|
79.730 |
- |
Provision for
Contingencies. |
|
79.800 |
- |
Losses on Account
of Natural Calamities |
|
79.881 |
- |
Loss to fixed assets on
account of natural calamities |
|
79.882 |
- |
Loss on Stocks on account
of natural calamities |
|
79.883 |
- |
Loss to assets under
construction on account of Natural calamities |
|
79.884 |
- |
Loss on write off of dues
from consumers in areas affected by Flood, |
|
79.888 |
- |
Other debits to revenue
account- Contra Account |
|
79.900 |
- |
Foreign Exchange
Rate Variation and Related Debits Charged to Capital Works |
|
80.000 |
- |
Interest
on Belated Payment of Power Purchase Dues |
|
80.101 |
- |
Interest on belated
payments of Power Purchase dues – Tamil Nadu Electricity Board |
|
80.102 |
- |
Interest on belated
payments of Power Purchase dues- Kerala State Electricity Board |
|
80.103 |
- |
Interest on belated
payments of Power Purchase dues- Maharastra State Electricity Board |
|
80.104 |
- |
Interest on belated
payments of Power Purchase dues-Andhra Pradesh Transmission Company |
|
80.105 |
- |
Interest on belated
payments of Power Purchase dues-Pondichery Electricity Board |
|
80.106 |
- |
Interest on belated
payments of Power Purchase dues –Goa Electricity Board |
|
80.107 |
- |
Interest on belated
payments of Power Purchase dues-GRIDCO |
|
80.108 |
- |
Interest on belated
payments of Power Purchase dues- KPCL |
|
80.109 |
- |
Interest on belated
payments of Power Purchase dues- VVNL |
|
80.110 |
- |
Interest on belated
payments of Power Purchase dues-NTPC – RSTP |
|
80.111 |
- |
Interest on belated
payments of Power Purchase dues- MAPS |
|
80.112 |
- |
Interest on belated
payments of Power Purchase dues – NLC |
|
80.113 |
- |
Interest on belated
payments of Power Purchase dues – PGCIL |
|
80.114 |
- |
Interest on belated
payments of Power Purchase dues – KAIGA |
|
80.115 |
- |
Interest on belated
payments of Power Purchase dues – WREB |
|
80.116 |
- |
Interest on belated
payments of Power Purchase dues – NTPC – ER |
|
80.117 |
- |
Interest on belated
payments of Power Purchase dues – PTCIL |
|
80.118 |
- |
Interest on belated
payments of Power Purchase dues – ITPL |
|
80.119 |
- |
Interest on belated
payments of Power Purchase dues – Ugar Sugars Works Ltd Co generation Plant ,
Ugar |
|
80.120 |
- |
Interest on belated
payments of Power Purchase dues – SMIORE |
|
80.121 |
- |
Interest on belated
payments of Power Purchase dues – Energy Development Co Ltd. |
|
80.122 |
- |
Interest on belated
payments of Power Purchase dues – Bhoruka Power Corporation Ltd |
|
80.123 |
- |
Interest on belated
payments of Power Purchase dues- Murudeshwar Power Corporation Ltd |
|
80.124 |
- |
Interest on belated
payments of Power Purchase dues-Shamanur Sugar Ltd |
|
80.125 |
- |
Interest on belated
payments of Power Purchase dues-JTPCL |
|
80.126 |
- |
Interest on belated
payments of Power Purchase dues – Shree Renuka Sugars Ltd |
|
80.127 |
- |
Interest on belated
payments of Power Purchase dues – Bannari Amman Sugars |
|
80.128 |
- |
Interest on belated
payments of Power Purchase dues-ICL Sugars |
|
80.129 |
- |
Interest on belated
payments of Power Purchase dues – Rayalaseema Alkalies |
|
80.130 |
- |
Interest on belated
payments of Power Purchase dues – Prabhulingeshwar |
|
80.131 |
- |
Interest on belated
payments of Power Purchase dues – Tata Company Ltd. |
|
80.132 |
- |
Interest on belated
payments of Power Purchase dues – South India Paper Mills Ltd. |
|
80.133 |
- |
Interest on belated
payments of Power Purchase dues – Tannir Bhavi Company Ltd., |
|
80.134 |
- |
Interest on belated
payments of Power Purchase dues – Amoga Power Project Ltd., |
|
80.135 |
- |
Interest on belated
payments of Power Purchase dues – Dandeli Steel & Ferro Alloys Ltd., |
|
80.136 |
- |
Interest on belated
payments of Power Purchase dues – Malavalli Power Plant Pvt Ltd., |
|
80.137 |
- |
Interest on belated
payments of Power Purchase dues – Nuziveedu Seeds Ltd., |
|
80.138 |
- |
Interest on belated
payments of Power Purchase dues – Atria Power Corporation Ltd., |
|
80.139 |
- |
Interest on belated
payments of Power Purchase dues – Raythara S.S.K.N |
|
80.140 |
- |
Interest on belated
payments of Power Purchase dues – Vishwanath Sugars Ltd., |
|
80.141 |
- |
Interest on belated
payments of Power Purchase dues – Sri Dodda Ganga Krishna Ltd., |
|
80.142 |
- |
Interest on belated
payments of Power Purchase dues – Dodda Moodalabagilu Power Ltd., |
|
80.143 |
- |
Interest on belated
payments of Power Purchase dues – Arun Engineering |
|
80.144 |
- |
Interest on belated
payments of Power Purchase dues – Globe Generating Power Ltd., |
|
80.145 |
- |
Interest on belated
payments of Power Purchase dues – Atria Brundavan Power Ltd., |
|
80.146 |
- |
Interest on belated
payments of Power Purchase dues – Chamundeshwari Sugars Ltd., |
|
80.147 |
- |
Interest on belated
payments of Power Purchase dues – Subhash Kabini Power Company Ltd., |
|
80.148 |
- |
Interest on belated
payments of Power Purchase dues – ThungaBhadra Steel Products |
|
80.149 |
- |
Interest on belated
payments of Power Purchase dues - Enercon Wind Farms India Ltd., |
|
80.150 |
- |
Interest on belated
payments of Power Purchase dues – Topaz Investment Pvt. Ltd., |
|
80.151 |
- |
Interest on belated
payments of Power Purchase dues – Cepco Industries Pvt. Ltd., |
|
80.152 |
- |
Interest on belated
payments of power purchase dues – BSES. |
|
80.153 |
- |
Interest on belated
payments of power purchase dues – Jamkhandi Sugar Ltd., |
|
80.154 |
- |
Interest on belated
payments of power purchase dues – Godavari Sugar Ltd., |
|
80.155 |
- |
Interest on belated
payments of power purchase dues- Gujarath Electricity Board |
|
80.156 |
- |
Interest on belated
payments of power purchase dues- Chattisgarh State Electricity Board |
|
80.157 |
- |
Interest on belated
payments of power purchase dues- Madhya Pradesh Electricity Board |
|
80.158 |
- |
Interest on belated
payments of power purchase dues - Vijayalakshmi Hydro Power Pvt Ltd |
|
80.159 |
- |
Interest on belated
payments of power purchase dues – Modabagilu Power (Pvt) Ltd |
|
80.160 |
- |
Interest on belated
payments of power purchase dues – Gem Sugars Ltd |
|
80.161 |
- |
Interest on belated
payments of power purchase dues – Prabhat Agri Bio-Tech |
|
80.163 |
- |
Interest on belated
payments of Power Purchase Dues – Suttatti Enterprises Ltd. |
|
80.164 |
- |
Interest on belated
payments of Power Purchase Dues – VXL Systems # II |
|
80.165 |
- |
Interest on belated
payments of Power Purchase Dues – Raja Magnetics Ltd. |
|
80.166 |
- |
Interest on belated
payments of Power Purchase Dues – Mayura Steels Pvt. Ltd. |
|
80.167 |
- |
Interest on belated
payments of Power Purchase Dues – Friends Associate Power Project |
|
80.168 |
- |
Interest on belated
payments of Power Purchase Dues – Texmo Precision Castings |
|
80.169 |
- |
Interest on belated
payments of Power Purchase Dues – RSM Autokast Ltd. |
|
80.170 |
- |
Interest on belated payments
of Power Purchase Dues – Patel Shanti Steels Pvt. Ltd |
|
80.171 |
- |
Interest on belated
payments of Power Purchase Dues – BSES Ltd (1.8MW) |
|
80.172 |
- |
Interest on belated
payments of Power Purchase Dues – Shilpa Antibiotics Ltd. |
|
80.173 |
- |
Interest on belated
payments of Power Purchase Dues – Indan Energy Pvt. Ltd. |
|
80.174 |
- |
Interest on belated
payments of Power Purchase Dues – Savita Chemicals Ltd. |
|
80.175 |
- |
Interest on belated
payments of Power Purchase Dues – Elveety Industries Pvt. Ltd. |
|
80.176 |
- |
Interest on belated
payments of Power Purchase Dues – VXL Systems #I |
|
80.177 |
- |
Interest on belated
payments of Power Purchase Dues – Siddaganga Oil Extractions Ltd. |
|
80.178 |
- |
Interest on belated
payments of Power Purchase Dues – Sharp Pumps Pvt. Ltd |
|
80.179 |
- |
Interest on belated
payments of Power Purchase Dues – Rajanikanth Foundation |
|
80.180 |
- |
Interest on belated payments
of Power Purchase Dues – Panama Business Centre |
|
80.181 |
- |
Interest on belated
payments of Power Purchase Dues – Fiza Developers & Inter Trade. |
|
80.182 |
- |
Interest on belated
payments of Power Purchase Dues – Kamal Trading Co. |
|
80.183 |
- |
Interest on belated
payments of Power Purchase Dues – Maruthi Power Gen (I) Pvt. Ltd. |
|
80.184 |
- |
Interest on belated
payments of Power Purchase Dues – Jindal Aluminium Ltd. |
|
80.185 |
- |
Interest on belated
payments of Power Purchase Dues – Shilpa Medicate Ltd. |
|
80.186 |
- |
Interest on belated
payments of Power Purchase Dues – Cepco Industries Ltd (0.60 MW) |
|
80.187 |
- |
Interest on belated
payments of Power Purchase Dues – MSPL Ltd. |
|
80.188 |
- |
Interest on belated
payments of Power Purchase Dues – NLC TPS Expansion I & II |
|
80.189 |
- |
Interest on belated
payments of Power Purchase Dues – NTPC Talcher Stage II |
|
80.190 |
- |
Interest on belated
payments of Power Purchase Dues – Kalson Power Tech. Ltd |
|
80.191 |
- |
Interest on belated
payments of Power Purchase Dues – Balsaheb M. Ladkat |
|
80.192 |
- |
Interest on belated
payments of Power Purchase Dues – Sanjay D. Ghodawat (HUF) |
|
80.193 |
- |
Interest on belated
payments of Power Purchase Dues – Topaz Investment Ltd. (1.2 MW) |
|
80.194 |
- |
Interest on belated payments
of Power Purchase Dues – Ghodwat Pan Masala |
|
80.195 |
- |
Interest on belated
payments of Power Purchase Dues – Nuziveedu Seeds Ltd. (1.9 MW) |
|
80.196 |
- |
Interest on belated
payments of Power Purchase Dues –Shriram Investment Ltd. |
|
80.197 |
- |
Interest on belated
payments of Power Purchase Dues – Texmo Industries. |
|
80.198 |
- |
Interest on belated
payments of Power Purchase Dues –Shriram City Union Finance Ltd. |
|
80.199 |
- |
Interest on belated payments
of Power Purchase Dues – Shriram Transport Finance Ltd. |
|
80.200 |
- |
Interest on belated
payments of Power Purchase Dues -. Lovely Fragrance. |
|
80.201 |
- |
Interest on belated
payments of Power Purchase Dues – JN Investments. |
|
80.202 |
- |
Interest on belated
payments of Power Purchase Dues – Enercon (Karnataka) Wind Farm (21MW). |
|
80.203 |
- |
Interest on belated
payments of Power Purchase Dues – Mohite & Mohite Pvt. Ltd. |
|
80.204 |
- |
Interest on belated
payments of Power Purchase Dues – Panama Credit & Capital Pvt. Ltd. |
|
80.205 |
- |
Interest on belated
payments of Power Purchase Dues – Shilpa Medicare Ltd. |
|
80.207 |
- |
Interest on belated
payments of Power Purchase Dues – Jindal Aluminum- 6.6 MW |
|
80.208 |
- |
Interest on belated
payments of Power Purchase Dues – Graphite India Limited-1.5 MW |
|
80.209 |
- |
Interest on belated
payments of Power Purchase Dues – MSPL Ltd. – Phase II – 4.75 MW |
|
80.210 |
- |
Interest on belated
payments of Power Purchase Dues – Ramghad Mining – 1.9 MW |
|
80.211 |
- |
Interest on belated
payments of Power Purchase Dues – Ghodawat Panmasala Products (Nandan Hosur
Group) – 5.4 MW |
|
80.212 |
- |
Interest on belated
payments of Power Purchase Dues – International Power Corporation Ltd. – 2.4
MW |
|
80.213 |
- |
Interest on belated
payments of Power Purchase Dues – Encon Service Ltd. – 3 MW |
|
80.214 |
- |
Interest on belated
payments of Power Purchase Dues – NEG Micon Pvt. Ltd. – 3.8 MW |
|
80.215 |
- |
Interest on belated
payments of Power Purchase Dues Pallavi Green Power – 0.75 MW |
|
80.216 |
- |
Interest on belated
payments of Power Purchase Dues – Mansukhmal Investments – 0.95 MW |
|
80.217 |
- |
Interest on belated
payments of Power Purchase Dues – Bhoruka Power Corporation Limited (Shapura
D9)-1 MW |
|
80.218 |
- |
Interest on belated
payments of Power Purchase Dues – Dee Dee Enterprises (Nandan Hosur) – 0.6 MW |
|
80.219 |
- |
Interest on belated
payments of Power Purchase Dues – Bhagyanagar Solvent Extractions Ltd-5.4 MW |
|
80.220 |
- |
Interest on belated
payments of Power Purchase Dues – Supreme Power Company-0.6 MW |
|
80.221 |
- |
Interest on belated
payments of Power Purchase Dues – Royal Energy Company-0.6 MW |
|
80.222 |
- |
Interest on belated
payments of Power Purchase Dues – Prime Lables Company-0.25 MW |
|
80.223 |
- |
Interest on belated
payments of Power Purchase Dues – R.K.Power Gen Pvt Ltd-20 MW |
|
80.224 |
- |
Interest on belated
payments of Power Purchase Dues – Maruthi Power Gen Pvt Ltd (Hemavathy
Project)-1.5 MW |
|
80.225 |
- |
Interest on belated
payments of Power Purchase Dues – Nuziveedu Seeds Ltd (NSL-V)-1.9 MW |
|
80.226 |
- |
Interest on belated
payments of Power Purchase Dues – Nuziveedu Seeds Ltd (NSL-II & III)
–10.5 MW |
|
80.227 |
- |
Interest on belated
payments of Power Purchase Dues – Mahe Ltd-0.25 MW |
|
80.228 |
- |
Interest on belated
payments of Power Purchase Dues – Davangere Sugar Co. Ltd (20 MW) |
|
80.229 |
- |
Interest on belated
payments of Power Purchase Dues – Goetz (I) Financial Ltd.(9.6MW) |
|
80.230 |
- |
Interest on belated
payments of Power Purchase Dues – Sanjay.D. Ghodawat (I) &( II) |
|
80.231 |
- |
Interest on belated
payments of Power Purchase Dues – Channabasappa & Sons (0.60 MW) |
|
80.232 |
- |
Interest on belated
payments of Power Purchase Dues – Associate Autotex Ancillaries Pvt. Ltd
(1.20 MW) |
|
80.233 |
- |
Interest on belated
payments of Power Purchase Dues – Goodluck Syndicate (0.60 MW) |
|
80.234 |
- |
Interest on belated
payments of Power Purchase Dues – Godawat Pan Masala – 4.2 MW |
|
80.235 |
- |
Interest on belated
payments of Power Purchase Dues – Shreya Laxmi Properties (0.60 MW) |
|
80.236 |
- |
Interest on belated
payments of Power Purchase Dues – Shraddha Constructions (6.60 MW) |
|
80.237 |
- |
Interest on belated
payments of Power Purchase Dues – VXL Systems (0.60 MW) |
|
80.238 |
- |
Interest on belated
payments of Power Purchase Dues – Cepco Insustries – 1.2 MW |
|
80.239 |
- |
Interest on belated
payments of Power Purchase Dues – Dee Dee Enterprises (EG) (0.60MW) |
|
80.240 |
- |
Interest on belated
payments of Power Purchase Dues – Samson Distillers Pvt. Ltd.(2 MW) |
|
80.241 |
- |
Interest on belated
payments of Power Purchase Dues – Star Flexi Pack Industries.(0.60 MW) |
|
80.242 |
- |
Interest on belated
payments of Power Purchase Dues – Savitha Chemicals (Encon Group) (0.75 MW) |
|
80.243 |
- |
Interest on belated
payments of Power Purchase Dues – B.S.C Textiles.(VVS)(0.6 MWs) |
|
80.244 |
- |
Interest on belated
payments of Power Purchase Dues – SCM Sugars Ltd.(26 MWs) |
|
80.245 |
- |
Interest on belated
payments of Power Purchase Dues – Sri Indra Power Energies Ltd. |
|
80.246 |
- |
Interest on belated
payments of Power Purchase Dues – Madras Cements Ltd. (VVS) – (0.6 MWs). |
|
80.247 |
- |
Interest on belated
payments of Power Purchase Dues – Suresh Productions Private Limited– (0.75
MWs). |
|
80.248 |
- |
Interest on belated
payments of Power Purchase Dues – Sanghvi Movers Ltd. (0.75 MWs) |
|
80.249 |
- |
Interest on belated
payments of Power Purchase Dues - Eswari Garments (1.5 MWs) |
|
80.250 |
- |
Interest on belated
payments of Power Purchase Dues – Eswari Knitting Works – (3MWs) |
|
80.251 |
- |
Interest on belated
payments of Power Purchase Dues – Eswari Textiles (3.0 MWs). |
|
80.252 |
- |
Interest on belated
payments of Power Purchase – Dues - Victus Associate (1.5 MWs). |
|
80.253 |
- |
Interest on belated
payments of Power Purchase Dues – Shree Doodhganga Krishna Sahakari Karkhane
Niyamit – (24 MWs) |
|
80.254 |
- |
Interest on belated
payments of Power Purchase Dues – Kariganur Iron & Steel (P) Ltd. – (0.75
Mws) |
|
80.255 |
- |
Interest on belated
payments of Power Purchase Dues – Deefree Engineering (P) Ltd.- (0.6 MWs) |
|
80.256 |
- |
Interest on belated
payments of Power Purchase Dues - Poweronicks Ltd (5.4 MWs) |
|
80.257 |
- |
Interest on belated
payments of Power Purchase Dues – NCL Energy Ltd (8.25 MWs) |
|
80.258 |
- |
Interest on belated
payments of Power Purchase Dues - SLS Power Industries Ltd (4.5 MWs) |
|
80.259 |
- |
Interest on belated
payments of Power Purchase Dues – Venkateshwara Power Project Ltd (10 MWs) |
|
80.260 |
- |
Interest on belated
payments of Power Purchase Dues - Sahyadri Power Co. (P) Ltd (0.4 Mws) |
|
80.261 |
- |
Interest on belated
payments of Power Purchase Dues – Koppal Green Power (6 MWs) |
|
80.262 |
- |
Interest on belated
payments of Power Purchase Dues - Meghana Automotives (VVS-20) (0.6 MWs) |
|
80.263 |
- |
Interest on belated
payments of Power Purchase Dues - P. Vijaya Kumar (VVS-22) (0.6 MWs) |
|
80.264 |
- |
Interest on belated
payments of Power Purchase Dues - P. Mohan Lal (VVS-23) (0.6 MWs) |
|
80.265 |
- |
Interest on belated
payments of Power Purchase Dues - Primetex Apparels (VVS-24) (0.6 MWs) |
|
80.266 |
- |
Interest on belated
payments of Power Purchase Dues - Laxmi Organics (VVS-25) (1.2 MWs) |
|
80.267 |
- |
Interest on belated
payments of Power Purchase Dues - Cooper Foundry (VVS-26) (2.4 MWs) |
|
80.268 |
- |
Interest on belated
payments of Power Purchase Dues - Madeo Soaps (VVS-27) (6.0 MWs) |
|
80.269 |
- |
Interest on belated
payments of Power Purchase Dues – Mineral Enterprises (VVS-28) (3.0 MWs) |
|
80.270 |
- |
Interest on belated
payments of Power Purchase Dues – World Institute of Sustain Energy (VVS- 29)
(3.0 MWs) |
|
80.271 |
- |
Interest on belated
payments of Power Purchase Dues – Rajesh Constructions (Suzlon Group) (2.5
MWs) |
|
80.272 |
- |
Interest on belated
payments of Power Purchase Dues – Ferromar Shipping (P) Ltd (1.25 MWs) |
|
80.273 |
- |
Interest on belated
payments of Power Purchase Dues - G.M. Aggrawal (Suzlon Group) (2.5 MWs) |
|
80.274 |
- |
Interest on belated
payments of Power Purchase Dues – Sai Spurthi Power (P) Ltd (10.2 MWs) |
|
80.275 |
- |
Interest on belated
payments of Power Purchase Dues – Unnathi Projects (VVS-30) |
|
80.276 |
- |
Interest on belated
payments of Power Purchase Dues – Jitendra D Majethia (VVS- 31) |
|
80.277 |
- |
Interest on belated
payments of Power Purchase Dues – Brindavan Agro Industries (VVS – 33) |
|
80.278 |
- |
Interest on belated
payments of Power Purchase Dues – GEM Crafts (VVS –34) |
|
80.279 |
- |
Interest on belated
payments of Power Purchase Dues – S.E.Investments Ltd.(VVS–35) |
|
80.280 |
- |
Interest on belated
payments of Power Purchase Dues - Sanjana Power (VVS- 37) |
|
80.281 |
- |
Interest on belated
payments of Power Purchase Dues - International Conveyers (VVS- 38) |
|
80.282 |
- |
Interest on belated
payments of Power Purchase Dues – Swaraj PVC Pipes Ltd (VVS –39) |
|
80.283 |
- |
Interest on belated
payments of Power Purchase Dues - I.G.L India Ltd. (VVS –40) |
|
80.284 |
- |
Interest on belated
payments of Power Purchase Dues - Amrita Bottlers (P) Ltd (VVS –42) |
|
80.285 |
- |
Interest on belated
payments of Power Purchase Dues - M.K. Agrotech (P) Ltd (VVS-43) |
|
80.286 |
- |
Interest on belated
payments of Power Purchase Dues - Abhishek Exports |
|
80.287 |
- |
Interest on belated
payments of Power Purchase Dues - Amitronics Ltd |
|
80.288 |
- |
Interest on belated
payments of Power Purchase - Sanjana Gryogenics |
|
80.289 |
- |
Interest on belated
payments of Power Purchase Dues - Navalakha Translines |
|
80.290 |
- |
Interest on belated
payments of Power Purchase Dues - Mantri Developers |
|
80.291 |
- |
Interest on belated
payments of Power Purchase Dues - Jivraj Tea |
|
80.292 |
- |
Interest on belated
payments of Power Purchase Dues - K.R.E.D.L. |
|
80.293 |
- |
Interest on belated
payments of Power Purchase Dues – Enercon (Krishna) Wind Farms. |
|
80.294 |
- |
Interest on belated
payments of Power Purchase Dues - M/s.Konark Power Project Limited |
|
80.295 |
- |
Interest on belated
payments of power purchase dues - M/s Naranja Sahakari Sakkare Karkhane
Niyamit. |
|
80.296 |
- |
Interest on belated
payments of Power Purchase Dues - Bellary Iron Ores Private Limited |
|
80.297 |
- |
Interest on belated
payments of Power Purchase Dues - Sanmathi Power Company |
|
80.298 |
- |
Interest on belated
payments of Power Purchase Dues - P Venganashetty & Sons |
|
80.299 |
- |
Interest on belated
payments of Power Purchase Dues - Ravikiran Power Project |
|
80.301 |
- |
Interest on belated
payments of Power Purchase dues – M/s Mysore Paper Mills Limited |
|
80.888 |
- |
Interest on belated
payment of Power purchase dues- Contra Account |
|
81.000 |
- |
Provision
for Income tax for the Year |
|
81.100 |
- |
Provision for
Income Tax for The Year |
|
81.888 |
- |
Provision for Income Tax-
Contra Account |
|
83.000 |
- |
Prior
Period Expenses / Losses |
|
83.100 |
- |
Short Provision for
Power Purchased in Previous Years |
|
83.300 |
- |
Operating Expenses
of Previous Years |
|
83.400 |
- |
Excise Duty on generation
relating to previous years |
|
83.500 |
- |
Employee Costs
Relating to Previous Years |
|
83.600 |
- |
Depreciation Under
Provided in Previous Years |
|
83.700 |
- |
Interest and Other
Finance Charges Relating to Previous Years |
|
83.800 |
- |
Other Charges
Relating to Previous Years |
|
83.810 |
- |
Short Provision for
Income tax - previous years |
|
83.820 |
- |
Administrative Expenses –
previous years. |
|
83.821 |
- |
Prior period expenses
relating to Generation – TBHE Board – 20% share |
|
83.830 |
- |
Withdrawal of Revenue
Demand of previous years (LT) |
|
83.831 |
- |
Withdrawal of Revenue
Demand of previous years. (HT) |
|
83.832 |
- |
Withdrawal of Revenue
Demand of previous years - Principal component - IP sets 10HP and below |
|
83.833 |
- |
Withdrawal of Revenue
Demand of previous years - Interest component - IP sets 10HP and below |
|
83.834 |
- |
Withdrawal of (ANC)
miscellaneous accounted in previous year (w.e.f. |
|
83.835 |
- |
Withdrawal of revenue
demand as credit adjustment. |
|
83.836 |
- |
Credit Adjustment through
Balance Transfer system |
|
83.830 |
- |
Withdrawal of Revenue
Demand of previous years (LT) |
|
83.831 |
- |
Withdrawal of Revenue
Demand of previous years. (HT) |
|
83.832 |
- |
Withdrawal of Revenue
Demand of previous years - Principal component - |
|
83.833 |
- |
Withdrawal of Revenue
Demand of previous years - Interest component - |
|
83.834 |
- |
Withdrawal of (ANC)
miscellaneous accounted in previous year (w.e.f. |
|
83.835 |
- |
Withdrawal of revenue
demand as credit adjustment. |
|
83.836 |
- |
Credit Adjustment through
Balance Transfer system |
|
83.830 |
- |
Withdrawal of revenue
demand of previous years – BESCOM |
|
83.831 |
- |
Withdrawal of revenue
demand of previous years – MESCOM |
|
83.832 |
- |
Withdrawal of revenue
demand of previous years – HESCOM |
|
83.833 |
- |
Withdrawal of revenue
demand of previous years – GESCOM |
|
83.834 |
- |
Withdrawal of
Miscellaneous Income accounted in previous year |
|
83.835 |
- |
Withdrawal of revenue
demand of previous years – Hukkeri Electric Co-operative Society |
|
83.836 |
- |
Withdrawal of revenue
demand of previous years – CESCO |
|
83.840 |
- |
Materials related
expenses - previous years. |
|
83.850 |
- |
Other Expenses relating
to prior periods |
|
83.888 |
- |
Other charges relating to